Electrical Wiring Residential
18th Edition
ISBN: 9781285170954
Author: Ray C. Mullin, Phil Simmons
Publisher: Cengage Learning
expand_more
expand_more
format_list_bulleted
Concept explainers
Textbook Question
Chapter 12, Problem 8R
Duplex receptacles connected to the 20-ampere small-appliance branch circuits in kitchens and dining rooms (Circle the correct answer):
- a. may be rated 15 amperes. (True) (False)
- b. must be rated 15 amperes. (True) (False)
- c. may be rated 20 amperes. (True) (False)
- d. must be rated 20 amperes. (True) (False)
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
Refer to the National Electrical Code or the working drawings when necessary. Whereapplicable, responses should be written in complete sentences.A 300-kilovolt-ampere transformer bank consisting of three 100-kilovolt-amperetransformers has a 3-phase, 480-volt delta primary and a 120/240-volt, 3-phase, 4-wiredelta-connected secondary.For problems 1 through 4 show calculations and/or source of information.
1. Sketch the secondary connections, and indicate where a 120-volt load couldbe connected.
Determine the size and type of wire to he installed
to a building with temperature that reaches 80-90
degrees with the following loads. 10pcs. Of 200-
watt bulb 15pcs. Of 100-watt bulb Single phase,
230 source. And if you would be installing the wire
inside an EMT conduit, what size would you use
assuming that there would be 4 wires inside the
EMT
schedules are typically provided to detail the circuits and overcurrent protection required for
listribution equipment.
Branch-circuit
- Outlet
C.
d.
ore distribution points for electrical in ....
Switch
Panelboard
Chapter 12 Solutions
Electrical Wiring Residential
Ch. 12 - If everything on Circuit B7 were turned on, what...Ch. 12 - From what panelboard does the kitchen lighting...Ch. 12 - How many luminaires are connected to the kitchen...Ch. 12 - What color fluorescent lamps are recommended for...Ch. 12 - a. What is the minimum number of 20-ampere...Ch. 12 - Prob. 6RCh. 12 - Prob. 7RCh. 12 - Duplex receptacles connected to the 20-ampere...Ch. 12 - Prob. 9RCh. 12 - A fundamental rule regarding the grounding of...
Ch. 12 - How many circuit conductors enter the box a. where...Ch. 12 - Prob. 12RCh. 12 - Where is the speed control for the range hood fan...Ch. 12 - Who is to furnish the range hood? _____Ch. 12 - Prob. 15RCh. 12 - Complete the wiring diagram, connecting...Ch. 12 - Each 20-ampere small-appliance branch-circuit load...Ch. 12 - a. The Code requires a minimum of two...Ch. 12 - According to 210.52, no point along the floor line...Ch. 12 - Prob. 21RCh. 12 - Electric fans produce a certain amount of noise....Ch. 12 - Prob. 23RCh. 12 - Prob. 24RCh. 12 - Prob. 25RCh. 12 - Prob. 26RCh. 12 - Prob. 27RCh. 12 - The following is a layout for the lighting circuit...
Additional Engineering Textbook Solutions
Find more solutions based on key concepts
17–1C A high-speed aircraft is cruising in still air. How does the temperature of air at the nose of the aircra...
Thermodynamics: An Engineering Approach
The job of the _____ is to fetch instructions, carry out the operations commanded by the instructions, and prod...
Starting Out With Visual Basic (8th Edition)
Porter’s competitive forces model: The model is used to provide a general view about the firms, the competitors...
Management Information Systems: Managing The Digital Firm (16th Edition)
What output will the following lines of code display on the screen? cout "The works of Wolfgang\ninclude the f...
Starting Out with C++: Early Objects (9th Edition)
Assume a telephone signal travels through a cable at two-thirds the speed of light. How long does it take the s...
Electric Circuits. (11th Edition)
In Exercises 1 through 22, determine the output displayed in the text box or list box by the lines of code.
Introduction To Programming Using Visual Basic (11th Edition)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.Similar questions
- a. What circuit supplies the workshop lighting? ________________ b. What circuit supplies the plug-in strip over the workbench? ________________ c. What circuit supplies the freezer receptacle? ________________arrow_forward- Loads, Service, and Overcurrent Protection 6.a. The general lighting load is based on a _______ per square foot basis.A. kilowattB. number of circuitsC. volt-ampereD. general illumination6.b. What's the primary disadvantage of using copper conductors?A. AvailabilityB. WeightC. CostD. Durabilityarrow_forwardHow the required number of branch circuits can be determined?arrow_forward
- What is the meaning of calculated load?arrow_forwardHow many lighting branch circuits are provided in this dwelling? __________ a. What is the minimum load allowance for small-appliance circuits for dwellings? See NEC 220.52(A). __________ b. An individual 15-ampere branch circuit is run to the receptacle outlet behind the refrigerator instead of connecting it to one of the two 20-ampere small-appliance branch circuits that are required in kitchens. For this separate circuit, an additional 1500 volt-amperes (shall) (does not have to) be added to the load calculations for dwellings. (Circle the correct answer.)arrow_forwardladder diagram for three circuits, circuit A is one lampholder and one duplex receptacle controlled by a single pole switch, circuit B is a single pole switch controlling the top half of a duplex receptacle that when energized, is indicated by a pilot light at the single pole switch location plus an isolated ground duplex receptacle that is always hot, circuit C is the bottom half of the switched receptacle on circuit B is to be always hot plus another duplex receptacle that is controlled from two locations using coast 3-way wiring system two circuits are 3-wire multiwire branch circuitarrow_forward
- c.1. Which of the following is one of the three essential functions of an equipment grounding conductor?A. Provide an arc-fault current pathB. Establish groundingC. Establish bondingD. Ensure the system is groundedc.2. What's another name for the three-point method of Earth resistance testing?A. Fall-of-potentialB. Line surgeC. Spatial shieldingD. Leakage current c.3. If the National Electrical Code provides a requirement to ground equipment, it generally implies thatthere will be a direct connection to the Earth of a connection through a/anA. grounding electrode conductor.B. equipment grounding conductor.C. equipotential bonding conductor.D. bonding conductor.arrow_forwardPart 2: Analysis and selection of the Wind Turbine. The team decides at install a 30 MW wind farm. The turbine that has been selected by the local contractor is an Enercon wind turbine. The specifications of all the available Enercon wind turbine is shown in the attached datasheet. 1. Decide on the required number of wind turbines needed. 2. In your own words, explain what the Betz limit for wind turbines means.arrow_forward6.a. Extreme _______ may cause some nonmetallic conduits to become brittle and therefore moresusceptible to damage from physical contact.A. coldB. corrosionC. voltageD. heat6.b. Snap switches are permitted to be grouped or ganged in an enclosure provided the voltage between theadjacent snap switches does not exceed ___ V.A. 400B. 300C. 200D. 100arrow_forward
- Estimate the length of conduit to perform the next bends. EMT will be bend using a hand bender. Provide your answer in inches (just the number) using up to 2 decimals. The picture shows two panels connected by a back-to-back 23.5" stubs EMT 3/4" 6.25 ft Parrow_forwardYou are an electrician working in an industrial plant. The company is constructing a maintenance shop located 225 feet from the main plant electrical system. You are to install a 400-ampere three-phase wire system in the new maintenance shop. The service is supplied by the existing plant service. The voltage is 480 volts and the voltage drop is to be kept at 3% or below at full load. The conductors are to be aluminum. Determine the wire size needed for the 400-ampere service in accordance with the National Electrical Code. Assume that the conductors have type THWH insulation. (Note: As a general rule, for each 100 feet of conductor length the wire size is increased one standard size because of voltage drop.)arrow_forwardWhat are the three project categories an electrical contractor may choose to browse?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- EBK ELECTRICAL WIRING RESIDENTIALElectrical EngineeringISBN:9781337516549Author:SimmonsPublisher:CENGAGE LEARNING - CONSIGNMENT
EBK ELECTRICAL WIRING RESIDENTIAL
Electrical Engineering
ISBN:9781337516549
Author:Simmons
Publisher:CENGAGE LEARNING - CONSIGNMENT
How Thermistors Work - The Learning Circuit; Author: element14 presents;https://www.youtube.com/watch?v=g683mTSZ2i0;License: Standard Youtube License