Concept explainers
(a)
Interpretation: Estimate of the process average.
Concept introduction:This can explore where the production data express a usual distribution the procedure can be defined by the process mean.
(b)
Interpretation: Estimate of the average range.
(c)
Interpretation: Construct an R-chart and
Concept introduction:X bar charts are a type of statistical process control chart which measures a central a shift in the central tendency of the process. In other words, X- bar charts monitor the mean or average of product characteristics. The central line of the X-bar chart is the average of the samples and limits.
R-chart or range-chart is also a type of statistical process control chart, but it monitors the range of dispersion or variability of process. The central line of the r- chart is the average range and limits
Want to see the full answer?
Check out a sample textbook solutionChapter 3 Solutions
MyLab Operations Management with Pearson eText -- Access Card -- for Operations Management: Processes and Supply Chains
- Operaion management No excel screen shot pleasearrow_forwardConduct brief research on four charts provide an explanation then identify how each one can be used in the healthcare profession and why they would add value to the analysis of a process outcome and provide data to guide process improvements.The charts are: Run Chart Gantt Chart Pareto Chart Control Chart Demonstrate your skills in conducting an analysis of these charts. Please provide an explanation of the charts and identify how each one can be used in your field and why they would add value to the analysis of a process outcome and provide data to guide process improvements.arrow_forwardManagement of Mittel Rhein AG of Köln, Germany, would like to reduce the amount of time between when a customer places an order and when the order is shipped. For the first quarter of operations during the current year the following data were reported: Inspection time- 0.7 daysWait time (from order to start of production) -16.6 daysProcess time -2.7 daysMove time -1.3 daysQueue time- 4.5 daysRequired:1. Compute the throughput time. (Round your answer to 1 decimal place.) 2. Compute the manufacturing cycle efficiency (MCE) for the quarter. (Round your answer to the nearest whole percentage (i.e., 0.12 should be entered as 12).) 3. What percentage of the throughput time was spent in non–value-added activities? (Round your answer to the nearest whole percentage (i.e., 0.12 should be entered as 12).) 4. Compute the delivery cycle time. (Round your intermediate calculations and final answer to 1 decimal place.) 5. If by using Lean Production all queue…arrow_forward
- Six Sigma Analytical Tools include all of the following except Checksheet Flowchart Outcome diagram Run Chart Process Control Chartarrow_forwardA maintenance group wants to increase the effectiveness of the repair work by tracking the number of maintenance requests that require a second call to complete the repair. The table below shows the data for 20 weeks. Is this process under control in terms of the rate of maintenance requests requiring a second call? Indicate whether the process is under control by drawing appropriate control charts / graphs.arrow_forwardHow does process improvement contribute to optimizing quality assurance outcomes?arrow_forward
- La Trobe university hire you as a consultant to model the student enrolment process using BPMN. Note, during the enrolment process student will select units of study (subjects), confirm their financial liability, upload a photo for a student card and complete other required administrative tasks. Your task is to model the process using BPMN.arrow_forwardPlease confirm if I have answer these questions correctly and provide rationale if not the case. Thank you very much!arrow_forwardces Inter-State Moving and Storage Company wishes to establish a control chart to monitor the proportion of residential moves that result in written complaints due to late delivery, lost items, or damaged items. A sample of 50 moves is selected for each of the last 12 months. The number of written complaints in each sample is 8, 7, 4, 8, 2, 7, 11, 6, 7, 6, 8, and 12. Click here for the Excel Data File a. Insert the mean proportion defective, UCL, and LCL (Leave no cells blank - be certain to enter "0" wherever required. Round your intermediate calculations and final answers to 2 decimal places.) Mean proportion defective UCL LCL c. Does it appear that the number of complaints is out of control for any of the months? Yes ONOarrow_forward
- What two basic assumptions must be satisfied in order to use a process capability index?arrow_forwardPlease do not give solution in image format thanku A regional airline is concerned about its on-time performance. The Memphis hub experiences 20 flight operations each day of the week, with the following record of on-time departures for the previous 10 days: 17, 16, 18, 19, 16, 15, 20, 17, 18, and 16. Prepare a p-chart with a sample size consisting of one week’s average on-time percentage. What is UCL and LCL?arrow_forwardDescribe a way that Waste Management could go about obtaining a simple random sample of its customers.arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.