Concept explainers
What are the three common approaches for assigning
Concept Introduction:
Predetermined overhead allocation:
Manufacturing overhead cost is the pool of all indirect costs incurred for the production. These are the costs which are not directly traceable to the product. Manufacturing costs include indirect material, indirect labor and overheads. These costs are allocated to the products using the predetermined overhead allocation rate.
Activity Based Costing (ABC):
ABC costing method is generally used to allocate the overhead costs to the product using activity rates differently for each activity. Unlike traditional method, the ABC costing method does not use the plant wide overhead rate, rather it used different allocation rate for different production activity.
To Indicate:The three common approaches to assign the overhead costs
Answer to Problem 1Q
The three common approaches to assign the overhead costs are as follows:
1. Predetermined overhead allocation
2. Volume based allocation
3. Activity based costing
Explanation of Solution
The three common approaches to assign the overhead costs are as follows:
1. Predetermined overhead allocation: Under this approach the entire manufacturing overhead is allocated to the production using a single overhead rate.
2. Volume based allocation: Under this approach the entire manufacturing overhead is allocated to the production using the number of units as base.
3. Activity Based Costing: Under this approach the entire manufacturing overhead is first dividend into the different production activities and then each activity cost is allocated to the production using the appropriate allocation for that activity.
Want to see more full solutions like this?
Chapter 4 Solutions
Introduction To Managerial Accounting
Additional Business Textbook Solutions
Intermediate Accounting (2nd Edition)
Horngren's Accounting (12th Edition)
Essentials of MIS (13th Edition)
Horngren's Cost Accounting: A Managerial Emphasis (16th Edition)
Operations Management: Processes and Supply Chains (12th Edition) (What's New in Operations Management)
Engineering Economy (17th Edition)
- At the beginning of the year, Quantum Industries had liabilities of $85,000. During the year, assets increased by $75,000, and at year-end, assets totaled $210,000. Liabilities decreased by $14,000 during the year. What are the beginning and ending amounts of equity for Quantum Industries?arrow_forwardSolve the problemarrow_forwardWant answerarrow_forward
- The monthly cost (in dollars) of a data plan for Mercury Communications is a linear function of the total data usage (in gigabytes). The monthly cost for 25 gigabytes of data is $45.50 and the monthly cost for 40 gigabytes is $58.00. What is the monthly cost for 28 gigabytes of data?arrow_forwardRefer to the information given below: a. The June 30 cash balance in the general ledger is $1,940. b. The June 30 balance shown on the bank statement is $1,168. c. Checks issued but not returned with the bank statement were Number 712 for $33 and Number 723 for $160. d. A deposit made late on June 30 for $800 is included in the general ledger balance but not in the bank statement balance. e. Returned with the bank statement was a notice that a customer's check for $120 that was deposited on June 24 had been returned because the customer's account was overdrawn. f. During a review of the checks that were returned with the bank statement, it was noted that the amount of Check Number 728 was $72 but that in the company's records supporting the general ledger balance, the check had been erroneously recorded as a payment of an account payable in the amount of $27. Required: Prepare a bank reconciliation as of June 30 from the above information. Note: Total the entries of the same account…arrow_forwardWhat Is the equity at the end of the year?arrow_forward
- Principles of Accounting Volume 2AccountingISBN:9781947172609Author:OpenStaxPublisher:OpenStax CollegePrinciples of Cost AccountingAccountingISBN:9781305087408Author:Edward J. Vanderbeck, Maria R. MitchellPublisher:Cengage LearningManagerial AccountingAccountingISBN:9781337912020Author:Carl Warren, Ph.d. Cma William B. TaylerPublisher:South-Western College Pub
- Cornerstones of Cost Management (Cornerstones Ser...AccountingISBN:9781305970663Author:Don R. Hansen, Maryanne M. MowenPublisher:Cengage Learning