A potato chip is a delicate thing Fragile A pound of pressure will crush it So when you’re making potato chips you need to have a system If you aren't careful instead of potato chips, you’ll end up with potato chip crumbs.
The Jays company in Chicago was a producer of a variety of snack products one of which was potato chips The company is now owned by Snyders. Nonetheless there is much to be learned from a description of Jay’s operations.
To avoid the tendency of potato chips to crush into crumbs Jays used a system of conveyor belts, radial filling chutes and gently vibrating slides where masses of chips a yard deep were gently moved through the process.
The process started with the arrival of semi-trailers full of potatoes usually about a dozen a day.
The potatoes were separated into big and small sizes big potatoes for big chips that go into large bags and small potatoes for small chips for lunch-size bags.
Computers keep track of everything, shunting potatoes to 15 000-pound holding bins Each bin feeds into a pipe containing a turning screw—a version of the ancient Archimedes screw used to pump water-that moves the potatoes from the bin to conveyor belts, to where they are washed and skinned—the skin scrubbed off by metal bristle brushes.
No machine can detect if a potato is rotten inside So a pair of human inspectors gave the potatoes a quick squeeze as they moved along a conveyor and removed those likely to have rot.
The cleaned potatoes were sent into high-speed chippers—spinning brass rings, each with eight blades inside straight blades for straight chips, ripple blades for ripple chips.
The blades cut the potatoes but cutting dulled the blades so every three hours the line had to be stopped so that the blades could be replaced.
The raw chips spent three minutes cooking in hot com oil, when was constantly circulated and filtered Then they were salted and any flavorings such as barbecue were added.
After the chips were fried, there was another quality check, in which workers removed burned and deformed chips out of the masses passing by.
The chips also were laser-inspected Chips with dark spots or holes were removed by a puff of air that knocked them off the line into a discard bin.
The discards-about 3 percent of production-were gathered up and used Starch was drawn out and sold to cornstarch makers, the rest went to hog feed.
Getting the chips in the bags was another challenge. You can't just fill up bags and seal them, the chips would be smashed. Rather, a conveyor poured chips-gently-onto the central hub of a large, wheel-like device, where the chips scattered into 15 buckets that were essentially scales A computer monitored the weight of each bucket to assure there would be just the right amount to fill a 14-ounce bag The bags were packed into boxes that read 'HANDLE LIKE EGGS.’
While not exactly perishable, potato chips do have a shelf life of about eight weeks only one day of which is spent at the plant.
What characteristics of potato chips concern Jays in terms of quality?

Want to see the full answer?
Check out a sample textbook solution
Chapter 10 Solutions
OPERATIONS MANAGEMENT(LL)-W/CONNECT
- Employee In-Service Training ASSIGNMENT: In-Service Training. The intern is required to plan and implement two in-service training sessions for employees. Each in-service should last at least 10 but not more than 30 minutes and should be given to all employees affected. The preceptor or supervisor/unit manager must approve all in-service topics. 1) One presentation should be related to a policy or procedure of any kind (e.g. proper use of equipment); 2) The second presentation must be related to sanitation or safety. For each in-service presentation, the intern must develop a written class plan and a visual aid (may be a handout, poster, PowerPoint slide presentation, etc.) appropriate to the life experiences, cultural diversity and educational background of the target audience. The intern must also measure behavior change. Note, this cannot be measured by a written pre- and post- test. That would be measuring knowledge. The intern mustactually observe and document that the learners…arrow_forwardFor a dietary manager in a nursing home to train a dietary aidearrow_forwardDietary Management in a Nursing Home. As detailed as possible.arrow_forward
- For dietary management in a nursing home. As detailed as possible.arrow_forwardA small furniture manufacturer produces tables and chairs. Each product must go through three stages of the manufacturing process – assembly, finishing, and inspection. Each table requires 3 hours of assembly, 2 hours of finishing, and 1 hour of inspection. The profit per table is $120 while the profit per chair is $80. Currently, each week there are 200 hours of assembly time available, 180 hours of finishing time, and 40 hours of inspection time. Linear programming is to be used to develop a production schedule. Define the variables as follows: T = number of tables produced each week C= number of chairs produced each week According to the above information, what would the objective function be? (a) Maximize T+C (b) Maximize 120T + 80C (c) Maximize 200T+200C (d) Minimize 6T+5C (e) none of the above According to the information provided in Question 17, which of the following would be a necessary constraint in the problem? (a) T+C ≤ 40 (b) T+C ≤ 200 (c) T+C ≤ 180 (d) 120T+80C ≥ 1000…arrow_forwardAs much detail as possible. Dietary Management- Nursing Home Don't add any fill-in-the-blanksarrow_forward
- Menu Planning Instructions Use the following questions and points as a guide to completing this assignment. The report should be typed. Give a copy to the facility preceptor. Submit a copy in your Foodservice System Management weekly submission. 1. Are there any federal regulations and state statutes or rules with which they must comply? Ask preceptor about regulations that could prescribe a certain amount of food that must be kept on hand for emergencies, etc. Is the facility accredited by any agency such as Joint Commission? 2. Describe the kind of menu the facility uses (may include standard select menu, menu specific to station, non-select, select, room service, etc.) 3. What type of foodservice does the facility have? This could be various stations to choose from, self-serve, 4. conventional, cook-chill, assembly-serve, etc. Are there things about the facility or system that place a constraint on the menu to be served? Consider how patients/guests are served (e.g. do they serve…arrow_forwardWork with the chef and/or production manager to identify a menu item (or potential menu item) for which a standardized recipe is needed. Record the recipe with which you started and expand it to meet the number of servings required by the facility. Develop an evaluation rubric. Conduct an evaluation of the product. There should be three or more people evaluating the product for quality. Write a brief report of this activity • Product chosen and the reason why it was selected When and where the facility could use the product The standardized recipe sheet or card 。 o Use the facility's format or Design one of your own using a form of your choice; be sure to include the required elements • • Recipe title Yield and portion size Cooking time and temperature Ingredients and quantities Specify AP or EP Procedures (direction)arrow_forwardASSIGNMENT: Inventory, Answer the following questions 1. How does the facility survey inventory? 2. Is there a perpetual system in place? 3. How often do they do a physical inventory? 4. Participate in taking inventory. 5. Which type of stock system does the facility use? A. Minimum stock- includes a safety factor for replenishing stock B. Maximum stock- equal to a safety stock plus estimated usage (past usage and forecasts) C. Mini-max-stock allowed to deplete to a safety level before a new order is submitted to bring up inventory up to max again D. Par stock-stock brought up to the par level each time an order is placed regardless of the amount on hand at the time of order E. Other-(describe) Choose an appropriate product and determine how much of an item should be ordered. Remember the formula is: Demand during lead time + safety stock = amount to order Cost out an inventory according to data supplied. Remember that to do this, you will need to take an inventory, and will need to…arrow_forward
- MarketingMarketingISBN:9780357033791Author:Pride, William MPublisher:South Western Educational PublishingContemporary MarketingMarketingISBN:9780357033777Author:Louis E. Boone, David L. KurtzPublisher:Cengage Learning
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningManagement, Loose-Leaf VersionManagementISBN:9781305969308Author:Richard L. DaftPublisher:South-Western College PubPractical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,