PRINCIPLES OF HIGHWAY ENGINEERING+TRAFF
7th Edition
ISBN: 9781119688372
Author: Mannering
Publisher: WILEY
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 6, Problem 23P
To determine
The new level of service of highway segment.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A four-lane freeway with 12 ft lanes and 5 shoulders is on a 2% grade for the 1.25-mi analysis stretch. There are 2 ramps in this section. If the traffic mix is generally 6% heavy vehicles with a 70/30 SUT/TT split and a PHF of 0.8, how many vehicles can the freeway carry in the peak hour without dropping below Level of Surface (LOS) C?
A four-lane urban freeway segment has a peak demand volume of 3,500 vehicles per hour for the two eastbound lanes. The PHF is 0.95 and there are no trucks, buses or RVs because the freeway is classified as a parkway and such vehicles are prohibited. The segment has 12 ft lanes, no lateral obstructions, 3 ramps within the influence area, and meanders through some beautiful rolling terrain. Assuming the road will be used by commuters and those familiar with the road, what is the flow rate (pcphpl)? Provide your answer to the nearest integer.
Traffic engineering
Chapter 6 Solutions
PRINCIPLES OF HIGHWAY ENGINEERING+TRAFF
Ch. 6 - Prob. 1PCh. 6 - Prob. 2PCh. 6 - Prob. 3PCh. 6 - Prob. 4PCh. 6 - Prob. 5PCh. 6 - Prob. 6PCh. 6 - Prob. 7PCh. 6 - Prob. 8PCh. 6 - Prob. 9PCh. 6 - Prob. 10P
Ch. 6 - Prob. 11PCh. 6 - Prob. 12PCh. 6 - Prob. 13PCh. 6 - Prob. 14PCh. 6 - Prob. 15PCh. 6 - Prob. 16PCh. 6 - Prob. 17PCh. 6 - Prob. 18PCh. 6 - Prob. 19PCh. 6 - Prob. 20PCh. 6 - Prob. 21PCh. 6 - Prob. 22PCh. 6 - Prob. 23PCh. 6 - Prob. 24PCh. 6 - Prob. 25PCh. 6 - Prob. 26PCh. 6 - Prob. 27PCh. 6 - Prob. 28PCh. 6 - Prob. 29PCh. 6 - Prob. 30PCh. 6 - Prob. 31PCh. 6 - Prob. 32PCh. 6 - Prob. 33PCh. 6 - Prob. 34PCh. 6 - Prob. 35PCh. 6 - Prob. 36PCh. 6 - Prob. 37P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- QUESTION 1 A four-lane urban freeway segment has a peak demand volume of 3,500 vehicles per hour for the two eastbound lanes. The PHF is 0.95 and there are no trucks, buses or RVs because the freeway is classified as a parkway and such vehicles are prohibited. The segment has 12 ft lanes, no lateral obstructions, 3 ramps within the influence area, and meanders through some beautiful rolling terrain. Assuming the road will be used by commuters and those familiar with the road, what is the flow rate (pcphpl)? Provide your answer to the nearest integer.arrow_forwardA six-lane freeway (three lanes in each direction) has regular weekday users and currently operates at maximum LOS C conditions. The lanes are 11 ft wide, the right-side shoulder is 4 ft wide, and there are two ramps within three miles upstream of the segment midpoint and one ramp within three miles downstream of the segment midpoint. The highway is on rolling terrain with 10% large trucks and buses (no recreational vehicles), and the peak-hour factor is 0.90. b.) Determine the adjustment factor (f). (Express in three decimals)arrow_forwardA six-lane freeway (three lanes in each direction) has regular weekday users and currently operates at maximum LOS C conditions. The lanes are 11 ft wide, the right-side shoulder is 4 ft wide, and there are two ramps within three miles upstream of the segment midpoint and one ramp within three miles downstream of the segment midpoint. The highway is on rolling terrain with 10% large trucks and buses (no recreational vehicles), and the peak-hour factor is 0.90. a.) Determine the Free Flow Speedarrow_forward
- A six-lane freeway (three lanes in each direction) has regular weekday users and currently operates at maximum LOS C conditions. The lanes are 11 ft wide, the right-side shoulder is 4 ft wide, and there are two ramps within three miles upstream of the segment midpoint and one ramp within three miles downstream of the segment midpoint. The highway is on rolling terrain with 10% large trucks and buses (no recreational vehicles), and the peak-hour factor is 0.90. Determine the hourly volume for these conditions.arrow_forwardA four-lane freeway (2 lanes in each direction) has regular weekday users and currently operates at maximum LOS C conditions. The lanes are 12 ft wide, the right-side shoulder is 4 ft wide, and there are two ramps within three miles upstream of the segment midpoint and one ramp within three miles downstream of the segment midpoint. The highway is on rolling terrain with 10% large trucks and buses (no recreational vehicles), and the peak-hour factor is 0.90. Determine the D in pc/mi/h and vp in pc/hr/ln.arrow_forwardA rural collector highway is to be constructed in an area of rolling terrain where the ADT is 950 veh/day. For this situation, determine the following design values: a. Minimum design speed b. Desirable lane width and shoulder width c. Maximum desirable gradearrow_forward
- 6.9 An eight-lane freeway (four lanes in each direction) is on rolling terrain and has 11-ft lanes with a 4-ft right-side shoulder. The total ramp density is 1.5 ramps per mile. The directional peak- hour traffic volume is 5400 vehicles with 11% heavy vehicles. The peak-hour factor is 0.95. It has been decided that heavy vehicles will be banned from the freeway during the peak hour. What will the freeway's density and LOS be before and after the ban? (Assume that the heavy vehicles are removed and all other traffic attributes are unchanged.)arrow_forwardASAP PLSarrow_forwardA six-lane freeway (three lanes in each direction) in rolling terrain has 10-ft lanes and obstructions (fLw = 6.0 mph) 4 ft from the right edge of the traveled pavement (fic = 0.8 mph). There are five ramps within three miles upstream of the segment midpoint and four ramps within three miles downstream of the segment midpoint. A directional peak-hour volume of 2000 vehicles (primarily commuters) is observed, with 600 vehicles arriving in the highest 15-min flow rate period. The traffic stream contains 12% large trucks (ET = 2.5) and buses and 6% recreational vehicles (ER = 2.0). 1.) What is the estimated free-flow speed of the traffic stream in mph (whole number, nearest 5)? 2.) What is the peak-hour factor 3.) What is the heavy-vehicle adjustment factor? 4.) What is the service flow rate? 5.) What is the service measure value if the average speed of the traffic stream is 65 mpharrow_forward
- A four-lane freeway (two lanes on each direction) is located on mountainous terrain with 11-ft lanes, a 5-ft right-side shoulder, and a 3-ft left-side shoulder, and a 60- mph design speed. The freeway currently operates at capacity during the peak hour. If an additional 11-ft lane is added, and all other factors stay the same, what will the new level of service be?arrow_forwardA 5% upgrade on a six-lane freeway (three lanes in each direction) is 1.25 mi long. On this segment of freeway, the directional peak-hour volume is 3800 vehicles with 2% large trucks and 4% buses (no recreational vehicles), the peak- hour factor is 0.90, and all drivers are regular users. The lanes are 12 ft wide, there are no lateral obstructions within 10 ft of the roadway, and the total ramp density is 1.0 ramps per mile. A bus strike will eliminate all bus traffic, but it is estimated that for each bus removed from the roadway, seven additional passenger cars will be added as travelers seek other means of travel. a.) What is density, before the bus strike? b.) What is the volume-to-capacity ratio, before the bus strike? c.) What is the level of service of the upgrade segment before the bus strike? d.) What is density, after the bus strike? e.) What is the volume-to-capacity ratio, after the bus strike? f.) What is the level of service of the upgrade segment after the bus strike?arrow_forwardA long segment of suburban freeway is to be designed on level terrain. The level segment, however, is followed by a 4.5% grade, 2.0 miles in length. If the DDHV is 2,500 vehicles per hour with 15% trucks (standard mix), how many lanes will be needed on the (A.) Upgrade, (B.) Downgrade, (C.) Level terrain segment to provide for level of service C? Lane widths and lateral clearances may be assumed to be 12 feet and 6 feet, respectively. Ramp density is expected to be 1.0 ramps per mile. The PHF is 0.92. Good weather, no incidents, no work zones, and regular users of the facility may be assumed.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning