Summary Introduction
Case summary:
Person K is the vice-president of operations at Company J, which received a request for quote of supplying 400 units per week. Employee must be permitted to perform the task for 17 times. The actual times observed were given below:
Number | Actual time (minutes) |
1 | 2.05 |
2 | 1.92 |
3 | 2.01 |
4 | 1.89 |
5 | 1.77 |
6 | 1.8 |
7 | 1.86 |
8 | 1.83 |
9 | 1.93 |
10 | 1.96 |
11 | 1.95 |
12 | 2.05 |
13 | 1.79 |
14 | 1.82 |
15 | 1.85 |
16 | 1.85 |
17 | 1.99 |
Performance rating is 115%, fatigue allowance is given as 8%, personal allowance is 6%, and delay allowance is 2%. Workday hour is 7.5 hours and the operators would be paid $12.50 per hour for 8 hours.
To determine: The
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
QUESTION 6
In a burger shop, a sample of 36 days, was taken to study the daily sales, It was found that the mean daily sales are (m) with a standard deviation is (d).
The confidence interval for the population mean is computed, the upper confidence limit is 35, and the lower confidence limit is 18
Calculate the value of m?
(Round answer to two decimal places ex. 2.09)
How big should the sample be for a statistically accurate standard(at, say, the 99.73% confidence level and accuracy of ±5%)?
Question :
A process that is considered to be in control measures an ingredient in ounces. Below are the last ten samples (each of size n=5) taken. The population standard deviation is 1.36.
SAMPLE
1
2
3
4
5
6
7
8
9
10
5
6
9
10
9
10
9
12
8
9
8
9
9
8
12
11
9
9
6
10
6
8
5
7
10
8
10
9
4
12
4
7
3
8
8
6
12
10
4
11
5
4
2
9
8
6
8
6
5
7
Using information from the above table:
Calculate the standard deviation of the sample means, σ×.
Determine the control limits for the mean chart, using A2 and σ× if z=3.
Determine the control limits for the range chart.
Construct mean (using A2) and range control charts by using information from (ii) and (iii).
Comment on your results.
Chapter 10 Solutions
Operations Management
Ch. 10 - Prob. 1DQCh. 10 - Prob. 2DQCh. 10 - Prob. 3DQCh. 10 - Prob. 4DQCh. 10 - Prob. 5DQCh. 10 - Prob. 6DQCh. 10 - Prob. 7DQCh. 10 - Prob. 8DQCh. 10 - Prob. 9DQCh. 10 - Prob. 10DQ
Ch. 10 - Prob. 11DQCh. 10 - Prob. 12DQCh. 10 - Prob. 13DQCh. 10 - Prob. 14DQCh. 10 - Prob. 2PCh. 10 - Draw an activity chart for a machine operator with...Ch. 10 - Prob. 4PCh. 10 - Prob. 5PCh. 10 - Prob. 6PCh. 10 - Prob. 1PCh. 10 - Prob. 7PCh. 10 - Prob. 8PCh. 10 - Prob. 9PCh. 10 - Prob. 10PCh. 10 - Prob. 11PCh. 10 - Prob. 12PCh. 10 - Prob. 13PCh. 10 - Prob. 14PCh. 10 - Prob. 15PCh. 10 - Prob. 16PCh. 10 - Prob. 17PCh. 10 - Prob. 18PCh. 10 - Prob. 19PCh. 10 - Prob. 20PCh. 10 - Prob. 21PCh. 10 - Prob. 22PCh. 10 - Prob. 23PCh. 10 - Prob. 24PCh. 10 - Prob. 25PCh. 10 - Prob. 26PCh. 10 - Prob. 27PCh. 10 - Prob. 28PCh. 10 - Prob. 29PCh. 10 - Prob. 30PCh. 10 - Prob. 31PCh. 10 - Prob. 32PCh. 10 - Prob. 34PCh. 10 - Prob. 35PCh. 10 - Prob. 36PCh. 10 - Prob. 37PCh. 10 - Prob. 33PCh. 10 - Prob. 39PCh. 10 - Prob. 40PCh. 10 - Prob. 41PCh. 10 - Prob. 42PCh. 10 - Prob. 44PCh. 10 - Prob. 1CSCh. 10 - Prob. 2CSCh. 10 - Prob. 3CSCh. 10 - Prob. 4CSCh. 10 - Prob. 2.1VCCh. 10 - Prob. 2.2VCCh. 10 - Prob. 2.3VCCh. 10 - Prob. 2.4VCCh. 10 - Prob. 1.1VCCh. 10 - Prob. 1.2VCCh. 10 - Prob. 1.3VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- QUESTION 3 Archeologists plan to examine a sample of 2-meter square plots near an ancient Greek city for artifacts visible in the ground. They choose a certain number of separate samples of plots from floodplain, coast, foothills, and high hills. What kind of sampling strategy is this? a. A cluster random sample b. A simple random sample, SRS C. A systematic random sample d. A stratified random sample Click Save and Submit to save and submit. Click Save All Answers to save all answers. Save All Answe OCT 19 étvarrow_forwardsubject : quality control topic: six sigma The increased global manufacturing competition forces many organizations to adapt quality tools and techniques in order to survive in the modern marketplace. Find and choose a real case study of the organization of your own choice (such as healthcare, IT-industry, automobile, chemical etc.) and critically analyzed how these organization reduced their product defects and reduced cost using six sigma methodology.arrow_forwardQuestion 6 Julie is determining which waterproofing treatment is better. For 30 subjects she randomly treats half of their rain jacket with one treatment and the other side with the second treatment. She then has them use the rain jacket for three months and at the end of that time compares the waterproofing of each side. Select the correct type of study described in the scenario above. Your answer: O Experimental Study o Observational Studyarrow_forward
- Please use the following information to answer the following questions Alpha=0.05, Beta=D0.01, LTPD=0.3 , AQL=0.05 Question 8. What is the cut off point? 66arrow_forwardQUESTION 2 South Africa Airways would like to monitor its airline's performance. Each week for the past 20 weeks, they checked each week a random sample of 100 flight arrivals for "one-time" performance. The table that follows contains the number of flights that did not meet South Africa Airways definition of "one time": Week Late flights 10 9 11 39103422822 10 11 12 13 14 15 16 17 18 19 20 19 2.1 Which control chart is appropriate to analyze the above data? Justify your answer. 2.2 Calculate the upper and lower control limits for this chart @ 99.73% confidence level. 2.3 Draw the chart and interpret it. (3) (10) (9) QUESTION 3 Two machines are currently in use in a process at a local manufacturing plant. The standards for this process are LSL 400 and USL .403. Machine One is currently producing with mean .401 and a standard deviation 0004. Machine Two is currently producing with mean = 4015 and a standard deviation = .0005. 3.1 Which of the…arrow_forwardQuestion in photos #8arrow_forward
- Please do fast ASAParrow_forwardQUESTION 1 My Happy Feet Company manufactures athletic shoes. The company wants to establish a p chart to monitor the production process using Z=3.00. The company has taken a sample of 50 shoes every 4 hours for a work week of five days. Since the company runs two 8-hour shifts each day, this will result in 20 samples. The sample results are as follows. Sample 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Number of Defectives 0 1 0 3 2 5 3 2 1 0 4 1 1 2 2 3 4 1 5 2 23.00 Answer these questions: a. Construct a p-chart to monitor this process. b. Plot the p-chart graph. c. indicate if the process was out of control at any timearrow_forwardsubject: quality control What evidence is there that Six Sigma has been implemented in how many organizations in the world?arrow_forward
- QUESTION 6 A Taguchi loss determination: A component has a target dimension value of 50 mm. It is considered a complete loss of $23 if the deviation exceeds +/- 1.5 mm. Determine the loss if a component measures 20.2 mm. Round your answer to the nearest penny, if applicable. QUESTION 7 A business process has the following parameters: Process mean: 90 Upper Specification Limit 100 Lower Specification Limit 80 Process Standard Deviation: 3.25 Determine the process Capability Ratio Round your answer to 3 decimal places, if applicable.arrow_forward10:27 Bb M QUESTION 2 Consider a one-item survey as follows: Using a scale of 1 – 5 in which 1 = Not as well as I hoped, 2 = Pretty well, 3 = Well, 4 = Very well, and 5 = Crushing it, please indicate how well you are doing so far in your MBA 503 course. 1[] 2[] What type of data does this survey generate? Choose all that apply. 3[] 4[] 5[ ] O Continuous O Ratio Time series O Exponential O Binomial O Interval O Biased O Intersection Union O Hypergeometric O Ordinal O None of the above QUESTION 3 If you have a data set of n items, the data are continuous variables, the data set is unimodal, and the data set is too skewed to use the normal distribution, which probability distribution should you use to calculate probabilities? O Discrete uniform distribution Binomial distribution O Poisson distribution Hypergeometric distribution O Geometric distribution O Uniform continuous distribution O Standard normal distribution O Exponential distribution O Triangular distribution O None of the above…arrow_forwardQuestion 1 This Test: 60 pts possible Submit Test Daily high temperatures in St. Louis for the last week were as follows: 92, 92, 94, 94, 95, 88, 95 (yesterday). a) The high temperature for today using a 3-day moving average = degrees (round your response to one decimal place). b) The high temperature for today using a 2-day moving average = degrees (round your response to one decimal place). c) The mean absolute deviation based on a 2-day moving average = degrees (round your response to one decimal place). %3D d) The mean squared error for the 2-day moving average = degrees (round your response to one decimal place). e) The mean absolute percent error (MAPE) for the 2-day moving average = % (round your response to one decimal place).arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.