Question
Chapter 6, Problem 3P
(1)
Summary Introduction
Interpretation:The time taken by the production cycle to complete is to be determined.
Concept Introduction:The Company produces 3 components; grain combine (GC), large size tractor (LT), and small size tractor (SM).
(2)
Summary Introduction
Interpretation: Thetotal number of each type of machine that can be produced in each shift needs to be determined.
Concept Introduction:The Company produces 3 components; grain combine (GC), large size tractor (LT), and small size tractor (SM).
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Workers have an ability to pull the Andon cord during the production process to prevent overproduction in an unbalanced process.
True or False?
The Farm-4-Less tractor company produces a grain combine (GC) in addition to both a large (LT) and small size tractor (SM). Its production manager desires to produce to customer demand using a mixed-model production line. The current sequence of production, which is repeated 30 times during a shift, is SM-GC-SM-LT-SM-GC-LT-SM. A new machine isproduced every 2 minutes. The plant operates two 8-hour shifts. There is no downtime because the 4 hours between each shift are dedicated to maintenance and restocking raw material. Based on this information, answer the following questions.a. How long does it take the production cycle to be completed?b. How many of each type of machine does Farm-4-Less produce in a shift?
snip
Chapter 6 Solutions
Operations Management: Processes and Supply Chains (12th Edition) (What's New in Operations Management)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- north end coffee roasters roast 300bags of coffee per day in three shifts at an average rate of 63 bags/hour. during the first shift, 100bags of coffee are roasted at 63bags/hour and the next 100 bags are roasted at 72 bags/hour in the second shift. Q- after roasting each bag of coffee is sealed and labelled at the packaging stage at a rate of 90 bags/hour. what is the average rate of production for the entire process pf roasting and packaging coffee beans at north end?arrow_forwardThe Farm-4-Less tractor company produces a grain combine(GC) in addition to both a large (LT) and small size tractor(SM). Its production manager desires to produce to customerdemand using a mixed-model production line. The currentsequence of production, which is repeated 30 times duringa shift, is SM-GC-SM-LT-SM-GC-LT-SM. A new machine isproduced every 2 minutes. The plant operates two 8-hourshifts. There is no downtime because the 4 hours betweeneach shift are dedicated to maintenance and restocking rawmaterial. Based on this information, answer the followingquestions.a. How long does it take the production cycle to becompleted?b. How many of each type of machine does Farm-4-Lessproduce in a shift?arrow_forwardA U.S. Postal Service supervisor is looking for ways to reduce stress in the sorting department. With the existing arrangement, stamped letters are machine-canceled and loaded into tubs with 375 letters per tub. The tubs are then pushed to postal clerks, who read and key zip codes into an automated sorting machine at the rate of 1 tub per 375 seconds. To overcome the stress caused when the stamp canceling machine outpaces the sorting clerks, a pull system is proposed. When the clerks are ready to process another tub of mail, they will pull the tub from the canceling machine area. How many tubs should circulate between the sorting clerks and the canceling machine if 90,000 letters are to be sorted during an 8-hour shift, the safety stock policy variable, α, is 0.18, and the average waiting time plus materials handling time is 25 minutes per tub?arrow_forward
- Atlanta Manufacturing Company produces products W, X, Y, and Z through a joint process. The joint costs amount to $250,000. Product Units Produced Sales Value at Split-Off Additional Costs of Processing Sales Value After Processing W 750 $10,000 $2,500 $15,000 X 1,500 $30,000 $3,000 $35,000 Y 1,000 $20,000 $4,000 $25,000 Z 1,500 $40,000 $6,000 $45,000 If W is processed further, profits of W will: 1) Increase by $2,500 2) Increase by $12,500 3) Decrease by $23,000 4) Increase by $5,000arrow_forwardThe recipe for a fruit smoothie requires 2 cups of fruit per 6 cups of yogurt to maintain a 1/3 ratio. While making the fruit smoothie, Suzy accidentally puts 3 cups of fruit into the pitcher. How many cups of yogurt should be put out n the pitcher to maintain the ratio of 1/3?arrow_forwardA copy machine is available 24 hours a day. On a typical day, the machine produces 113 Jobs. Each Job takes about 4 minutes on the machine, 2 minutes of which is processing time and 2 minute is setup time (logging in, defining the job). About 16 Percent of the Jobs need to be reworked, in which case the setup time and the processing time have to be repeated. The remainder of the time, the equipment is idle. What is the OEE of the equipment? (Round your percentage answer to 1 decimal place.) What is the OEE of the equipment? 0.2 percentarrow_forward
- Link's Lumber creates pressure-treated utility poles from pine logs bought from several surrounding pine plantations. At the Link's Lumber operation, a batch of 100 pine logs yields 85 utility poles with 5 labor-hours required to process the entire batch. Link's Lumber is owned by Artemis Link, whose brother Devious Link is plan- ning to marry Betty Davis, owner of Northlands Pine Plantation. Artemis expects that his future sister-in-law will sell him pine logs for the same price he is paying to purchase them from other growers right now. The difference in Northlands Pine Plantation logs, however, is that they are considerably higher-quality wood than the logs he purchases from his current suppliers. If Betty agrees to sell him Northlands Pine Plantation pine logs, each batch of 100 logs can be expected to yield 100 util- ity poles, although it will take an additional 4 labor-hours per batch to process the higher-quality wood. a. What is the current labor productivity at Link's Lumber?…arrow_forwardJitsmart is a retailer of plastic action-figure toys. The action figures are purchased from Tacky Toys, Inc., and arrive in boxes of 20. Full boxes are stored on high shelves out of reach of customers. A small inventory is maintained on child-level shelves. Depletion of the lower-shelf inventory signals the need to take down a box of action figures to replenish the inventory. A reorder card is then removed from the box and sent to Tacky Toys to authorize replenishment of a container of action figures. The average demand rate for a popular action figure, Agent 99, is 18 units per day. The total lead time (waiting plus processing) is 2 days. Jitsmart's safety stocky policy variable, a, is 0.05. What is the authorized stock level for Jitsmart? units. (Enter your response rounded to the nearest whole number.)arrow_forward300ft^3/s of air at 50 F and 30% relative humidity is heated to 75 F dry bulb and 65 F wet bulb. What is the total heater requirement in Btu/hr, the change in moisture content during the process, and the amount of water added in the processarrow_forward
- Jitsmsmart is a retailer of plastic action-figure toys. The action figures are purchased from Tacky Toys, Inc. and arrive in boxes of 48. Full boxes are stored on high shelves out of reach of customers. A small inventory is maintained on child-levels shelves. Depletion of the lower-shelf inventory signals the need to take down a box of action figures to replenish the inventory. A reorder card is then removed from the box and sent to Tacky Toys to authorize the replenishment of a container of action figures. The average demand rate for popular action figure, Agent 99, is 36 units per day. The total lead time (waiting plus processing) is 11 days. Jitsmart's safety stocky policy variables 0.25. What is the authorized stock level for Jitsmart?arrow_forwardMarkland First National Bank of Rolla utilizes kanban techniques in its check processing facility. The following information is known about the process. Each kanban container can hold 50 checks and spends 24 minutes a day in processing and 2 hours a day in materials handling and waiting. Finally, the facility operates 24 hours per day and utilizes a policy variable for unforeseen contingencies of 0.25.a. If there are 20 kanban containers in use, what is the current daily demand of the check processing facility?b. If the muda or the waste in the system were eliminated completely, how many containers would then be needed?arrow_forwardEakins Enterprises makes model boats, and it is switching to a lean manufacturing process. At one assembly area, Eakins is using one part container that holds 240 parts, and it wants the output to be approximately 80 finished parts per hour; they also desire a 20 percent safety stock for this part. How fast will the container have to make it through the system to accomplish this? Do not round intermediate calculations. Round your answer to two decimal places.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.