The correct readings of rod which are necessary on the batter board tops to set them properly.
Given:
Floor elevation
Benchmark
Sight
Concept Used:
This is one more method of layout of buildings, is to stake two points on the building, one of them with the total station instrument, take a backsight on the other and stack all the remaining points from that setup using pre -calculated angles and distances.
Calculation:
Calculate the height of instrument by adding bench mark
Calculate the elevation value for batter roads by using the formula:
Now, we must determine the rod reading value at the batter rods by:
Conclusion:
Therefore, the rod readings are necessary on the batter board tops to set them properly is
Want to see the full answer?
Check out a sample textbook solutionChapter 23 Solutions
Elementary Surveying: An Introduction To Geomatics (15th Edition)
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning