Loose-leaf for Operations Management (The Mcgraw-hill Series in Operations and Decision Sciences)
12th Edition
ISBN: 9781259580093
Author: William J Stevenson
Publisher: McGraw-Hill Education
expand_more
expand_more
format_list_bulleted
Textbook Question
Chapter 4.S, Problem 1P
Consider the following system:
Determine the probability that the system will operate under each of these conditions:
a. The system as shown.
b. Each system component has a backup with a probability of .90 and a switch that is 100 percent reliable.
c. Backup with .90 probability and a switch that is 99 percent reliable.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A product engineer has developed the following equation for the cost of a system component: C = (10P) 2, where C is the cost in dollars and P is the probability that the component will operate as expected. The system is composed of two identical components, both of which must operate forthe system to operate. The engineer can spend $173 for the two components. To the nearest two decimal places, what is the largest component probability that can be achieved?
A product engineer has developed the following equation for the cost of a system component: C = (10P)2, where is the cost in dollars and Pis the probability that the component will operate as expected. The system is composed of two identical components, both of which must operate for the system to operate. The engineer can spend $173 for the two components. To the nearest two decimal places, what is the largest component probability that can be achieved?
A hospital has three independent fire alarm systems, with reliabilities of .95, .97, and .99. In the event of a fire, what is the probability that a warning would be given?
Chapter 4 Solutions
Loose-leaf for Operations Management (The Mcgraw-hill Series in Operations and Decision Sciences)
Ch. 4.5 - Prob. 1.1RQCh. 4.5 - Prob. 1.2RQCh. 4.8 - LEGO A/S IN THE PINK Lego A/S overcame the recent...Ch. 4.11 - THE CHALLENGES OF MANAGING SERVICES Services can...Ch. 4.11 - THE CHALLENGES OF MANAGING SERVICES Services can...Ch. 4.S - Prob. 1DRQCh. 4.S - Prob. 2DRQCh. 4.S - Prob. 3DRQCh. 4.S - Consider the following system: Determine the...Ch. 4.S - A product is composed of four parts. In order for...
Ch. 4.S - A system consists of three identical components....Ch. 4.S - A product engineer has developed the following...Ch. 4.S - The guidance system of a ship is controlled by a...Ch. 4.S - One of the industrial robots designed by a leading...Ch. 4.S - A production line has three machines A, B, and C,...Ch. 4.S - Prob. 8PCh. 4.S - A Web server has five major components that must...Ch. 4.S - Repeat Problem 9 under the condition that one of...Ch. 4.S - Hoping to increase the chances of reaching a...Ch. 4.S - An electronic chess game has a useful life that is...Ch. 4.S - A manufacturer of programmable calculators is...Ch. 4.S - Lucky Lumen light bulbs have an expected life that...Ch. 4.S - Prob. 15PCh. 4.S - Prob. 16PCh. 4.S - A major television manufacturer has determined...Ch. 4.S - Prob. 18PCh. 4.S - Determine the availability for each of these...Ch. 4.S - Prob. 20PCh. 4.S - A manager must decide between two machines. The...Ch. 4.S - Prob. 22PCh. 4.S - Auto batteries have an average life of 2.7 years....Ch. 4 - Prob. 1DRQCh. 4 - Prob. 2DRQCh. 4 - Prob. 3DRQCh. 4 - Prob. 4DRQCh. 4 - Prob. 5DRQCh. 4 - Prob. 6DRQCh. 4 - Prob. 7DRQCh. 4 - Prob. 8DRQCh. 4 - a. What is meant by the term life cycle? b. Why...Ch. 4 - Prob. 10DRQCh. 4 - Prob. 11DRQCh. 4 - Prob. 12DRQCh. 4 - Prob. 13DRQCh. 4 - Explain what quality function development is and...Ch. 4 - Prob. 15DRQCh. 4 - Prob. 16DRQCh. 4 - Prob. 17DRQCh. 4 - Prob. 18DRQCh. 4 - Prob. 19DRQCh. 4 - Describe some of the trade-off that are...Ch. 4 - Prob. 2TSCh. 4 - Prob. 3TSCh. 4 - Prob. 1CTECh. 4 - Prob. 2CTECh. 4 - Prob. 3CTECh. 4 - Prob. 4CTECh. 4 - Prob. 5CTECh. 4 - Give two examples of unethical conduct involving...Ch. 4 - Prob. 1PCh. 4 - Prob. 2PCh. 4 - Prepare a service blueprint for each of these...Ch. 4 - Prepare a service blueprint for each of these post...Ch. 4 - Prob. 5PCh. 4 - Prob. 6PCh. 4 - Prob. 7PCh. 4 - Prepare a table similar to that shown in Problem...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- A product engineer has developed the following equation for the cost of a system component: C = (10P)2, where C is the cost in dollars and P is the probability that the component will operate as expected. The system is composed of 3 identical components, all of which must operate for the system to operate. The engineer can spend $254 for the 3 components. What is the largest component probability that can be achieved? (Do not round your intermediate calculations. Round your final answer to 4 decimal places.) Probability 0.8466arrow_forward1. Three hundred identical cathode ray tubes (CRTS) placed into service simultaneously on January 1, 1976, experienced the following numbers of failures through December 31, 1988: 1983 Year Number of failures 1984 1985 1986 1987 1988 13 19 16 34 21 38 Assume that there were no failures before 1983. a. Based on these data, estimate the cumulative distribution function (CDF) of a CRT chosen at random. Using the results of part (a), estimate the probability that a CRT chosen at random 13.1 Reliability of a Single Component 753 b. Lasts more than 5 years. c. Lasts more than 10 years. d. Lasts more than 12 years. e. That has survived for 10 years fails in the 11th year of operation.arrow_forwardA Florida lottery machine and printer at Store #8302 operates 360 days a year. If the machine does not work and breaks down, it costs the Florida Lottery Commission $2,160 per day. If store employees are trained to perform local tests on the machine each day plus the costs of machine repairpersons, these preventive maintenance costs average $850 per day. If preventive maintenance is performed daily, the probability the equipment fails is zero. The probability of store lottery machine breakdown is as follows. Number of Lottery Machine Breakdowns per Day 0 1 1/3 Probability of a breakdown What are the economics of the situation? Do not round intermediate calculations. Round your answers to the nearest dollar. The expected cost of a breakdown per day is $ The Florida Lottery Commission saves $ by performing preventive maintenance daily. 2 1/3 1/3 per yeararrow_forward
- A weather satellite has an expected life of 10 years from the time it is placed into earth orbit. Determine its probability of no wear-out before each of the following lengths of service. Assume theexponential distribution is appropriate.a. 5 years b. 12 years c. 20 years d. 30 yearsarrow_forwardMonte-Carlo Simulation: Run an MC by simulating 1000 versions of the GBM with the following parameters; Start Value=100 Expected change in each time step (drift): 0% (μ) Volatility (st-dev of random noise): 2% (sigma) Number of Time Steps: 500 According to the simulated 1000 scenarios, what is the probability of reaching a value below 100 (i.e. the starting value) after 500 steps? According to the simulated 1000 scenarios, what is the probability of reaching a value below 75 (i.e. the starting value) after 500 steps? Show with a Python code and the simulation output as a Histogram of values reached at the 500th step. (i.e. Histogram of 1000 final values observed in each of the simulated path)arrow_forwardA major television manufacturer has determined that its 40-inch LED televisions have a meanservice life that can be modeled by a normal distribution with a mean of six years and a standarddeviation of one-half year.a. What probability can you assign to service lives of at least (1) five years? (2) six years? (3)seven and one-half years?arrow_forward
- At DataTech Solutions, the reliability of their server systems is a critical factor in maintaining smooth operations. The company knows that the probability of a server experiencing no downtime due to technical issues is 0.95. When a server is functioning smoothly, there is a 0.9 probability that the network performance is also optimal. However, if a server encounters technical problems, the probability of having optimal network performance drops to 0.3. A server is chosen at random for assessment, and its network performance is found to be optimal. What is the updated probability that the server is running without any technical issues?arrow_forwardOperational risk is an event risk where there is a wide range of events that can trigger losses. It can take place at which of the following levels noted in the examples below: a.Human error. b.All of the above. c.Outdated policy or procedures. d.Malfunction of a back-up system.arrow_forwardThe International Organization for Standardization is the first globally recognized standard related to risk management: a) True b) Falsearrow_forward
- A manufacturer of programmable calculators is attempting to determine a reasonable free-serviceperiod for a model it will introduce shortly. The manager of product testing has indicated that thecalculators have an expected life of 30 months. Assume product life can be described by an exponential distribution.a. If service contracts are offered for the expected life of the calculator, what percentage of thosesold would be expected to fail during the service period?arrow_forward2. A product design engineer must decide if a redundant component is cost-justified in a certain system. The system in question has a critical component with a probability of 0.98 of operating. System failure would involve a cost of $20000. For a cost of $100 a switch could be added that would automatically transfer the system to the backup in the event of failure. Should the backup be added if the backup probability is also 0.98?arrow_forwardAn online news platform is hosting sports news on a local webserver. Assuming the webserver is valued at $10,000. This webserver crashed 7 times in one year and in every crash, it resulted in a 3% loss. Calculate the expected losses using single loss expectancy (SLE) and annualize Loss expectancy (ALE)arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Process selection and facility layout; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=wjxS79880MM;License: Standard YouTube License, CC-BY