EBK PRACTICAL MANAGEMENT SCIENCE
5th Edition
ISBN: 9780100655065
Author: ALBRIGHT
Publisher: YUZU
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 4, Problem 119P
Summary Introduction
To determine: The way Company C can maximize the weekly profit.
Linear programming:
It is a mathematical modeling procedure were a linear function is maximized or minimized subject to certain constraints. This method is widely useful in making a quantitative analysis which is essential for making important business decisions.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
There is an upstream Picking department that feeds two downstream
Packing departments: Pack Singles and Pack Multis. Those Packing departments feed to a Shipping department that loads the outgoing trucks. 40% of your Pick volume goes to Pack Singles and has a packing rate of 104 units per labor hour (uph). 60% of the Pick volume goes to Pack Multis and has a pack rate of 215 units per labor hour. Your pickers pick both Single and Multi items throughout the day at an overall average rate of 114 units per labor hour. All units that are packed in both processes go through the Ship process at a rate of 570 units per hour. You have 102 people today for all 4 departments and you absolutely must pack 47,880 units in Pack Multis Items to meet a customer promise metric. How do you allocate labor to balance the flow in your department if you work a 10 hour shift? Do not assume breaks or lunches in your answer. Redirect 1: You now need to process all of the Pack Singles Volume in the first 5…
The Decision Sciences Department is trying todetermine whether to rent a slow or a fast copier. Thedepartment believes that an employee’s time is worth$15 per hour. The slow copier rents for $4 per hour,and it takes an employee an average of 10 minutes tocomplete copying. The fast copier rents for $15 per hour,and it takes an employee an average of six minutes tocomplete copying. On average, four employees per hourneed to use the copying machine. (Assume the copyingtimes and interarrival times to the copying machineare exponentially distributed.) Which machine shouldthe department rent to minimize expected total cost perhour?
During an eight-hour shift, 750 non-defective parts are desired as a result of a manufacturing operation. The default operation time is 15 minutes. As the operators of machine are inexperienced, the actual time they take to perform the operation is 20 minutes, and, on average, a fifth of the parts that start to be manufactured are lost. Assuming that each one of the machines used in this operation will not be available for one hour in each shift, determine the number of machines needed.
Chapter 4 Solutions
EBK PRACTICAL MANAGEMENT SCIENCE
Ch. 4.2 - Prob. 1PCh. 4.2 - Prob. 2PCh. 4.2 - Prob. 3PCh. 4.2 - Prob. 4PCh. 4.2 - Prob. 5PCh. 4.2 - Prob. 6PCh. 4.3 - Prob. 7PCh. 4.3 - Prob. 8PCh. 4.3 - Prob. 9PCh. 4.3 - Prob. 10P
Ch. 4.3 - Prob. 11PCh. 4.3 - Prob. 12PCh. 4.4 - Prob. 13PCh. 4.4 - Prob. 14PCh. 4.4 - Prob. 15PCh. 4.4 - Prob. 16PCh. 4.4 - Prob. 17PCh. 4.4 - Prob. 18PCh. 4.4 - Prob. 19PCh. 4.5 - Prob. 20PCh. 4.5 - Prob. 21PCh. 4.5 - Prob. 22PCh. 4.5 - Prob. 23PCh. 4.5 - Prob. 24PCh. 4.5 - Prob. 25PCh. 4.6 - Prob. 26PCh. 4.6 - Prob. 27PCh. 4.6 - Prob. 28PCh. 4.6 - Prob. 29PCh. 4.7 - Prob. 30PCh. 4.7 - Prob. 31PCh. 4.7 - Prob. 32PCh. 4.7 - Prob. 33PCh. 4.7 - Prob. 34PCh. 4.7 - Prob. 35PCh. 4.7 - Prob. 36PCh. 4.7 - Prob. 37PCh. 4.7 - Prob. 38PCh. 4.7 - Prob. 39PCh. 4.7 - Prob. 40PCh. 4.8 - Prob. 41PCh. 4.8 - Prob. 42PCh. 4.8 - Prob. 43PCh. 4.8 - Prob. 44PCh. 4 - Prob. 45PCh. 4 - Prob. 46PCh. 4 - Prob. 47PCh. 4 - Prob. 48PCh. 4 - Prob. 49PCh. 4 - Prob. 50PCh. 4 - Prob. 51PCh. 4 - Prob. 52PCh. 4 - Prob. 53PCh. 4 - Prob. 54PCh. 4 - Prob. 55PCh. 4 - Prob. 56PCh. 4 - Prob. 57PCh. 4 - Prob. 58PCh. 4 - Prob. 59PCh. 4 - Prob. 60PCh. 4 - Prob. 61PCh. 4 - Prob. 62PCh. 4 - Prob. 63PCh. 4 - Prob. 64PCh. 4 - Prob. 65PCh. 4 - Prob. 66PCh. 4 - Prob. 67PCh. 4 - Prob. 68PCh. 4 - Prob. 69PCh. 4 - Prob. 70PCh. 4 - Prob. 71PCh. 4 - Prob. 72PCh. 4 - Prob. 73PCh. 4 - Prob. 74PCh. 4 - Prob. 75PCh. 4 - Prob. 76PCh. 4 - Prob. 77PCh. 4 - Prob. 78PCh. 4 - Prob. 79PCh. 4 - Prob. 80PCh. 4 - Prob. 81PCh. 4 - Prob. 82PCh. 4 - Prob. 83PCh. 4 - Prob. 84PCh. 4 - Prob. 85PCh. 4 - Prob. 86PCh. 4 - Prob. 87PCh. 4 - Prob. 88PCh. 4 - Prob. 89PCh. 4 - Prob. 90PCh. 4 - Prob. 91PCh. 4 - Prob. 92PCh. 4 - Prob. 93PCh. 4 - Prob. 94PCh. 4 - Prob. 95PCh. 4 - Prob. 96PCh. 4 - Prob. 97PCh. 4 - Prob. 98PCh. 4 - Prob. 99PCh. 4 - Prob. 100PCh. 4 - Prob. 101PCh. 4 - Prob. 102PCh. 4 - Prob. 103PCh. 4 - Prob. 104PCh. 4 - Prob. 105PCh. 4 - Prob. 106PCh. 4 - Prob. 107PCh. 4 - Prob. 108PCh. 4 - Prob. 109PCh. 4 - Prob. 110PCh. 4 - Prob. 111PCh. 4 - Prob. 112PCh. 4 - Prob. 113PCh. 4 - Prob. 114PCh. 4 - Prob. 115PCh. 4 - Prob. 116PCh. 4 - Prob. 117PCh. 4 - Prob. 118PCh. 4 - Prob. 119PCh. 4 - Prob. 120PCh. 4 - Prob. 121PCh. 4 - Prob. 122PCh. 4 - Prob. 123PCh. 4 - Prob. 124PCh. 4 - Prob. 125PCh. 4 - Prob. 126PCh. 4 - Prob. 127PCh. 4 - Prob. 128PCh. 4 - Prob. 129PCh. 4 - Prob. 130PCh. 4 - Prob. 131PCh. 4 - Prob. 132PCh. 4 - Prob. 133PCh. 4 - Prob. 134PCh. 4 - Prob. 135P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Assume the demand for a companys drug Wozac during the current year is 50,000, and assume demand will grow at 5% a year. If the company builds a plant that can produce x units of Wozac per year, it will cost 16x. Each unit of Wozac is sold for 3. Each unit of Wozac produced incurs a variable production cost of 0.20. It costs 0.40 per year to operate a unit of capacity. Determine how large a Wozac plant the company should build to maximize its expected profit over the next 10 years.arrow_forwardA machine part to be fabricated may be made from alloy of either of two metals. There is an order for 10,000 units. Metal A costs 3 pesos per kg, while Metal B costs 9 pesos per kg. If Metal A is used, the material per unit weighs 110 grams; for metal B, 30 grams. When metal A is used, 50 units can be produced per hour; for metal B, 80 units per hour. Metal B fabrication requires the aid of a tool costing P1,000, which will be useless after the 10,000 units are finished. The machine operator's wage is P50 per hour. If all other costs are identical, determine which material will be more economical to finish the 10,000-unit order. How much is the total cost difference between the use of metal A and metal B?arrow_forwardA retail store sold in the month of April 5,000 products that produced $45,000 in sales. In the month of May the company sold 6,000 products. The store workforce consists of four full-time workers who work 40-hour week. In April the store also had seven part-time workers at 10 hours per week, and in May the store had nine part-timers at 15 hours per week (assume four weeks in each month). Using sales dollars as the measure of output (assume the price of the product was the same for both months), what is the percentage change in labor productivity from April to May? Answer: 2.arrow_forward
- The Decision Sciences Department is trying todetermine whether to rent a slow or a fast copier. Thedepartment believes that an employee’s time is worth $15per hour. The slow copier rents for $4 per hour and it takesan employee an average of 10 minutes to complete copying(exponentially distributed). The fast copier rents for $15 perhour and it takes an employee an average of 6 minutes tocomplete copying. An average of 4 employees per hour needto use the copying machine (interarrival times areexponential). Which machine should the department rent?arrow_forwardMack's guitar fabrication shop produces low cost, highly durable guitars for beginners. Typically, out of the 100 guitars that begin production each month, only 82 percent are considered good enough to sell. The other 18 percent are scrapped due to quality problems that are identified after they have completed the production process. Each guitar sells for $260. Because some of the production process is automated, each guitar only requires 88 labor hours. Each employee works an average of 160 hours per month. Labor is paid at $10 per hour, materials cost is $42 per guitar, and overhead is $4,200. a. The labor productivity ratio for Mack's guitar fabrication shop is $26.65 per hour. b. The multifactor productivity ratio for Mack's guitar fabrication shop is (Enter your response rounded to two decimal places.)arrow_forwardMack's guitar fabrication shop produces low cost, highly durable guitars for beginners. Typically, out of the 100 guitars that begin production each month, only 82 percent are considered good enough to sell. The other 18 percent are scrapped due to quality problems that are identified after they have completed the production process. Each guitar sells for $240. Because some of the production process is automated, each guitar only requires 10 labor hours. Each employee works an average of 160 hours per month. Labor is paid at $10 per hour, materials cost is $40 per guitar, and overhead is $3,800. Part 2 a. The labor productivity ratio for Mack's guitar fabrication shop isarrow_forward
- An injector machine goes down roughly 20% of the time (the injector gums up and needs to be cleaned, a quick process). One operator is assigned to service three identical such machines. Each machine can produce 100 parts/h if running properly (i.e., not down). The operator is paid $10/h and each machine costs $20/h to operate. Consider 8hr/shift a) Please fill in the table below: b) How many parts can you produce per shift? c) What is the unit cost fper part for this operation? d) If you hire another operator at the same rate to assist the first operator, what is the unit cost now? e) Is it worth hiring another operator at the same rate to assist the first operator, in case more than one machine goes down at the same time?arrow_forwardA machine used for cutting materials in a factory has the following outputs per hour at various speeds and required periodic tool regrinding at intervals cited. Speed Hour Output per Tool RegrindingA 200 pieces every 8 hours B 280 pieces every 5 hours A set of tools costs 560 and can be ground twenty times. Each regrinding costs 54.00 and the time needed to regrind and change tools is 1 hour. The machine operator is paid 35.00 per hour including the time the tool is changed. The tool grinder who also sets the tools to the machine is paid 40.00 per hour. The hourly rate chargeable against the machine is 38.00, regardless of machine speed. Which speed is more ecomical? A. Speed B, 0.096/pc B Speed B, 0.087/pc C. Speed A, .054/pc D. Speed A >037/pcarrow_forwardIt takes an operator 1.60 minute to service a machine and 0.4 minute to walk to the next machine. Each machine runs automatically for 6 minutes, the operator earns $12.00/hour and the machines cost $18.00/hour to run. After calculating n1 and n2, How much is the production rate per hour R, with n1 and n2? OA. Rn1 = 31.6 Rn2 = 33.3 OB.Rn1 = 27.3 Rn2 = 35.3arrow_forward
- I need typing clear urjent no chatgpt use i will give 5 upvotesarrow_forwardOnly typed explanation otherwise leave it Answer only C partarrow_forward1) An operator is used for loading and unloading of parts to automated machines. Loading time is 1 minute; unloading time is 2 minutes, machining time is 30 minutes, Operator travel time between the machines including the inspection time is 4 minutes. Cost of operator is C₁=40 TL/Hour, cost of a machine is C₂-200 TL/Hour. What is the cost per unit of production if optimum number of machines is assigned to the operator? (Note: Times are given in minutes and costs are per hour) a) 231 TL/unit b) 6930 TL/unit c) 115.5 TL/unit d) 240 TL/unit e) 132 TL/unit 2) An operator is used for loading and unloading of parts to automated machines. Loading time is 1 minute; unloading time is 2 minutes, machining time is 30 minutes; Operator travel time between the machines including the inspection time is 4 minutes. Cost of operator is C1=40 TL/Hour; cost of a machine is C₂=200 TL/Hour. How many machines (integer number) should be assigned to the operator so that the total operator and machine costs…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,