To solve: The given information by using the assignment method.
Introduction: The assignment method is one of the methods available in the process of optimization. Here, the jobs are assigned to every available resource.
a)
Answer to Problem 7P
The problem has been solved by using the assignment method.
Explanation of Solution
Given information:
Squad | Case | ||||
A | B | C | D | E | |
1 | 14 | 7 | 3 | 7 | 27 |
2 | 20 | 7 | 12 | 6 | 30 |
3 | 10 | 3 | 4 | 5 | 21 |
4 | 8 | 12 | 7 | 12 | 21 |
5 | 13 | 25 | 24 | 26 | 8 |
Assign cases to respective squads:
Row minimum:
Squad | Case | Row minimum | ||||
A | B | C | D | E | ||
1 | 14 | 7 | 3 | 7 | 27 | 3 |
2 | 20 | 7 | 12 | 6 | 30 | 6 |
3 | 10 | 3 | 4 | 5 | 21 | 3 |
4 | 8 | 12 | 7 | 12 | 21 | 7 |
5 | 13 | 25 | 24 | 26 | 8 | 8 |
Table after the row subtraction is given below:
The row minimum value mentioned in the above table should be subtracted from each value of the row.
Squad | Case | ||||
A | B | C | D | E | |
1 | 11 | 4 | 0 | 4 | 24 |
2 | 14 | 1 | 6 | 0 | 24 |
3 | 7 | 0 | 1 | 2 | 18 |
4 | 1 | 5 | 0 | 5 | 14 |
5 | 5 | 17 | 16 | 18 | 0 |
Column minimum:
Squad | Case | ||||
A | B | C | D | E | |
1 | 11 | 4 | 0 | 4 | 24 |
2 | 14 | 1 | 6 | 0 | 24 |
3 | 7 | 0 | 1 | 2 | 18 |
4 | 1 | 5 | 0 | 5 | 14 |
5 | 5 | 17 | 16 | 18 | 0 |
Column minimum | 1 | 0 | 0 | 0 | 0 |
Table after the column subtraction is given below:
The column minimum value mentioned in the above table should be subtracted from each value of the column.
Squad | Case | ||||
A | B | C | D | E | |
1 | 10 | 4 | 0 | 4 | 24 |
2 | 13 | 1 | 6 | 0 | 24 |
3 | 6 | 0 | 1 | 2 | 18 |
4 | 0 | 5 | 0 | 5 | 14 |
5 | 4 | 17 | 16 | 18 | 0 |
Assigning squads to the cases:
Step 1: The first row must be checked for the zero. As there is only one zero in the first row, it must be marked and the entire column should be striked out.
Step 2: As only one zero is available in the second row, it must be marked and the entire column should be striked out.
Step 3: As only one zero is available in the third row, it must be marked and the entire column should be striked out.
Step 4: As only one zero is available in the fourth row, it must be marked and the entire column should be striked out.
Step 5: As only one zero is available in the fourth row, it must be marked and the entire column should be striked out.
Step 5: All the zeroes in the table have been striked out. The marked zeroes help to assign the cases to the squads.
Calculate the total person-days that are projected by using the assignment method:
The value has been taken in the given information where, the zeroes have been marked in the final answer.
Squad | Case | Value |
1 | C | 3 |
2 | D | 6 |
3 | B | 3 |
4 | A | 8 |
5 | E | 8 |
Total | 28 |
According to the table, Squad 1 should be assigned to Case C, Squad 2 should be assigned to Case D, Squad 3 should be assigned to Case B, Squad 4 should be assigned to Case A, and Squad 5 should be assigned to Case E. The total person days are 28 days.
b)
To solve: The given information by using assignment method.
Introduction: The assignment method is one of the methods available in the process of optimization. Here, the jobs are assigned to every available resource.
b)
Answer to Problem 7P
The problem has been solved by using the assignment method.
Explanation of Solution
Given information:
Squad | Case | ||||
A | B | C | D | E | |
1 | 14 | 7 | 3 | 7 | 27 |
2 | 20 | 7 | 12 | 6 | 30 |
3 | 10 | 3 | 4 | 5 | 21 |
4 | 8 | 12 | 7 | 12 | 21 |
5 | 13 | 25 | 24 | 26 | 8 |
It is given that the squad 5 cannot work on Case 5 because of the conflict.
Modified given information:
It is given that the squad 5 cannot work on Case 5 because of the conflict. Thus, the value should be modified from 8 to any other higher values. It is taken as 50 here.
Squad | Case | ||||
A | B | C | D | E | |
1 | 14 | 7 | 3 | 7 | 27 |
2 | 20 | 7 | 12 | 6 | 30 |
3 | 10 | 3 | 4 | 5 | 21 |
4 | 8 | 12 | 7 | 12 | 21 |
5 | 13 | 25 | 24 | 26 | 50 |
Assign cases to respective squads:
Row minimum:
Squad | Case | Row minimum | ||||
A | B | C | D | E | ||
1 | 14 | 7 | 3 | 7 | 27 | 3 |
2 | 20 | 7 | 12 | 6 | 30 | 6 |
3 | 10 | 3 | 4 | 5 | 21 | 3 |
4 | 8 | 12 | 7 | 12 | 21 | 7 |
5 | 13 | 25 | 24 | 26 | 50 | 13 |
Table after the row subtraction is given below:
The row minimum value mentioned in the above table should be subtracted from each value of the row.
Squad | Case | ||||
A | B | C | D | E | |
1 | 11 | 4 | 0 | 4 | 24 |
2 | 14 | 1 | 6 | 0 | 24 |
3 | 7 | 0 | 1 | 2 | 18 |
4 | 1 | 5 | 0 | 5 | 14 |
5 | 0 | 12 | 11 | 13 | 37 |
Column minimum:
Squad | Case | ||||
A | B | C | D | E | |
1 | 11 | 4 | 0 | 4 | 24 |
2 | 14 | 1 | 6 | 0 | 24 |
3 | 7 | 0 | 1 | 2 | 18 |
4 | 1 | 5 | 0 | 5 | 14 |
5 | 0 | 12 | 11 | 13 | 37 |
Column minimum | 0 | 0 | 0 | 0 | 14 |
Table after the column subtraction is given below:
The column minimum value mentioned in the above table should be subtracted from each value of the column.
Squad | Case | ||||
A | B | C | D | E | |
1 | 11 | 4 | 0 | 4 | 10 |
2 | 14 | 1 | 6 | 0 | 10 |
3 | 7 | 0 | 1 | 2 | 4 |
4 | 1 | 5 | 0 | 5 | 0 |
5 | 0 | 12 | 11 | 13 | 23 |
Assigning squads to the cases:
Step 1: The first row must be checked for the zero. As there is only one zero in the first row, it must be marked and the entire column should be striked out.
Step 2: As only one zero is available in the second row, it must be marked, and the entire column should be striked out.
Step 3: As only one zero is available in the third row, it must be marked, and the entire column should be striked out.
Step 4: As only one zero is available in the fourth row, it must be marked, and the entire column should be striked out.
Step 5: As only one zero is available in the fifth row, it must be marked, and the entire column should be striked out.
Step 5: All the zeroes in the table have been strikedout. The marked zeroes help to assign the cases to the squads.
Calculate the total person days that are projected by using the assignment method:
The value has been taken in the given information where, the zeroes have been marked in the final answer.
Squad | Case | Value |
1 | C | 3 |
2 | D | 6 |
3 | B | 3 |
4 | E | 21 |
5 | A | 13 |
Total | 46 |
According to the table, Squad 1should be assigned to Case C, Squad 2 should be assigned to Case D, Squad 3 should be assigned to Case B, Squad 4 should be assigned to Case E, and Squad 5 should be assigned to Case A. The total person days are 46 days.
Want to see more full solutions like this?
Chapter 15 Solutions
EBK PRINCIPLES OF OPERATIONS MANAGEMENT
- I need to forecast using a 3-Period-Moving-Average-Monthly forecasting model which I did but then I need to use my forecast numbers to generate a Master Production Schedule (MPS) I have to Start with actual sales (my own test data numbers) for August-2022 Oct-2022 i need to create MPS to supply demand starting November-2022 April 2023 I just added numbers without applying formulas to the mps on the right side of the spreadsheet because I do not know how to do it. The second image is the example of what it should look like. Thank You.arrow_forwardSolve the following Question 1. How do volume and variety affect the process selection and layout types? Discuss 2. How is the human resource aspect important to operation function? Discuss 3. Discuss the supply network design and its impact on the overall performance of the organization.arrow_forwardHelp with question?arrow_forward
- What are some good examples of bullet points on a resume for a Christian Elementary School?arrow_forwardWhat is an example of a cover letter for a Christian School Long-Term Substitute Teaching position?arrow_forwardThe supply chain is a conventional notion, but organizations are only really interested in making products that they can sell to customers. Provided they have reliable supplies of materials and reasonable transport for finished products, logistics is irrelevant. Do you think this is true? If yes, explain, and if no, clearly explain as well.arrow_forward
- working as a program operations managerarrow_forward12 X1, X230 1 x =0x2 write the Following linear Programming model by 1- general Form Canonical Forms Canonical formY 2- Standard Form Max Z=35X+ 4 X 2 +6 X3 ST. X+2X2-5x3 = 40 3X, + 6X2 + 7x 3 = 30 7x, +lox2 x3 = 50 X3 X 2 X 3 <0arrow_forwarda/ a Minimum cost assign each worker for one job at Jobs J1 12 33 WI 2 4 6 W2 5 W3 5 33 6 7arrow_forward
- وبة واضافة هذه القيمة الى القيم Ex: Assign each job for each worker at minimum total Cost عمل لكل عامل وبأقل كلفة ممكنة obs الأعمال Workors العمال J1 J2 J3 J4 W₁ 15 13 14 12 W2 11 12 15 13 W3 13 12 10 11 W4 15 17 14 16arrow_forwardThe average completion time (flow time) for the sequence developed using the FCFS rule = 11.75 days (round your response to two decimal places). The percentage utilization for the sequence developed using the FCFS rule = 42.55 % (enter your response as a percentage rounded to two decimal places). b) Using the SPT (shortest processing time) decision rule for sequencing the jobs, the order is (to resolve a tie, use the order in which the jobs were received): An Alabama lumberyard has four jobs on order, as shown in the following table. Today is day 205 on the yard's schedule. In what sequence would the jobs be ranked according to the decision rules on the left: Job Due Date A 212 B 209 C 208 D 210 Duration (days) 6 3 3 8 Sequence 1 Job B 2 3 4 A D The average tardiness (job lateness) for the sequence developed using the SPT rule = 5.00 days (round your response to two decimal places). The average completion time (flow time) for the sequence developed using the SPT rule = 10.25 days…arrow_forwardWith the aid of examples, fully discuss any five (5) political tactics used in organisations.arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.