Acme Steel Fabricators experienced booming business for the past 5 years. The company fabricates a wide range of steel products, such as railings, ladders, and light structural steel framing. The current manual method of materials handling is causing excessive inventories and congestion. Acme is considering the purchase of an overhead rail-mounted hoist system or a forklift truck to increase capacity and improve manufacturing efficiency.
The annual pretax payoff from the system depends on future demand. If demand stays at the current level, the probability of which is 0.50, annual savings from the overhead hoist will be $10,000. If demand rises, the hoist will save $25,000 annually because of operating efficiencies in addition to new sales. Finally, if demand falls, the hoist will result in an estimated annual loss of $65,000. The probability is estimated to be 0.30 for higher demand and 0.20 for lower demand.
If the forklift is purchased, annual payoffs will be $5,000 if demand is unchanged, $10,000 if demand rises, and
- Draw a decision tree for this problem and compute the expected value of the payoff for each alternative.
- Which is the best alternative, based on the expected values?
Trending nowThis is a popular solution!
Chapter 4 Solutions
MyLab Operations Management with Pearson eText -- Access Card -- for Operations Management: Processes and Supply Chains
Additional Business Textbook Solutions
Operations Management
Principles of Operations Management: Sustainability and Supply Chain Management (10th Edition)
Operations Management: Sustainability and Supply Chain Management (12th Edition)
Principles Of Operations Management
Operations and Supply Chain Management 9th edition
OPERATIONS MANAGEMENT IN THE SUPPLY CHAIN: DECISIONS & CASES (Mcgraw-hill Series Operations and Decision Sciences)
- Acme Steel Fabricators experienced booming business for the past five years. The company fabricates a wide range of steel products, such as railings, ladders, and light structural steel framing. The current manual method of materials handling is causing excessive inventories and congestion. Acme is considering the purchase of an overhead rail-mounted hoist system or a forklift truck to increase capacity and improve manufacturing efficiency. The annual pretax payoff from the system depends on future demand. If demand stays at the current level, the probability of which is 0.60, annual savings from the overhead hoist will be $10,000. If demand rises, the hoist will save $22,000 annually because of operating efficiencies in addition to new sales. Finally, if demand falls, the hoist will result in an estimated annual loss of $50,000. The probability is estimated to be 0.30 for higher demand and 0.10 for lower demand. If the forklift is purchased, annual payoffs will be $5,000 if…arrow_forwardBorges Machine Shop, Inc., has a 1-year contract for the production of 250,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow General-Purpose Equipment (GPE) 250,000 Annual contracted units Annual fixed cost $125,000 Per unit variable cost $18.00 The option GPE is best when the contracted volume is below Flexible Manufacturing System (FMS) 250,000 $250,000 $14.00 D Dedicated Machine (DM) 250,000 $480,000 $13.00 units (enter your response as a whole number)arrow_forwardBorges Machine Shop, Inc., has a 1-year contract for the production of 75,000 gear housings for a new off-road vehicle, Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow Annual contracted units Annual fixed cost Per unit variable cost General-Purpose Equipment (GPE) 75,000 $100,000 $16.00 Flexible Manufacturing System (FMS) 75,000 $225,000 $14.00 Dedicated Machine (DM) 75,000 $450,000 $13.75 Based on the total cost, the process that is best suited for the current contracted volume is Suppose the contracted volume changes to 275,000 gear housings. Based on the total cost, the process that is best suited for the new volume is Suppose the contracted volume changes to 375,000 gear housings. Based on the total cost, the process that is best suited…arrow_forward
- Prevar Corporation currently purchases components from one of its suppliers. The current purchase price is $1500 per component, with annual purchase volume of 750 units. The ops manager believes that this component could be made inhouse with some minor modifications to the current factory set up. Fixed cost for dedicating a line for this component is estimated at $50,000. Raw materials for the component is estimated at $900, overhead at $200 and it would take 10 hours of labor (at $20 per hour) to produce each component.arrow_forwardSoutheastern Airlines's daily flight from Atlanta to Charlotte uses a Boeing 737, with all-coach seating for 120 people. In the past, the airline has priced every seat at $136 for the one-way flight. An average of 81 passengers are on each flight. The variable cost of a filled seat is $23. Aysajan Eziz, the new operations manager, has decided to try a yield revenue approach, with seats priced at $82 for early bookings and at $195 or bookings within 1 week of the flight. He estimates that the airline will sell 66 seats at the lower price and 33 at the higher price. Variable cost will not change. 1. Total $ contribution in the single price approach is ? (enter your response as a whole number). 2. Total $ contribution in the two price points approach is ? (enter your response as a whole number). 3.Which approach is preferable to Mr. Eziz? A.Proposed model−two price points OR B. Current Model - Single pricearrow_forwardSoutheastern Airlines's daily flight from Atlanta to Charlotte uses a Boeing 737, with all-coach seating for 120 people. In the past, the airline has priced every seat at $142 for the one-way flight. An average of 79 passengers are on each flight. The variable cost of a filled seat is $26. Aysajan Eziz, the new operations manager, has decided to try a yield revenue approach, with seats priced at $82 for early bookings and at $187 for bookings within 1 week of the flight. He estimates that the airline will sell 67 seats at the lower price and 34 at the higher price. Variable cost will not change. Total S contribution in the single price approach is $ (enter your response as a whole number). Total S contribution in the two price points approach is $ (enter your response as a whole number). Which approach is preferable to Mr. Eziz? O A. Proposed model - two price points O B. Current model - single pricearrow_forward
- Borges Machine Shop, Inc., has a 1-year contract for the production of 250,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General Purpose Equipment (GPE) Flexible Manufacturing System (FMS) 250,000 $125,000 $15.00 Annual contracted units Annual fixed cost Per unit variable cost The option GPE is best when the contracted volume is below units (enter your response as a whole number). Dedicated Machine (DM) 250,000 $225,000 $14.00 250,000 $525,000 $13.00arrow_forwardBorges Machine Shop, Inc., has a 1-year contract for the production of 250,000gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM) Annual contracted units 250,000 250,000 250,000 Annual fixed cost $125,000 $200,000 $525,000 Per unit variable cost $16.00 $14.00 $13.00 The option GPE is best when the contracted volume is below…arrow_forwardThe owner of Old-Fashioned Berry Pies, S. Simon, is contemplating adding a new line of pies, which will require leasing new equipment for a monthly payment of $6,000. Variable costs would be $2 per pie, and pies would retail for $7 each. a. How many pies must be sold in order to break even? b. What would the profit (loss) be if 1,000 pies are made and sold in a month? How many pies must be sold to realize a profit of $4,000? С. d. If 2,000 can be sold, and a profit target is $5,000, what price should be charged per pie? 5-30arrow_forward
- In the context of system management, explain the concept of "capacity planning." How does effective capacity planning contribute to system reliability and performance optimization?arrow_forwardI need help with this cost accounting problem.arrow_forwardPROBLEM STATEMENT Based on studies that have been conducted, entry bookings for flight tickets sometimes deviate from what is booked by customers who want to board the plane to their desired destination. the existing system is not able to identify bookings made by customers properly. therefore, the existing system needs to be upgraded. Using a new flight ticket management system will be able to solve the problem. Secondly, the charge calculations performed still use the old method of calculation and take time to complete one calculation after another. With the new management system, the calculation and displayed total charges can be done automatically. Sometimes it is quite difficult for us to calculate the discounts given to customers who book flight tickets with large bookings. this will result in incorrectly giving the actual price to the customer and may result in losses. Moreover, with the new system, the amount of profit earned can be easily calculated. Lastly, daily…arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.