Operations Management
11th Edition
ISBN: 9780132921145
Author: Jay Heizer
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 8, Problem 17P
a)
Summary Introduction
To Perform: A volume analysis.
b)
Summary Introduction
To determine: The change in answer.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Peter Billington Stereo, Inc., supplies car radios to auto manufacturers and is going to open a new plant. The company is undecided between Detroit and Dallas as the site. The fixed costs in Dallas are lower due to cheaper
land costs, but the variable costs in Dallas are higher because shipping distances would increase.
Dallas
$600,000
$27/radio
Detroit
$840,000
$21/radio
a) Based on the analysis of the volume, after rounding the numbers to the nearest whole number, Dallas is best below and Detroit is best above 40,000
b) Dallas's fixed costs have increased by 10%. Based on the analysis of the volume, after rounding the numbers to the nearest whole number, Dallas is best below and Detroit is best above
Fixed costs
Variable costs
radios
radios
Brian Trump has obtained fixed- and variable-cost information for four potential sites for his professional wrestling school and summarized it in tabular form below. All values are in dollars.
Site
Fixed Cost
Variable Cost
A
10,000
24
B
12,000
20
C
14,000
18
D
16,000
17
Brian plans to charge the same amount for tuition regardless of where he decides to establish his school. If he believes that 700 students will matriculate each year, which site will result in the lowest total cost?
A firm that recently experienced an enormous growth rate is seeking to lease a small plant in Memphis, TN; Biloxi MS; or Birmingham, AL. Prepare an economic analysis of the three locations giving the following information. Annual costs for building, equipment, and administration would be $64,000 for Memphis, $74,000 for Biloxi, and $109,000 for Birmingham. Labor and materials are expected to be $7 per unit in Memphis, $6 per unit in Biloxi, and $6 per unit in Birmingham. The Memphis location would increase system transportation costs by $63,000 per year, the Biloxi location by $73,500 per year, and the Birmingham location by $25,900 per year. Expected annual volume is 14,900 units.
Total Cost
Memphis _______________
Biloxi _______________
Birmingham _________________
Chapter 8 Solutions
Operations Management
Ch. 8 - Prob. 1DQCh. 8 - Prob. 2DQCh. 8 - Prob. 3DQCh. 8 - Prob. 4DQCh. 8 - Prob. 5DQCh. 8 - Prob. 6DQCh. 8 - Prob. 7DQCh. 8 - Prob. 8DQCh. 8 - Prob. 9DQCh. 8 - Prob. 10DQ
Ch. 8 - Prob. 11DQCh. 8 - Prob. 12DQCh. 8 - Prob. 13DQCh. 8 - Prob. 14DQCh. 8 - Prob. 15DQCh. 8 - Prob. 16DQCh. 8 - Prob. 17DQCh. 8 - Prob. 18DQCh. 8 - Prob. 19DQCh. 8 - Prob. 1PCh. 8 - Prob. 2PCh. 8 - Prob. 3PCh. 8 - Prob. 4PCh. 8 - Prob. 5PCh. 8 - Prob. 6PCh. 8 - Prob. 7PCh. 8 - Prob. 8PCh. 8 - Prob. 9PCh. 8 - Prob. 10PCh. 8 - Prob. 11PCh. 8 - Prob. 12PCh. 8 - Prob. 13PCh. 8 - Prob. 14PCh. 8 - Prob. 15PCh. 8 - Prob. 16PCh. 8 - Prob. 17PCh. 8 - Prob. 18PCh. 8 - Prob. 19PCh. 8 - Prob. 20PCh. 8 - Prob. 21PCh. 8 - Prob. 22PCh. 8 - Prob. 23PCh. 8 - Prob. 24PCh. 8 - Prob. 25PCh. 8 - Prob. 1CSCh. 8 - Prob. 2CSCh. 8 - Prob. 3CSCh. 8 - Prob. 4CSCh. 8 - Prob. 1.1VCCh. 8 - Prob. 1.2VCCh. 8 - Prob. 1.3VCCh. 8 - Prob. 2.1VCCh. 8 - Prob. 2.2VCCh. 8 - Prob. 2.3VCCh. 8 - Prob. 2.4VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Q2k Audi is considering three locations A, B and C for the production of its new model SUV XL500. The objective is to choose the location with the lowest costs. The costs are measured as annual fixed costs plus the variable costs of the product. The following data has been collected for the three locations.< Region Fixed costs per year A B C 10 000 000 20 000 000 25 000 000 Variable cost per unit 1. at what level of production will C be the best choice? 2. at what production rate will A be the best choice? 3. at what level of production will B be the best choice? 2500 2000< 1000< The company's projected annual production in the new plant is 0-60 000 units.< Askarrow_forwardA firm that has recently experienced enormous growth is seeking to lease a small plant in Memphis, TN; Biloxi, MS; or Birmingham, AL. Prepare an economic analysis of the three locations given the following information: Annual costs for building, equipment, and administration would be $40,000 for Memphis, $60,000 for Biloxi, and $100,000 for Birmingham. Labor and materials are expected to be $8 per unit in Memphis, $4 per unit in Biloxi, and $5 per unit in Birmingham. The Memphis location would increase system transportation costs by $50,000 per year, the Biloxi location by $60,000 per year, and the Birmingham location by $25,000 per year. Expected annual volume is 10,000 units. 6.arrow_forward~m8h5q2~arrow_forward
- ABC Ltd. Wants to choose the best location for its new aluminum plant. The manager ofproductions and operations has three possible locations to choose from. His assistantrecommends that he use break-even analysis location technique to help determine whichlocation is best based on costs. Assuming: Total fixed cost = 80,000 Price per unit= 20 AVC (Average variable cost) = 40 Break-even point= Total fixed cost / (AVC-Price per unit) Break-even point = 80,000/ (40-20) Break-even point = 4,000 1) Demonstrate to the OM manager how to go about choosing the best location using thenumerical example designed above.arrow_forwardSap Manufacturing, a manufacturing company that manufactures football jerseys and located in Port Antonio, Jamaica, is preparing to build a new plant. J’s is considering three potential locations that are suitable for the construction of the plant. The fixed and variable costs for the three alternative locations are presented in the table below. Identify the range over which each alternative (A, B and C) is best.arrow_forwardFruit Centre Ice Cream Parlor is deciding where to locate a new facility. The annual fixed costs, initial fixed costs and variable costs for each site have been estimated as follows; Location Annual Fixed Costs (shs) Initial Fixed costs selling price (shs) Variable costs(shs) Namugongo 35,000 400,000 200/unit 200/unit Kireka 19,000 250,000 400/unit 45/unit Banda 15,000 200,000 600/unit 2500/unit Ntinda 95,000 170,000 100/unit 360/unit If demand is expected to be 2000 units, which location is best? and Forecasting is a key component in operations management. Identify and describe any three methods of forecasting that you would recommend to a service industry.arrow_forward
- Please solve the attachedarrow_forwardDevelop a network showing the origin nodes, destinations, arcs, cost per arc, supply, and demand. Match the correct answer to each question. Warehouse A B C D City E City F City G City H Warehouse Supply. 0.51 0.21 0.52 0.41 4000 Question 1 0.31 Question 2 0.56 0.43 0.35 0.41 0.28 City Demand 4,400 3,000 6,500 4,700 Match the correct answer to the following questions: 1. What is the supply constraint for Warehouse D? 2. What demand constraint for City H? 0.32 0.54 0.33 4000 0.54 0.34 0.52 6300 6000 [Choose ] [Choose ] > >arrow_forwardOn the cost- volume analysis chart where the costs of two or more location alternatives have been plotted, the quantity at which two cost curves cross is the quantity at which:a) fixed costs arc equal for two alternative locations.b) variable costs are equal for two alternative locations.c) total costs are equal for all alternative locations.d) fixed costs equal variable costs for one location.c) total costs are equal for two alternative locations.arrow_forward
- William Green, vice president of manufacturing for computer products (CPC), and his staff are studying three midwestern alternative locations for a new production facility for producing high-resolution scanners. His staff analysts predict that the scanners will be a growing market over the next ten years, and the analyst's group shares marketing's enthusiasm for planning facilities for producing this new product line. The analysts have developed these estimates for the three locations; In what range of production volume would each of the locations be preferred (at the minimum cost)? Variable cost locations Annual Fixed costs per scanner Cleveland, Ohio $390,000 $34 South Bend, Indiana $360,000 $37 Grand Rapids, Michigan $310,000 $40arrow_forwardExplain how tapering rates, blanket rates, commercial zones, foreign trade zones, and in-transit privileges affect the facility location decision.arrow_forwardSam Hutchins is planning to operate a specialty bagel sandwich kiosk but is undecided about whether to locate in the downtown shopping plaza or in a suburban shopping mall. Based on the following data, which location would you recommend? Location Downtown Suburban Annual rent, including utilities Expected annual demand (sandwiches) Average variable costs per sandwich Average selling price per sandwich $12,000 30,000 $1.50 $3.25 $8,000 25,000 $1.00 $2.85arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,