To compare: Theequipment management strategies for product and process layouts.
Introduction:
Product layouts:
Product layout is a production system where the equipment and workstations are placed along the production and assembly lines. A conveyor is used to move the production units along the line. Product layouts have specialized labor to perform specific functions with the help of equipments (programmed to do a specific tasks in a repetitive manner). The layout is mostly based on the processing sequence.
Process layouts:
Process layout is a production system where the equipment is placed in a system based on their functions. The production line is planned to eliminate wastes. In certain process layouts, the machineries and work settings are not arranged as per the standardized production sequence. However, there would be an assembly having similar machineries and operational activities depending on the requirement. For example, paint department.
Want to see the full answer?
Check out a sample textbook solutionChapter 6 Solutions
Loose-leaf for Operations Management (The Mcgraw-hill Series in Operations and Decision Sciences)
- Explain how the layout and organization of flow diagrams differs from that of system flowcharts.arrow_forwardResearch and write a short paper illustrating how an organization uses the following type of facility layout: Product layoutarrow_forwardGiven in the following table are the tasks necessary for final assembly of a hospital bed, the length of time needed to perform each task, and the operations that must be completed prior to subsequent operations. Construct a precedence diagram and balance the assembly line for a desired cycle time of 14 minutes. Draw a schematic diagram of the balanced line. How many beds can actually be assembled in an eight-hour period? Element Precedence Time (min) A None 4 B None 5 C None 8 D A 4 E A, B 3 F B 3 G D, E 5 H F 7 I G, H 1 J I 7 K C, J 4arrow_forward
- Construct a Fishbone Diagram PROBLEM: Unable to meet the production quota resulting to opportunity loss CAUSES: High Rate of absenteeism (Laziness of workers) Idle Time of Workers (Laziness) Shortage of Materials Due to under-stock (supplier’s problem) Insufficient Number of Trucks (supplier’s problem) Longer Machine Downtime Lack of Technician (Machine cause) Bottleneck Poor Layout DATA: The company operates 9 hours a day with one hour organized lunch break Total working days per month is 20 days Production Quota is 40,000 units per day Actual Output is 16,000 units per day Rate of absenteeism is 8 workers per day Machine Capacity is 4000 units per…arrow_forwardHow do mixed-model assembly lines differ from traditional assembly lines? What additional decisions arerequired?arrow_forwardWarehouse layout has the following objective. Balance low-cost storage with low-cost material handling Move material to the limited storage areas around the site Manage varied material flow for each product "Identify a product family, build teams, cross train team members" Equalize the task time at each workstation Which of the following does not belongs to the intended to reduce boredom associated with labor specialization? Development of dexterity Job enlargement Job rotation Job enrichment Employee empowerment Retail layout has the following objective. Expose customer to high-margin items Balance low-cost storage with low-cost material handling Move material to the limited storage areas around the site Manage varied material flow for each product "Identify a product family, build teams, cross train team members" Automated storage and retrieval…arrow_forward
- 4- Identify the store layout retail business. Do you think the store layout helps the business to achieve its retail objectives? Explain and justify your answerarrow_forward10. This layout groups dissimilar machines to work on products that have similar shapes and processing requirements. Multiple Choice Workcenter Job shops Servicescape Flow-shop layout Manufacturing cellarrow_forwardIn a product-oriented layout, what is the process of deciding how to assign tasks to workstations? O work allocation O process balancing Otask allocation O station balancing O assembly-line balancingarrow_forward
- 24- Which of the following store layouts helps retailers in enhancing the productivity of their retail shop? a. Grid layout b. Spine layout c. Free-flow layout d. Loop layoutarrow_forwardIs it tough to make the most of the auto layout system's features?arrow_forwardGive anExample of an order processed in a traditional process layout?arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.