Operations and Supply Chain Management 9th edition
9th Edition
ISBN: 9781119320975
Author: Roberta S. Russell, Bernard W. Taylor III
Publisher: WILEY
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 3, Problem 5P
a)
Summary Introduction
To construct: A c-chart and determine whether the process is in control or not?
b)
Summary Introduction
To determine: The non-random causes that might occur when the process is out of control.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Auto pistons at Wemming Chung's plant in Shanghai are produced in a forging process, and the diameter is a critical factor
that must be controlled. From sample sizes of 5 pistons produced each day, the mean and the range of this diameter have
been as follows:
Day
Mean (mm)
Range R (mm)
158
4.3
151.2
4.4
155.7
4.2
153.5
4.8
156.6
4.5
What is the UCL using 3-sigma?(round your response to two decimal places).
1.
2.
4.
A. Choudhury’s bowling ball factory in Illinois makes
bowling balls of adult size and weight only. The standard devia-tion in the weight of a bowling ball produced at the factory is
known to be 0.12 pounds. Each day for 24 days, the averageweight, in pounds, of nine of the bowling balls produced that dayhas been assessed as follows:
a) Establish a control chart for monitoring the average weights
of the bowling balls in which the upper and lower control lim-its are each two standard deviations from the mean. What are
the values of the control limits?b) If three standard deviations are used in the chart, how do thesevalues change? Why?
The temperature of a burrito served to a customer in a local Mexican restaurant
A: Discrete
B; Continous
Chapter 3 Solutions
Operations and Supply Chain Management 9th edition
Ch. 3.S - Prob. 1QCh. 3.S - Prob. 2QCh. 3.S - Prob. 3QCh. 3.S - Prob. 4QCh. 3.S - Prob. 5QCh. 3.S - Prob. 6QCh. 3.S - Prob. 7QCh. 3.S - The Great Lakes Company, a grocery store chain,...Ch. 3.S - Prob. 2PCh. 3.S - Prob. 3P
Ch. 3.S - The Fast Break Computer Company assembles personal...Ch. 3.S - Prob. 5PCh. 3 - Using Sampling and Statistics to Analyze...Ch. 3 - Prob. 2.1ASCCh. 3 - Prob. 3.1ASCCh. 3 - Prob. 4.1ASCCh. 3 - Prob. 5.1ASCCh. 3 - Prob. 1QCh. 3 - Prob. 2QCh. 3 - Prob. 3QCh. 3 - Prob. 4QCh. 3 - Prob. 5QCh. 3 - Prob. 6QCh. 3 - Prob. 7QCh. 3 - Prob. 8QCh. 3 - Prob. 9QCh. 3 - Prob. 10QCh. 3 - Prob. 11QCh. 3 - Prob. 1PCh. 3 - Prob. 2PCh. 3 - Prob. 3PCh. 3 - Prob. 4PCh. 3 - Prob. 5PCh. 3 - Prob. 6PCh. 3 - Prob. 7PCh. 3 - Prob. 8PCh. 3 - Prob. 9PCh. 3 - Prob. 10PCh. 3 - Prob. 11PCh. 3 - Prob. 12PCh. 3 - Prob. 13PCh. 3 - Prob. 14PCh. 3 - Prob. 15PCh. 3 - Prob. 16PCh. 3 - Prob. 17PCh. 3 - Prob. 18PCh. 3 - Prob. 20PCh. 3 - Prob. 21PCh. 3 - Prob. 22PCh. 3 - Prob. 23PCh. 3 - Prob. 24PCh. 3 - Prob. 25PCh. 3 - Prob. 26PCh. 3 - Prob. 27PCh. 3 - Prob. 28PCh. 3 - Prob. 29PCh. 3 - Prob. 30PCh. 3 - Prob. 32PCh. 3 - Prob. 33PCh. 3 - Prob. 34PCh. 3 - Prob. 36PCh. 3 - Prob. 37PCh. 3 - Prob. 38PCh. 3 - Prob. 39PCh. 3 - Prob. 40PCh. 3 - Elon Corporation manufactures parts for an...Ch. 3 - Prob. 42PCh. 3 - Prob. 44PCh. 3 - Prob. 45PCh. 3 - Prob. 46PCh. 3 - Prob. 47PCh. 3 - Metropolitan General Hospital is a city-owned...Ch. 3 - Prob. 50PCh. 3 - Prob. 51PCh. 3 - The Shuler Motor Mile is a high-volume discount...Ch. 3 - Prob. 1.1CPCh. 3 - Prob. 2.1CPCh. 3 - Improving Service Time at Daves Burgers Daves...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- The Road King Tire Company in Birmingham wants to moni-tor the quality of the tires it manufactures. Each day the com-pany quality-control manager takes a sample of 100 tires, tests them, and determines the number of defective tires. The re-sults of 20 samples have been recorded as follows:Construct a p-chart for this process using 2 limits and for each of the last 30 weekdays are shown as follows:describe the variation in the process. Sample Defectives Sample Defectives1 14 11 182 12 12 103 9 13 194 10 14 205 11 15 176 7 16 187 8 17 188 14 18 229 16 19 2410 17 20 23arrow_forwardAn e-commerce website has received some complaints on Billing errors. Managers ask the accounting department to monitor the shipping process and make sure of the quality in their process. To monitor the process, for 10 consecutive weeks, they look into the first 100 shipments and count the number of Billing errors as shown in table below: 45 52 6 3 63 7 8 9 10 1 6 1 2 Construct a two-sigma limit control chart to show whether the shipping process in this e-commerce firm needs any improvement or performs at an acceptable level. (Round your answer to three decimal places.) Week 1 2 3 Number of Billing errors. 5 1 3 Upper Control Limit Lower Control Limitarrow_forwardValtec Electronics Valtec Electronics fills orders for its electronic components and parts by truck to customers through several distribution centers. A measure of its supply chain responsiveness is order fulfillment lead time, which is the number of days from when a company receives an order to when it is delivered to the customer. A distribution center manager has taken 20 samples of 5 orders each during the month and recorded the lead time for each as follows. Construct an Xbar chart and R-chart using 30 limits for this data and indicate if the process is in control. Load Time (Days) Load Time (Days) 2.4 Samples Samples 1 1.3 2.4 0.7 3.0 1.8 15 3.7 7.0 1.4 3.3 2 2.1 1.2 1.0 2.5 3.6 16 3.6 2.7 4.8 2.0 1.7 3 4.2 3.3 2.6 1.5 3.0 17 0.4 1.8 6.5 3.2 4.8 4 1.6 2.1 2.8 0.9 1.5 18 5.3 2.9 3.4 4.8 4.6 5 2.6 3.0 1.4 4.6 1.9 19 2.7 3.6 2.9 4.1 5.2 6 0.8 2.7 5.8 3.7 4.5 20 4.7 2.0 2.0 3.1 1.8 7 2.6 3.5 3.1 3.6 1.4 8 3.4 6.1 1.5 2.5 2.8 9 3.1 2.5 2.2 2.9 1.8 10 2.4 4.8 5.9 3.2 4.4 11 1.9 2.7 3.4…arrow_forward
- Inter-State Moving and Storage Company wishes to establish a control chart to monitor the proportion of residential moves that result in written complaints due to late delivery, lost items, or damaged items. A sample of 40 moves is selected for each of the last 12 months. The number of written complaints in each sample is 9, 7, 4, 9, 1, 9, 11, 5, 5, 8, 7, and 15. Number Defective Percent defective 9 18 7 14 4 8 9 18 1 2 9 18 11 22 5 10 5 10 8 16 7 14 15 30 a. Insert the mean proportion defective, UCL, and LCL. (Leave no cells blank - be certain to enter "0" wherever required. Round your intermediate calculations and final answers to 2 decimal places.) Mean proportion defective UCL LCL c. Does it appear that the number of complaints is out of control for any of the months?multiple choice Yes Noarrow_forwardChoose a product on the market and discuss how process control charts could be used to monitor and control its quality during manufacturing. Be sure to specify at least 2 process attributes that should be statistically monitored or controlled during the manufacturing of the product you have chosen.arrow_forwardProblem 1: Auto pistons at Wemming Chung’s plant in Shanghai are produced in a forging process, and the diameter is a critical factor that must be controlled. From sample sizes of 10 pistons produced each day, the mean and the range of this diameter have been as follows: Day Mean (mm) Range (mm) 1 156.9 4.2 2 153.2 4.6 3 153.6 4.1 4 155.5 5.0 5 156.6 4.5 a) What are the UCL x (line on top of x, counldn't find the button to do it) and LCL x (line on top of x) , using 3σ? Plot the data. b) What are the UCL R and LCL R , using 3σ? Plot the data. c) Is the Process in Control? (Please screen shot the EXCEl if its in excel) Note:- Do not provide handwritten solution. Maintain accuracy and quality in your answer. Take care of plagiarism. Answer completely. You will get up vote for sure.arrow_forward
- A garment manufacturer wants to set up a control chart for irregularities. Each week a random sample of 25 garments is collected from production and the number of irregularities is recorded. The table below gives the results for the past 20 weeks: 1 6 8 10 Sample Number Irregularities 11 2 3 4 5 7 9 8 12 4 16 5 8 17 10 11 16 20 Sample Number | Irregularities 11 12 13 14 15 17 18 19 7 12 13 8 17 11 9 10 (a) Using the data set up an appropriate control chart using a three sigma control limits. (b) Comment on the process. [8 marks] [2 marks] 9,arrow_forward2- Quality Control Charts A local brewery and bottling plant wants to keep track of the bottling filling equipment's accuracy, Bottles are to be filled with exactly 16 ounces of the drink. The following is data from the bottling equipment where 5 samples of bottles filled were pulled every hour and measured for actual quantity filled. 1- Calculate the UCL, LCL and mean for the X-bar and R data 2- Draw an X-Bar chart and a R chart. 3- Is this filling process in control or out of control? Hour X-bar R 1 16.05 .20 2 16.03 3 15.96 4 15.97 16.03 16.06 15.98 16.09 15.94 16.01 5 6 7 8 9 10 @n-5: A2 = 0.58, D3 =0, D4 = 2.11 .25 .62 .58 .71 .37 .46 .21 .35 .29arrow_forwardA Quality Analyst wants to construct a control chart for determining whether three machines, all producing the same product, are under control with regard to a particular quality variable. Accordingly, he sampled four units of output from each machine, with the following results: Machine Measurements #1 17 15 15 17 #2 16 25 18 25 # 3 23 24 23 22 What is the estimate of the process mean for whenever it is under control? What is the sample average range based upon this limited sample? What are the x-bar chart upper and lower control limits?arrow_forward
- The IRS is concerned with improving the accuracy of tax information given by its representatives over the telephone. Previous studies involved asking a set of 25 questions of a large number of IRS telephone representatives to determine the proportion of correct responses. Historically, the averageproportion of correct responses has been 72 percent. Recently, IRS representatives have been receiving more training. On April 26, the set of 25 tax questions were again asked of 20 randomly selected IRS telephone representatives. The numbers of correct answers were 18, 16, 19, 21, 20, 16,21, 16, 17, 10, 25, 18, 25, 16, 20, 15, 23, 19, 21, and 19. a. What are the upper and lower control limits for the appropriate p-chart for the IRS? Use z = 3. b. Is the tax information process in statistical control?arrow_forwardA quality control manager in an Omani bottling company takes 5 samples for quality control purposes. These sample mean (X-bar) are; 8.51, 8.18, 11.07, 10.03, and 10.23 respectively. Additionally, the range values for these 5 samples are; 3.33, 2.61, 3.39, 4.39, and 6.49. If the upper control limit for X-bar chart is 11.95, what should be the most appropriate sample size? O a. 3 O b. 4 О с. O d. None is correct Oe. S PAGE NEXT PAGE MAG241C 1500R 144 SURVED EO GAMING MONITOR Fa a Aarrow_forwardA quality control manager in an Omani bottling company takes 5 samples for quality control purposes. These sample mean (X-bar) are; 8.51,8.18, 11.07, 10.03, and 10.23 respectively. Additionally, the range values for these 5 samples are; 3.33, 2.61, 3.39,4.39, and 6.49. If the lower control limit for X-bar chart is 6.65, what should be the most appropriate sample size? O a. 3 O b. 5 O c. Od. None is correct O e. 4arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.