EBK PRINCIPLES OF OPERATIONS MANAGEMENT
11th Edition
ISBN: 9780135175859
Author: Munson
Publisher: VST
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 9, Problem 21P
Summary Introduction
To balance: The assembly line.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
An assembly plant for the Blood Pressure RX, a portable blood pressure device, has
400
minutes available daily in the plant for the device, and the average demand is
80
units per day. Final assembly requires 6 separate tasks. Information concerning these tasks is given in the following table.
Task
Performance Time (minutes)
Task Must Follow Task Listed Below
A
4
-
B
1
-
C
1
A, B
D
3
C
E
4
D
F
2
E
b) Given the demand, what is the cycle time for this operation?
The cycle time for this operation is
enter your response here
minutes/unit (enter your response as a whole number).
c) What is the theoretical minimum number of workstations?
The theoretical minimum number of workstations is
enter your response here
stations (enter your response as a whole number and, if your unrounded answer includes decimal values,…
Kiko Teddy Bear is a manufacturer of stuffed teddy bears. Kiko would like to be able to produce 40 teddy bears per hour on its assembly line. The following information will assist in answering the questions that follow:
Task Information for Kiko Teddy Bear
What is the maximum possible output of the line?
What is the theoretical minimum number of workstations using the cycle time computed in” b “above
Assign tasks to workstations using the cycle time in “b” above.
snip
Chapter 9 Solutions
EBK PRINCIPLES OF OPERATIONS MANAGEMENT
Ch. 9 - Prob. 1EDCh. 9 - Prob. 1DQCh. 9 - Prob. 2DQCh. 9 - Prob. 3DQCh. 9 - Prob. 4DQCh. 9 - Prob. 5DQCh. 9 - Prob. 6DQCh. 9 - Prob. 7DQCh. 9 - Prob. 8DQCh. 9 - Prob. 9DQ
Ch. 9 - Prob. 10DQCh. 9 - Prob. 11DQCh. 9 - Prob. 12DQCh. 9 - Prob. 13DQCh. 9 - Prob. 14DQCh. 9 - Prob. 15DQCh. 9 - Prob. 16DQCh. 9 - Prob. 17DQCh. 9 - Prob. 18DQCh. 9 - Prob. 1PCh. 9 - Prob. 2PCh. 9 - Prob. 3PCh. 9 - Roy Creasey Enterprises, a machine shop, is...Ch. 9 - Adam Munson Manufacturing, in Gainesville,...Ch. 9 - Prob. 6PCh. 9 - Prob. 7PCh. 9 - Prob. 8PCh. 9 - Prob. 9PCh. 9 - Six processes are to be laid out in six areas...Ch. 9 - Stanford Rosenberg Computing wants to establish an...Ch. 9 - Illinois Furniture, Inc., produces all types of...Ch. 9 - Prob. 14PCh. 9 - The Action Toy Company has decided to manufacture...Ch. 9 - Prob. 16PCh. 9 - Prob. 17PCh. 9 - Prob. 18PCh. 9 - Prob. 19PCh. 9 - Prob. 20PCh. 9 - Prob. 21PCh. 9 - Prob. 22PCh. 9 - Prob. 23PCh. 9 - Prob. 25PCh. 9 - Prob. 26PCh. 9 - Prob. 27PCh. 9 - Prob. 1CSCh. 9 - Prob. 2CSCh. 9 - Henry Coupe, the manager of a metropolitan branch...Ch. 9 - Prob. 4CSCh. 9 - Prob. 1.1VCCh. 9 - Prob. 1.2VCCh. 9 - Prob. 1.3VCCh. 9 - Prob. 1.4VCCh. 9 - Prob. 1.5VCCh. 9 - Prob. 1.6VCCh. 9 - Prob. 2.1VCCh. 9 - Prob. 2.2VCCh. 9 - Prob. 2.3VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- The trim line at PW is a small subassembly line that, alongwith other such lines, feeds int1, o the final chassis line.The entire assembly line, which consists of more than 900workstations, is to make PW’s new E cars. The trim line itselfinvolves only 13 work elements and must handle 20 cars perhour. Work-element data are as follows:Work Element Time (Sec) Immediate Predecessor(s)A 2.4 NoneB 0.5 NoneC 2.1 NoneD 1.8 CE 1.1 BF 0.9 A G 2 AH 0.7 FI 0.7 DJ 1.8 H, EK 1.3 JL 1.9 GM 1.1 L, I, Ka. Draw a precedence diagram.b. What cycle time (in minutes) results in the desired outputrate?c. What is the theoretical minimum number of stations?d. Use the longest work element decision rule to balance theline and calculate the efficiency of your solution.e. Use the most followers work element decision rule tobalance the line and calculate the efficiency of yoursolution.arrow_forwardXYZ company provides labor and space for the manufacturing and assembly operations and stocking various inventory items for production such as wire, cables, some electronic components, etc. XYZ company orders a variety of components and raw materials by contract. The company recently hired 100 part-time employees working four to six-hour shifts. Skilled employees must do several raw material conversions for packaging—there are currently three (3) such employees. The plant layout is a typical process layout - machines of similar types are located together. Each machine and employee must be scheduled over the day and the standard time period for planning is one (1) hour. Material handling is mainly done manually, although the company would like to consider conveyors or other automation to aid in automating their processes. XYZ company forecasts planned production for two (2) years on a rolling quarterly basis. Often, the customer changes the forecast, and these changes can occur as…arrow_forwardA production line is to be designed to make 500 El-More dolls per day. Each doll requires 11 activities totaling 16 minutes of work. The factory operates 750 minutes per day. What is the required cycle time for this assembly line?arrow_forward
- Define process batch and transfer batch and their meaning in each of these applications: MRP, JIT, and bottleneck or constrained resource logic.arrow_forwardManufacturing Company uses FIFO method of accumulating costs in a two-department process. Materials are introduced at the inception of the process except for a special material which is added in department 2 at 60% completion as to overhead. Inspection is done at the end of the process in both departments. Production data for Department 2 are given below: In process, beginning, (80% labor, 70% overhead)2,000 Transferred in 14,900 In process, ending (40% labor, 20% overhead) 3,000 Normal spoilage 200 Abnormal spoilage (found at 30% completion as to laborand 15% as to overhead due to internal failure) 400 Cost data for the month:In process beginning:Transferred in 15,020 Special materials 1,900 Direct labor 4,388 Overhead 11,044 Current costs:Transferred in 137,080 Special materials 14,030 Direct labor 46,000 Overhead 113,564 The cost of units transferred to finished goods is?The cost of spoilage charged to revenue is?arrow_forwardDiscuss the concept of “drum–buffer–rope.”arrow_forward
- The following table contains order-dependent setup times for four jobs. For safety reasons, jobC cannot follow job A, nor can job A follow job C. Determine the processing sequence that willminimize the total setup time. (Hint: There are 12 alternatives.)Following Job’sSetup Time (hrs.)SetupTime (hrs.) A B C DPrecedingjobA 2 — 5 × 4B 1 7 — 3 2C 3 x 2 — 2D 2 4 3 6 —arrow_forwardTailwind, Inc., produces high-quality but expensive training shoes for nmners. The Tailwind shoe, which sells for $210, contains both gas- and liquid-filled compartments to provide morestability and better protection against knee, foot, and back injuries. Manufacturing the shoes requires 10 separate tasks. There are 400 minutes available for manufacturing the shoes in the plant each day. Daily demand is 60. The information for the tasks is as follows: a) Draw the precedence diagram.b) Assign tasks to thl e minimum feasible number of workstations according to the "ranked positioned weight" decision rule.c) What is the efficiency of the process you completed in (b)?d) What is the idle time per cycle?arrow_forwardBalancing a production line includes the following tasks, EXCEPT: O Finding a cycle time in which each workstation can complete its tasks Take into account precedence relationships among tasks Identify the task with the longest operation time O Calculate the number of workstations that completes the job in the minimum amount of timearrow_forward
- Tailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwind shoe, which sells for $210, contains both gas- and liquid-filled compartments to provide more stability and better protection against knee, foot, and back injuries. Manufacturing the shoes requires 10 separate tasks. There are 400 minutes available for manufacturing the shoes in the plant each day. Daily demand is 60. The information for the tasks is as follows: Performance Time Task Must Follow This Task ABCDEFGHI · Task (in minutes) А В Е Н 1 -324-325- - A B B C, D A F G E, H J 3 | Total 25 Required: a. Draw the precedence diagram showing the task precedence and their times b. Determine the cycle time associated with the rate of output required. c. What is the theoretical minimum number of work stations required to satisfy this output rate? d. Allocate the tasks to work stations taking into consideration the precedence requirements and using the LOT rule to break ties between feasible tasks.…arrow_forwardThe Southeastern Sports Company produces golf clubs on an assembly line in its plant in Marietta, Georgia. The final assembly of the woods requires the eight operations given in the following table. (given) a. Draw a network to represent the assembly operation.b. What is the minimum cycle time that can be considered? Determine the balance that results from the ranked positional weight technique for this cycle time.c. By experimentation, determine the minimum cycle time that can be achieved with a three-station balance.arrow_forwardThe photo shows the layout of a fish smoking plant doing batch production. The smokehouse and the smoking protocol that they are using can have three (3) production runs in an eight-hour workday. However, due to constraints and delays, their actual output is only 2 production runs/batches (design capacity: 4 runs; effective capacity: 3 runs; actual capacity: 2 runs). Based on the existing plant facility layout, identify the parts that cause the constraints like delays. Solve for Efficiency and Utilization. Suggest an alternative layout by moving/transferring the processing areas (blue boxes) to make the production system more efficient. Take note, though, that the smokehouse and the drying facility (yellow boxes) are built-in and immovable. Give a short rationale for each recommendation.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY