Summary Introduction
To determine: The way to minimize the total cost of disposing the wastes from both the cities.
Linear programming:
It is a mathematical modeling procedure where a linear function is maximized or minimized subject to certain constraints. This method is widely useful in making a quantitative analysis which is essential for making important business decisions.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
During an eight-hour shift, 750 non-defective parts are desired as a result of a manufacturing operation. The default operation time is 15 minutes. As the operators of machine are inexperienced, the actual time they take to perform the operation is 20 minutes, and, on average, a fifth of the parts that start to be manufactured are lost. Assuming that each one of the machines used in this operation will not be available for one hour in each shift, determine the number of machines needed.
There are two companies manufacturing drones. Company A manufactures mass market drones, while company B manufactures customised drones according to customers’ requirements. In 2020, company A produces 3,200 drones, 3% of which were found to be defective and cannot pass the quality check. Company A employs 5 workers working an average of 8 hours a day in the drone production, and they worked 200 working days in 2020.In contrast, company B produces 900 drones, 10% of which were found to be defective and cannot pass the quality check. Company B employs 3 workers working an average of 6 hours a day in the drone production, and they worked 170 days in 2020.
(a) If the drone manufacturing is seen as a process, what is considered as the output of the production processes of companies A and B and why?
(b) Measure the single-factor manpower productivity for the two companies.
(c) Is it reasonable to compare the manpower productivity of the two companies and reach a conclusion that one company…
Assuming your company is producing Apple and Samsung phone cases. It is required to process in the assembly and paint shops to make either phone case. It takes 1/60 of a day and 1/40 of a day to paint an Apple case and a Samsung case in the paint shop, respectively. It takes 1/50 of a day to assemble either type of case in the assembly shop. An Apple phone case and a Samsung phone case yield profits of $300 and $220, respectively, per case sold.
What is a maximum-profit daily production plan for your company?
Chapter 4 Solutions
PRACTICAL MGT. SCIENCE (LL)-W/MINDTAP
Ch. 4.2 - Prob. 1PCh. 4.2 - Prob. 2PCh. 4.2 - Prob. 3PCh. 4.2 - Prob. 4PCh. 4.2 - Prob. 5PCh. 4.2 - Prob. 6PCh. 4.3 - Prob. 7PCh. 4.3 - Prob. 8PCh. 4.3 - Prob. 9PCh. 4.3 - Prob. 10P
Ch. 4.3 - Prob. 11PCh. 4.3 - Prob. 12PCh. 4.4 - Prob. 13PCh. 4.4 - Prob. 14PCh. 4.4 - Prob. 15PCh. 4.4 - Prob. 16PCh. 4.4 - Prob. 17PCh. 4.4 - Prob. 18PCh. 4.4 - Prob. 19PCh. 4.5 - Prob. 20PCh. 4.5 - Prob. 21PCh. 4.5 - Prob. 22PCh. 4.5 - Prob. 23PCh. 4.5 - Prob. 24PCh. 4.5 - Prob. 25PCh. 4.6 - Prob. 26PCh. 4.6 - Prob. 27PCh. 4.6 - Prob. 28PCh. 4.6 - Prob. 29PCh. 4.7 - Prob. 30PCh. 4.7 - Prob. 31PCh. 4.7 - Prob. 32PCh. 4.7 - Prob. 33PCh. 4.7 - Prob. 34PCh. 4.7 - Prob. 35PCh. 4.7 - Prob. 36PCh. 4.7 - Prob. 37PCh. 4.7 - Prob. 38PCh. 4.7 - Prob. 39PCh. 4.7 - Prob. 40PCh. 4.8 - Prob. 41PCh. 4.8 - Prob. 42PCh. 4.8 - Prob. 43PCh. 4.8 - Prob. 44PCh. 4 - Prob. 45PCh. 4 - Prob. 46PCh. 4 - Prob. 47PCh. 4 - Prob. 48PCh. 4 - Prob. 49PCh. 4 - Prob. 50PCh. 4 - Prob. 51PCh. 4 - Prob. 52PCh. 4 - Prob. 53PCh. 4 - Prob. 54PCh. 4 - Prob. 55PCh. 4 - Prob. 56PCh. 4 - Prob. 57PCh. 4 - Prob. 58PCh. 4 - Prob. 59PCh. 4 - Prob. 60PCh. 4 - Prob. 61PCh. 4 - Prob. 62PCh. 4 - Prob. 63PCh. 4 - Prob. 64PCh. 4 - Prob. 65PCh. 4 - Prob. 66PCh. 4 - Prob. 67PCh. 4 - Prob. 68PCh. 4 - Prob. 69PCh. 4 - Prob. 70PCh. 4 - Prob. 71PCh. 4 - Prob. 72PCh. 4 - Prob. 73PCh. 4 - Prob. 74PCh. 4 - Prob. 75PCh. 4 - Prob. 76PCh. 4 - Prob. 77PCh. 4 - Prob. 78PCh. 4 - Prob. 79PCh. 4 - Prob. 80PCh. 4 - You want to take out a 450,000 loan on a 20-year...Ch. 4 - Prob. 82PCh. 4 - Prob. 83PCh. 4 - Prob. 84PCh. 4 - Prob. 85PCh. 4 - Prob. 86PCh. 4 - Prob. 87PCh. 4 - Prob. 88PCh. 4 - Prob. 89PCh. 4 - Prob. 90PCh. 4 - Prob. 91PCh. 4 - Prob. 92PCh. 4 - Prob. 93PCh. 4 - Prob. 94PCh. 4 - Prob. 95PCh. 4 - Prob. 96PCh. 4 - Prob. 97PCh. 4 - Prob. 98PCh. 4 - Prob. 99PCh. 4 - Prob. 100PCh. 4 - Prob. 101PCh. 4 - Prob. 102PCh. 4 - Prob. 103PCh. 4 - Prob. 104PCh. 4 - Prob. 105PCh. 4 - Prob. 106PCh. 4 - Prob. 107PCh. 4 - Prob. 108PCh. 4 - Prob. 109PCh. 4 - Prob. 110PCh. 4 - Prob. 111PCh. 4 - Prob. 112PCh. 4 - Prob. 113PCh. 4 - Prob. 114PCh. 4 - Prob. 115PCh. 4 - Prob. 116PCh. 4 - Prob. 117PCh. 4 - Prob. 118PCh. 4 - Prob. 119PCh. 4 - Prob. 120PCh. 4 - Prob. 121PCh. 4 - Prob. 122PCh. 4 - Prob. 123PCh. 4 - Prob. 124PCh. 4 - Prob. 125PCh. 4 - Prob. 126PCh. 4 - Prob. 127PCh. 4 - Prob. 128PCh. 4 - Prob. 129PCh. 4 - Prob. 130PCh. 4 - Prob. 131PCh. 4 - Prob. 132PCh. 4 - Prob. 133PCh. 4 - Prob. 134PCh. 4 - Prob. 135P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- The Tinkan Company produces one-pound cans for the Canadian salmon industry. Each year the salmon spawn during a 24-hour period and must be canned immediately. Tinkan has the following agreement with the salmon industry. The company can deliver as many cans as it chooses. Then the salmon are caught. For each can by which Tinkan falls short of the salmon industrys needs, the company pays the industry a 2 penalty. Cans cost Tinkan 1 to produce and are sold by Tinkan for 2 per can. If any cans are left over, they are returned to Tinkan and the company reimburses the industry 2 for each extra can. These extra cans are put in storage for next year. Each year a can is held in storage, a carrying cost equal to 20% of the cans production cost is incurred. It is well known that the number of salmon harvested during a year is strongly related to the number of salmon harvested the previous year. In fact, using past data, Tinkan estimates that the harvest size in year t, Ht (measured in the number of cans required), is related to the harvest size in the previous year, Ht1, by the equation Ht = Ht1et where et is normally distributed with mean 1.02 and standard deviation 0.10. Tinkan plans to use the following production strategy. For some value of x, it produces enough cans at the beginning of year t to bring its inventory up to x+Ht, where Ht is the predicted harvest size in year t. Then it delivers these cans to the salmon industry. For example, if it uses x = 100,000, the predicted harvest size is 500,000 cans, and 80,000 cans are already in inventory, then Tinkan produces and delivers 520,000 cans. Given that the harvest size for the previous year was 550,000 cans, use simulation to help Tinkan develop a production strategy that maximizes its expected profit over the next 20 years. Assume that the company begins year 1 with an initial inventory of 300,000 cans.arrow_forwardIt costs a pharmaceutical company 75,000 to produce a 1000-pound batch of a drug. The average yield from a batch is unknown but the best case is 90% yield (that is, 900 pounds of good drug will be produced), the most likely case is 85% yield, and the worst case is 70% yield. The annual demand for the drug is unknown, with the best case being 20,000 pounds, the most likely case 17,500 pounds, and the worst case 10,000 pounds. The drug sells for 125 per pound and leftover amounts of the drug can be sold for 30 per pound. To maximize annual expected profit, how many batches of the drug should the company produce? You can assume that it will produce the batches only once, before demand for the drug is known.arrow_forwardAn industrial engineer has designed two alternative methods for accomplishing a production job. Both methods involve the acquisition of the same working place and other capital equipment to be used for this job only. Method A calls for a crew consisting of three men each costing Php30/hr. This method will result in the production of 10 units per hour of which two will be reject. Method B calls for a crew of two men each costing Php35/hr and should result in the production of eight units per hour of which one will be reject. The cost of the direct material lost in each reject is Php20. If a certain total number of units is to be produced find which method is economical?arrow_forward
- A machine used for cutting materials in a factory has the following outputs per hour at various speeds and required periodic tool regrinding at intervals cited. Speed Hour Output per Tool RegrindingA 200 pieces every 8 hours B 280 pieces every 5 hours A set of tools costs 560 and can be ground twenty times. Each regrinding costs 54.00 and the time needed to regrind and change tools is 1 hour. The machine operator is paid 35.00 per hour including the time the tool is changed. The tool grinder who also sets the tools to the machine is paid 40.00 per hour. The hourly rate chargeable against the machine is 38.00, regardless of machine speed. Which speed is more ecomical? A. Speed B, 0.096/pc B Speed B, 0.087/pc C. Speed A, .054/pc D. Speed A >037/pcarrow_forwardA gold mining area in Lanao contains on average 1 ounce of gold per ton. Two methods of processing are available; method a cost 1.5m per ton and recovers 90% of gold: method b cost 1.3m per ton and recovers 80% of the gold. If gold can be sold for 2.4m per ounce which method is better and by how mucharrow_forward4) The making of rivet holes in structural steel members can be done by 2 methods. The first method consists of laying out the position of the holes in the members and using a drill press costing P100k. The machinist is paid P60 per hour and he can drill 80 holes per hour. The second method makes use of a multiple-punch machine costing P80k. The punch operator is paid P40 an hour and he can punch out 1 hole for 3 seconds. This method also requires an expense of P1.25 per hole to set the machine. (a) if all other costs are assumed equal, what is the total cost for each machine for 10k holes, assuming the total cost of each machine to be charged to these holes? (b) for how many holes will the costs be equal?arrow_forward
- An airline company has been contracting a maintenance company to do overhauls for its planes at a cost of $51275 per plane per quarter. The airline company estimates that by building a $1461838 maintenance facility with a life of 5 years and a residual market value of $770217 at the end of its life, they could handle their own overhaul at a cost of only $42020 per plane per quarter. What is the minimum number of planes they must operate to make it just profitable to build this facility? (=2% per quarter). • 25 O 31 Clear my choicearrow_forwardThe College of Business and Public Administration at Benton University has a copy machine on each floor for faculty use. Heavy use of the five copy machines causes frequent failures. Maintenance records show that a machine fails every 2.5 days (or l = 0.40 failure/day). The college has a maintenance contract with the authorized dealer of the copy machines. Because the copy machines fail so frequently, the dealer has assigned one person to the college to repair them. The person can repair an average of 2.5 machines per day. Using the finite-source model, answer the followingquestions: a. What is the average utilization of the maintenance person?b. On average, how many copy machines are being repaired or waiting to be repaired?c. What is the average time spent by a copy machine in the repair system (waiting and being repaired)?arrow_forward1. UST 40,000 (Commerce 5,000; Medicine 15%; AB 20%; Law 5% and others) Average price per computer device Php25,000 Average price per Apple device Php30,000 In UST, students from Commerce, Law, and AB purchased at least one (1) computer device in December 2020. Given that students replace their computer devices once every 2 years on average, what is the projected market size (units/revenues) for computer devices for these colleges until the end of 2025? What is the concentration of sales/revenue of computer devices among the colleges (CDI)? Please include explanations and formulas. Thank youarrow_forward
- The College of Business and Public Administration at Benton University has a copy machine on each floor for faculty use. Heavy use of the five copy machines causes frequent failures. Maintenance records show that a machine fails every 2.5 days (or π = 0.40 failure/day). The college has a maintenance contract with the authorized dealer of the copy machines. Because the copy machines fail so frequently, the dealer has assigned one person to the college to repair them. The person can repair an average of 2.5 machines per day. Using the finite-source model, answer the following questions:a. What is the average utilization of the maintenance person?b. On average, how many copy machines are being repaired or waiting to be repaired?c. What is the average time spent by a copy machine in the repair system (waiting and being repaired)?arrow_forwardA manufacturing plant produces a product 'A' that requires one unit of 'B' and ½ unit of 'C'. Each unit of 'B' is comprised of one unit of 'D', two units of 'E', and one unit of 'F'. Each unit of 'C' requires ½ unit of 'G' and three units of 'H'. The manufacturing lead times for the components are as follows: 'A' - two weeks, 'B' - one week, 'C' - two weeks, 'D' - two weeks, 'E' - three weeks, 'F' - one week, 'G' - two weeks, 'H' - one week. There are 20 units in stock for each of these components. 100 units of 'A' are needed for delivery in seven weeks: a) Develop the product structure and indexed bill of materials for the product. b) Create a gross and net requirements plan for the manufacturer of the product.arrow_forwardsniparrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,