Concept explainers
The procedure of finished grades in machine control projects.
The machine control system actually controls the heavy equipment on the job site through the use of hydraulics.
The data which is necessary for finished grades to be established in machine control projects includes Digital Elevation Model (DEM).
With GNSS receivers, robotic total stations, sonic receptors and lasers to guide the equipment operators, and an on-board computer that continually updates cut and fill information, the grading can be accomplished without the need for construction stakes and with limited assistance of a grade foreman.
A machine control project has been implemented on dozers, hoes, pans, graders and trucks.
Want to see the full answer?
Check out a sample textbook solutionChapter 23 Solutions
Elementary Surveying: An Introduction To Geomatics (15th Edition)
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning