Chapter 9, Problem 9.18P
To determine
Calculate the primary consolidation settlement of the foundation.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
A plan of a foundation 1 m x 2 m is shown in Figure 4-2.
a. Estimate the consolidation settlement of the foundation.
b. Refer to part a. Given for the clay layer: Ca=0.02. Estimate the total consolidation settlement eight
years after the completion of the primary consolidation settlement.
(Note: Time for completion of primary consolidation settlement is 1.5 years).
15m
0.5 m
9=170 kN/m²(net stress increase)
BXL 1m x 2m
Sand
Y = 16.5 kN/m
Groundwater table
Sand
25m
Figure 4-2
=
You 17.5 kN/m³
Normally consolidated clay
y = 16 kN/m³
ea 0.78
E = 6,000 kN/m² C, = 0.32
C₁ = 0.09
A. = 0.5
2) A rectangular (5ft by 8ft) foundation will be built on the soil profile shown in the figure.
Calculate the primary consolidation settlement below the center of the foundation. Assume the
clay layer shown in the figure is normally consolidated. For simplicity, do not subdivide the
clay into multiple sublayers.
AG = 1500 lb/ft?
Dry sand
*120 pet
Clay,Ce =0.28
e,= 0.55
Ya 125 pct
Bedrock (Impermeable)
A foundation with dimensions BxL supporting a column load, P. The foundation rests on a
sandy soil underlain by a clay layer (consolidation test result in Problem 2).
• Estimate the primary consolidation settlement of the clay due to the foundation load.
• What is the void ratio at the end of primary consolidation?
• Calculate the secondary Consolidation settlement after 6 years knowing that the primary
consolidation settlement took 2.5 years.
Given:
P = 350 kN, B =L=2.5 m, Df= 2 m, H1= 3 m, and H2=4.5 m.
The soil properties are as follows:
Sand: ya = 16.4 kN/m³; ysat = 18.8 kN/m³
Clay: Ysat = 17.6 kN/m²; eo = 0.82, Ca=0.02
Sand
D
Yd
H
GWT
BxL
Ysat
Clay
Ysat
Sandy gravel
Chapter 9 Solutions
Fundamentals of Geotechnical Engineering (MindTap Course List)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- Estimate the ultimate consolidation settlement under the centerline of a 15 X 15 m mat foundation. The mat is 1 m thick reinforced concrete and the average stress on the surface of the slab is 75 kPa. The soil profile is shown below. Oedometer tests on samples of the clay provide these average values. ’p = 130 kPa, Cc = 0.40, Cr = Cs = 0.03 Neglect any settlements due to the sand layer. Please and thank you!! :)arrow_forwardKINDLY GET THE REAL ANSWER WITH EXPLAIN STEP Given that B =1 m, L = 3 m, and Q = 110 kN, the soil characteristics given in the figure are Cs = 1/5 Cc, Ꝺ’c= 40 kN/m2. Field monitoring indicated that the foundation settlement was 19 mm during the first 12 months. Estimate the average stress increase in the clay layer due to the applied load. Estimate the primary consolidation settlement. What is the degree of consolidation after 12 months? Estimate the coefficient of consolidation for the pressure range. Estimate the settlement in 24 months.arrow_forwardRefer to Figure 11.41. Given that B =1 m, L = 3 m, and Q = 110 kN, the soil characteristics given in the figure are Cs = 1/5 Cc, Ꝺ’c= 40 kN/m2. Field monitoring indicated that the foundation settlement was 19 mm during the first 12 months. Estimate the average stress increase in the clay layer due to the applied load. Estimate the primary consolidation settlement. What is the degree of consolidation after 12 months? Estimate the coefficient of consolidation for the pressure range. Estimate the settlement in 24 months.arrow_forward
- KINDLY OBTAIN THE RIGHT ANSWER AND EXPLAIN Refer to Figure. Given that B =1 m, L = 3 m, and Q = 110 kN, the soil characteristics given in the figure are Cs = 1/5 Cc, Ꝺ’c= 40 kN/m2. Field monitoring indicated that the foundation settlement was 19 mm during the first 12 months. Estimate the average stress increase in the clay layer due to the applied load. Estimate the primary consolidation settlement. What is the degree of consolidation after 12 months? Estimate the coefficient of consolidation for the pressure range. Estimate the settlement in 24 months.arrow_forwardRefer to Figure 11.41. Given that B =1 m, L = 3 m, and Q = 110 kN, the soil characteristics given in the figure are Cs = 1/5 Cc, Ꝺ’c= 40 kN/m2. Field monitoring indicated that the foundation settlement was 19 mm during the first 12 months. a. Estimate the average stress increase in the clay layer due to the applied load. b. Estimate the primary consolidation settlement. c. What is the degree of consolidation after 12 months? d. Estimate the coefficient of consolidation for the pressure range. e. Estimate the settlement in 24 months. Answer must be: A. 6.33 B. 32.82 C. 57.89 D. 0.0013 E. 25.66arrow_forward11.12 A 2-m clay layer in the field has a current effective stress, oó= 70 kN/m?. There is a net stress increase, Ao = 180 kN/m², due to a foundation load. Calculate the expected primary consolidation settlement. The results of a consolidation test on the clay are given below. o' (kN/m) 0.98 12 0.94 50 0.82 200 0.73 400 ©Cngage lamng 2014arrow_forward
- answer in 3 decimal places ty :)arrow_forward11.12 A 2-m clay layer in the field has a current effective stress, o= 70 kN/m. There is a net stress increase, Ao = 180 kN/m², due to a foundation load. Calculate the expected primary consolidation settlement. The results of a consolidation test on the clay are given below. o' (kN/m?) e 0.98 12 0.94 50 0.82 200 0.73 400 © Cengage Leaming 2014arrow_forward75% consolidation in a laboratory test? 11.21 Refer to Figure 11.48. A square foundation, 2.5 × 2.5 m in size, supports a col- umn load of 478 kN. The soil characteristics are given in the figure. Field moni- toring indicated that the foundation settlement was 46 mm at the end of 2 years a. Estimate the average stress increase in the clay layer due to the applied load. b. Estimate the primary consolidation settlement. c. What is the degree of consolidation after 2 years? d. Estimate the coefficient of consolidation for the pressure range. e. Estimate the settlement in 3 years. 478 kN 2.5 m x 2.5 m 1.5 m Y = 16 kN/m GWT 1.75 m Yu = 18.8 kN/m³ w = 19% G, = 2.71 LL = 37 3.5 m o = 65 kN/m? C,= 1/SC. %3D O Sand A Clay Figure 11.48arrow_forward
- Estimate the ultimate consolidation settlement under the centerline of a 25 x 25 meter mat foundation. The mat is 1.5 meter thick reinforced concrete (ϒconcrete = 23.6 kN / m3), and the average stress on the surface of the slab is 125 kPa. The soil profile is shown in the figure below. Lab testing on samples of the clay showed that the clay is normally consolidated and that Cc = 0.40, Cr = 0.03, and eo = 1.13. Neglect any settlements due to the sand layer. Divide the clay layer into four thinner layers of thickness 2.0, 2.0, 3.0, and 3.0 meters.arrow_forwardGiven that B =1 m, L = 3 m, and Q = 110 kN, the soil characteristics given in the figure are Cs = 1/5 Cc, Ꝺ’c= 40 kN/m2. Field monitoring indicated that the foundation settlement was 19 mm during the first 12 months. Estimate the average stress increase in the clay layer due to the applied load. Estimate the primary consolidation settlement. What is the degree of consolidation after 12 months? Estimate the coefficient of consolidation for the pressure range. Estimate the settlement in 24 months.arrow_forwardAnswer in three decimal places pleasearrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage LearningFundamentals of Geotechnical Engineering (MindTap...Civil EngineeringISBN:9781305635180Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage LearningPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781305081550Author:Braja M. DasPublisher:Cengage Learning
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Geotechnical Engineering (MindTap...
Civil Engineering
ISBN:9781305635180
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781305081550
Author:Braja M. Das
Publisher:Cengage Learning