To recommend: The best resort location using the factor rating method.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Sap Manufacturing, a manufacturing company that manufactures football jerseys and located in Port Antonio, Jamaica, is preparing to build a new plant. J’s is considering three potential locations that are suitable for the construction of the plant. The fixed and variable costs for the three alternative locations are presented in the table below.
Identify the range over which each alternative (A, B and C) is best.
Tolkien Transport is currently based in Leeds but has plans to expand its operations by setting up another depot in the south of England. The management team has identified four possible locations for the depot and these are listed in the decision matrix below. As a first step they have decided to use a multi-criteria analysis (MCA) to rank the options. After much discussion, the team have decided on three key criteria (Cost, Accessibility and Environmental Impact) against which to judge the options and have agreed on the ratings shown in the matrix, below (running from 4 for the best to 1 for worst under each criterion). The criteria have been weighted as follows: Cost (0.45), Accessibility (0.35) and Environmental Impact (0.2).
Option
Cost
Accessibility
Environmental Impact
Bristol
4
2
1
Reading
3
3
2
Swindon
1
4
3
Chelmsford
2
1
4
Required:
Given the information above, which location would you advise Tolkien Transport to…
basis
K-
Pan American Refineries, headquartered in Houston, must decide among three sites for the construction of a new oil-processing center. The firm has selected the six factors listed below as a
for evaluation and has assigned rating weights from 1 to 5 on each factor. Subhajit Chakraborty, the CEO, has rated each location for each factor on a 1 to 100 point basis. In the table below, the
rating weights and the rating value for each of the locations on the factor are presented:
Factor
1
2
3
4
5
6
Factor Description
Proximity to port facilities
Power-source availability and cost
Workforce attitude and cost
Distance from Houston
Rating Weight
5
3
3
3
1
2
Location A Location B
70
70
85
75
50
65
75
60
55
10
100
50
Location C
80
100
75
60
85
90
Community desirability
Equipment suppliers in area
a) Based on the given information, the best location for Pan American Refineries is
, with a total weighted score of. (Enter your response as an integer)
b) If Location B's score for Proximity to…
Chapter 7 Solutions
Operations and Supply Chain Management 9th edition
Ch. 7.S - Prob. 1QCh. 7.S - Prob. 2QCh. 7.S - Prob. 3QCh. 7.S - Prob. 4QCh. 7.S - Prob. 5QCh. 7.S - Prob. 7QCh. 7.S - Prob. 1PCh. 7.S - Prob. 2PCh. 7.S - Prob. 3PCh. 7.S - Prob. 4P
Ch. 7.S - Prob. 5PCh. 7.S - Prob. 6PCh. 7.S - Prob. 7PCh. 7.S - Prob. 8PCh. 7.S - Prob. 12PCh. 7.S - Prob. 13PCh. 7.S - Prob. 14PCh. 7.S - Prob. 15PCh. 7.S - Prob. 16PCh. 7.S - Prob. 17PCh. 7.S - Prob. 18PCh. 7.S - Prob. 19PCh. 7.S - Prob. 20PCh. 7.S - Prob. 21PCh. 7.S - Prob. 22PCh. 7.S - Prob. 23PCh. 7.S - Prob. 24PCh. 7.S - Prob. 25PCh. 7.S - Prob. 26PCh. 7.S - Prob. 27PCh. 7.S - Prob. 1.1CPCh. 7 - Prob. 1QCh. 7 - Prob. 2QCh. 7 - Prob. 3QCh. 7 - Prob. 4QCh. 7 - Prob. 5QCh. 7 - Prob. 8QCh. 7 - Prob. 9QCh. 7 - Prob. 10QCh. 7 - Prob. 11QCh. 7 - What are the fixed and variable cost tradeoffs...Ch. 7 - What is the difference between block diagramming...Ch. 7 - Prob. 14QCh. 7 - What are the objectives of line balancing?...Ch. 7 - How are manufacturing cells formed? How does the...Ch. 7 - Prob. 17QCh. 7 - Prob. 18QCh. 7 - Prob. 19QCh. 7 - Prob. 1PCh. 7 - Prob. 2PCh. 7 - Prob. 3PCh. 7 - Prob. 4PCh. 7 - Rent-With-Us Management Inc. has purchased a large...Ch. 7 - Prob. 6PCh. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Prob. 9PCh. 7 - Prob. 10PCh. 7 - Prob. 11PCh. 7 - Prob. 12PCh. 7 - Prob. 13PCh. 7 - Prob. 14PCh. 7 - Prob. 15PCh. 7 - Prob. 16PCh. 7 - The TLB Yogurt Company must be able to make 600...Ch. 7 - The Speedy Pizza Palace is revamping its...Ch. 7 - Professor Garcia has assigned 15 cases in his OM...Ch. 7 - McCauleys Heating and Air in Phoenix, Arizona,...Ch. 7 - The precedence diagram and task times (in minutes)...Ch. 7 - The Costplus Corporation has set a processing...Ch. 7 - Hanover Hospital beds can transform from a bed to...Ch. 7 - Fines Furniture is known for its fine cedar...Ch. 7 - Prob. 25PCh. 7 - The Wet Wellies Corporation produces waterproof...Ch. 7 - Prob. 27PCh. 7 - Jetaway, a small manufacturer of replacement parts...Ch. 7 - Workout Plus Workout Plus is a health club that...Ch. 7 - Photo Op-Please Line Up Tech is modernizing its...Ch. 7 - Photo Op-Please Line Up Tech is modernizing its...Ch. 7 - Photo Op-Please Line Up Tech is modernizing its...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- William Green, vice president of manufacturing for computer products (CPC), and his staff are studying three midwestern alternative locations for a new production facility for producing high-resolution scanners. His staff analysts predict that the scanners will be a growing market over the next ten years, and the analyst's group shares marketing's enthusiasm for planning facilities for producing this new product line. The analysts have developed these estimates for the three locations; In what range of production volume would each of the locations be preferred (at the minimum cost)? Variable cost locations Annual Fixed costs per scanner Cleveland, Ohio $390,000 $34 South Bend, Indiana $360,000 $37 Grand Rapids, Michigan $310,000 $40arrow_forwardA manufacturing company preparing to build a new plant is considering three potential locations for it. The fixed and variable costs for the three alternative locations are presented in the table below. Table 1 Costs A B C Fixed 500,000 600,000 800,000 Variable 40 30 20 Indicate over what range, each of the alternatives A, B, C is the low-cost choice.arrow_forwardHyundai Motors is considering three sites—A, B, and C—at which to locate a factory to build its new-model automobile, the Hyundai Sport C150. The goal is to locate at a minimum-cost site, where cost is measured by the annual fixed plus variable costs of production. Hyundai Motors has gathered the following data: Site Annualized Fixed Cost Variable Cost per Auto Produced A $10,000,000 $2,600 B $20,000,000 $1,900 C $30,000,000 $1,100 The firm knows it will produce between 0 and 60,000 Sport C150s at the new plant each year, but, thus far, that is the extent of its knowledge about production plans. a) The value of volume, V, of production above which site C is recommended = nothing Sport C150s (round your response up to the next whole number). b) The value of volume, V, of production below which site A is…arrow_forward
- The Dynaco Manufacturing Company is to build a new plant to make ring bearings (used in automobiles and trucks). The site selection team is evaluating three sites, and it has graded the important weighted criteria for each as follows: Develop a scoring model to determine which site the selection team should recommend.arrow_forwardDaniel Tracy, owner of Martin Manufacturing, must expand by building a new factory. The search for a location for this factory has been narrowed to four sites: A, B, C, or D. Thefollowing table shows the results thus far obtained by Tracy by using the factor-rating method to analyze the problem. The scale used for each factor scoring is I through 5. a) Which site should Tracy choose?b) If site D 's score for Energy costs increases from a 3 to a 5, do results change?c) If site A's Weather score is adj usted to a 4, what is the impact? What should Tracy do at this point?arrow_forwardDescribe the four main approaches used to solve the problem location?arrow_forward
- Balfour’s is considering building a plant in one of three possible locations. They have estimated the following parameters for each location: Location Fixed Cost Variable Cost Waco, Texas $300,000 $5.75 Tijuana, Mexico $800,000 $2.75 Fayetteville, Arkansas $100,000 $8.00 For what unit sales volume should they choose each location?arrow_forwardExotech Computers manufactures computer components such as chips, circuit boards, motherboards, keyboards, LCD panels, and the like, and sells them around the world. It wants to construct a new warehouse and distribution center in Asia to serve emerging markets there. It has identified sites in Shanghai, Hong Kong, and Singapore and has graded the important weighted decision criteria for each site as follows: Recommend a site based on these decision criteria and grades.arrow_forwardHyundai Motors is considering three sites-A, B, and C-at which to locate a factory to build its new-model automobile, the Hyundai Sport C150. The goal is to locate at a minimum-cost site, where cost is measured by the annual fixed plus variable costs of production. Hyundai Motors has gathered the following data: Site Annualized Fixed Cost Variable Cost per Auto Produced A $2,400 B $11,000,000 $20,000,000 $30,000,000 $2,100 C $1,000 The firm knows it will produce between 0 and 60,000 Sport C150s at the new plant each year, but, thus far, that is the extent of its knowledge about production plans.arrow_forward
- 1) Tabrane Pharmaceuticals is planning to open a new manufacturing facility as part of its expansion plans. The firm has narrowed down the search to locate its new manufacturing facility to five sites. The assessment of these sites is to be made on the basis of the five subjective location factors given below. The firm plans to use a five-point scale (excellent = 5, and poor = 1) to quantify and compare subjective opinions about the relative goodness of the sites. The weight reflects the importance of each factor in the decision. What is the weighted score for each site? Which site should the firm choose? Locations Factor Weight Moratuwa Jaffna Negombo Kalmunai Galle Labor Climate 0.20 5 3 3 4 4 Proximity to Markets 0.20 4 2 1 4 2 Quality of Life 0.15 4 4 4 1 3 Proximity to Suppliers 0.20 1 3 2 1 5 Taxes 0.25 2 5 3 4 3 2) Ceylon Steel produces steel alloy plates. The firm…arrow_forwardWhen an organization is determining a location choice, what sustainability issues should it consider? What ethical issues should be considered?arrow_forwardA dental care facility location analysis has been narrowed down to two locations in Alexandria; Stanley and Camp-Cesar. The main factors in the decision will be the supply of dental clinic raw materials, which has a weight of 0.50, transportation cost, which has a weight of 0.40, and labor cost, which has a weight of 0.10. The scores for raw materials, transportation, and labor are for Stanley 60, 80, and 70, respectively; for Camp-Cesar 70, 50, and 90, respectively. Given this information and a minimum acceptable composite score of 75, we can say that the facility OM should: A. be indifferent between these locationsB. choose StanleyC. choose Camp-CesarD. reject both locationsE. build a dental care facility in both districts.Why? – Comment to justify your (the OM) decision.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,