Chapter 10, Problem 26P
a)
Summary Introduction
To determine: The capability of the participant.
Introduction:
Process capability index is the measure of the capacity of a process which is the measure of ability of the process to produce the required output within specified limits.
b)
Summary Introduction
To determine: Whether the value of Cpk can exceed the value of Cp.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
As part of an insurance company’s training program, participants learn how to conduct an analysis of clients’ insurability. The goal is to have participants achieve a time in the range of 30 to 45 minutes. Test results for three participants were the following: Armand, a mean of 36.0 minutes and a standard deviation of 3.0 minutes; Jerry, a mean of 34.0 minutes and a standard deviation of 2.0 minutes; and Melissa, a mean of 37.5 minutes and a standard deviation of 1.7 minutes.
a.Compute process capability for the participants and determine whether each is capable. (Do not round intermediate calculations. Round your answers to 2 decimal places.)
Melissa ? Cp what is it
As part of an insurance company’s training program, participants learn how to conduct an analysis of clients’ insurability. The goal is to have participants achieve a time in the range of 30 to 45 minutes. Test results for three participants were the following: Armand, a mean of 36.0 minutes and a standard deviation of 2.0 minutes; Jerry, a mean of 37.0 minutes and a standard deviation of 2.0 minutes; and Melissa, a mean of 37.5 minutes and a standard deviation of 2.6 minutes. a.Compute process capability for the participants and determine whether each is capable, given 4-sigma quality standards. (Do not round intermediate calculations. Round your answers to 2 decimal places.)
As part of an insurance company's training program, participants learn how to conduct an analysis of clients' insurability. The goal is to have participants achieve a time in the range of 30 to 45 minutes. Test results for three participants were: Armand, a mean of 38 minutes and a standard deviation of 3 minutes: Jerry, a mean of 37 minutes and a standard deviation of 2.5 minutes: and Melissa, a mean of 37.5 minutes and a standard deviation of 1.8 minutes.
Which of the participants would you judge to be capable? Explain.
Can the value of the Cp exceed the value of Cp for a given participant? Explain
Chapter 10 Solutions
OPERATIONS MANAGEMENT (LL) W/CONNECT
Ch. 10.2 - Prob. 1.1RQCh. 10.2 - Prob. 1.2RQCh. 10.4 - Prob. 1.1RQCh. 10.4 - Prob. 1.2RQCh. 10 - Prob. 1DRQCh. 10 - Prob. 2DRQCh. 10 - Prob. 3DRQCh. 10 - Prob. 4DRQCh. 10 - Prob. 5DRQCh. 10 - Prob. 6DRQ
Ch. 10 - Prob. 7DRQCh. 10 - Prob. 8DRQCh. 10 - Prob. 9DRQCh. 10 - Prob. 10DRQCh. 10 - Prob. 11DRQCh. 10 - Prob. 12DRQCh. 10 - Prob. 13DRQCh. 10 - Prob. 14DRQCh. 10 - Prob. 15DRQCh. 10 - Prob. 16DRQCh. 10 - Prob. 1TSCh. 10 - Prob. 2TSCh. 10 - Prob. 3TSCh. 10 - Prob. 1CTECh. 10 - Prob. 2CTECh. 10 - Prob. 3CTECh. 10 - Prob. 4CTECh. 10 - Prob. 1PCh. 10 - Prob. 2PCh. 10 - Prob. 3PCh. 10 - Prob. 4PCh. 10 - Prob. 5PCh. 10 - Prob. 6PCh. 10 - Prob. 7PCh. 10 - Prob. 8PCh. 10 - Prob. 9PCh. 10 - Prob. 10PCh. 10 - Prob. 11PCh. 10 - Prob. 12PCh. 10 - Prob. 13PCh. 10 - Prob. 14PCh. 10 - Prob. 15PCh. 10 - Prob. 16PCh. 10 - Prob. 17PCh. 10 - A production process consists of a three-step...Ch. 10 - Prob. 19PCh. 10 - Prob. 20PCh. 10 - Prob. 21PCh. 10 - Prob. 22PCh. 10 - Prob. 23PCh. 10 - Prob. 24PCh. 10 - Prob. 25PCh. 10 - Prob. 26PCh. 10 - Prob. 27PCh. 10 - Prob. 28PCh. 10 - Prob. 29PCh. 10 - Prob. 1.1CQCh. 10 - Prob. 2.1CQCh. 10 - Prob. 2.2CQCh. 10 - Prob. 2.3CQCh. 10 - Prob. 2.4CQ
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- 9arrow_forwardProblem 1: Auto pistons at Wemming Chung’s plant in Shanghai are produced in a forging process, and the diameter is a critical factor that must be controlled. From sample sizes of 10 pistons produced each day, the mean and the range of this diameter have been as follows: Day Mean (mm) Range (mm) 1 156.9 4.2 2 153.2 4.6 3 153.6 4.1 4 155.5 5.0 5 156.6 4.5 a) What are the UCL x (line on top of x, counldn't find the button to do it) and LCL x (line on top of x) , using 3σ? Plot the data. b) What are the UCL R and LCL R , using 3σ? Plot the data. c) Is the Process in Control? (Please screen shot the EXCEl if its in excel) Note:- Do not provide handwritten solution. Maintain accuracy and quality in your answer. Take care of plagiarism. Answer completely. You will get up vote for sure.arrow_forwardXYZ Rural Bank implemented its initial attempts to manage the performances of its 150 employees. XYZ Rural Bank has 10 branches all over Zamboanga Peninsula and each branch is supervised by a branch manager and has 10-15 employees working directly under his supervision. In its initial implementation of its own performance management system, its HR department sent a Performance Appraisal (PA) Template that all branch managers need to fill out. PA tool includes the following aspects of the employees performances:• Attendance (lates, absences, undertime etc)• Successful collection done (for Account Officers, Loan Officers, Credit Investigators)• Loans processed (For Account Officers and Loan Officers) Every July and January, all branch managers should submit the filled-out PA templates to HR for recording and consolidation. One week before the deadline for such PA template to be submitted to HR, the branch managers fill out the templates themselves based on their own observations. These…arrow_forward
- A well-known theoretician at Institution A is called by an experimentalist at Institution B to discuss what appears to be a new discovery, based on a highly original approach to the measurements in question. The discovery supports the theorists highly controversial approach to the problem. However there is a substantial amount of work needed before the results can be submitted for publication. The theorist has been invited to present a seminar at Institution C, where she is a candidate for a position, and where competitors of the experimentalist at Institution B are found. She was not told explicitly that his conversation with the experimentalist at Institution B was privileged.Questions What should she do in preparing for his visit? What are the potential conflicts of interests? What ethical considerations should the theorist consider in preparing her talk? Are there other actions that she could or should take in preparing for the visit? [OR]Suppose you have a strong interest in…arrow_forwardIn hydraulic fracture test, an induced fracture was created at 12.8 MPa. The fracture was reopened in three subsequent cycles. The reopening pressure at third cycle was found to be 6.4 MPa. If the tensile strength of rock is 6.3 MPa, and the pore water pressure is negligible. Determine the maximum and minimum principle stresses if the shut - in pressure was found to be 5.9 MPaarrow_forwardQuality Control of Doughnuts: The Hudson Valley Bakery makes doughnuts that are packaged in boxes with labels stating that there are 12 doughnuts weighing a total of 42 oz. If the variation among the doughnuts is too large, some boxes will be underweight (cheating consumers) and others will be overweight (lowering profit). A consumer would not be happy with a doughnut so small that it can be seen only with an electron microscope, nor would a consumer be happy with a doughnut so large that it resembles a tractor tire. The quality-control supervisor has found that he can stay out of trouble if the doughnuts have a mean of 3.50 oz. and a standard deviation of 0.06 oz. or less. Twelve doughnuts are randomly selected from the production line and weighed, with the result given here (in ounces). 3.43 3.37 3.58 3.50 3.68 3.61 3.42 3.52 3.66 3.50 3.36 3.42 Construct a 95% confidence interval for σ, and then determine whether the quality-control…arrow_forward
- please answer within 30 minutes.arrow_forwardBlueMoon Bottlers has a bottle-filling process with a mean value of 64 ounces and a standard deviation of 8 ounces. Suppose the upper and lower specification limits are 71 and 57 ounces, respectively. What is the process capability index of this process? (Note: You MUST show every single step and detailed derivation for full credit)arrow_forwardSCENARIO A: A woodcutting operation has a target (nominal) value of 200 inches and consistently averages 200.1 inches with a standard deviation of .05 inches. The design engineers have established an upper specification limit of 200.25 and a lower specification limit of 199.75 inches. The process capability ratio, Cp, of the operation is: Group of answer choices a Less than 1 b Greater than or equal to 1 but less than 1.25 c Greater than or equal to 1.25 but less than 1.5 d Greater than or equal to 1.5 but less than 1.75 e Greater than or equal to 1.75 but less than 2 f Greater than or equal to 2arrow_forward
- The Money Pit Mortgage Company is interested in monitoring the performance of the mortgage process. Fifteen samples of five completed mortgage transactions each were taken during a period when the process was believed to be in control. The times to complete the transactions were measured. The means and ranges of the mortgage process transaction times, measured in days, are as follows: Sample Mean Range ew an example 1 2 16 12 7 12 Get more help. 3 6 5 4 5 6 7 8 9 15 10 10 13 14 11 9 10 16 13 16 11 Subsequently, samples of size 5 were taken from the process every week for the next 10 weeks. The times were measured and the following results obtained: D Sample Mean Range 16 9 8 17 12 12 18 19 13 7 7 5 20 15 13 MacBook Pro Click the icon to view the table of factors for calculating three-sigma limits for the x-chart and R-chart. a. Construct the control charts for the mean and the range, using the original 15 samples. Set up the R-chart by specifying the center line and three-sigma control…arrow_forwardWest Battery Corp. has recently been receiving complaints from retailers that its 9-volt batteries are not lasting as long as other name brands. James West, head of the TQM program at West's Austin plant, believes there is no problem because his batteries have had an average life of 60 hours, about 10% longer than competitors' models. To raise the lifetime above this level would require a new level of technology not available to West. Nevertheless, he is concerned enough to set up hourly assembly line checks. Previously, after ensuring that the process was running properly, West took samples of 5 9-volt batteries for 25 test to establish the standards for control chart limits. Those 25 tests are shown in the following table: Sample Data Sample Data Hour Hour Sample Taken 1 Sample Taken 1 2 4 5 R 2 3 4 R 1 60 61 60 59 67 61.4 8 14 62 69 51 62 56 60.0 18 55 57 70 56 46 56.8 24 15 67 53 63 69 70 64.4 17 60 45 58 49 57 53.8 15 16 72 58 51 44 64 57.8 28 66 81 61 51 60 63.8 30 17 49 49 58 68…arrow_forwardWhat is the answer of this question ?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.