Question
Book Icon
Chapter 10, Problem 16P

a)

Summary Introduction

To determine: To find the average time for the operation

Introduction: Time study is the basis that helps to set the standard time; it would time a sample of the performance of the worker.

b)

Summary Introduction

To determine: Thenormal time for the operation

Introduction: Time study is the basis that helps to set the standard time; it would time a sample of the performance of the worker.

c)

Summary Introduction

To determine: To find the standard time for the operation

Introduction: Time study is the basis that helps to set the standard time; it would time a sample of the performance of the worker.

Blurred answer
Students have asked these similar questions
5. The manager of Asombrado Bounty Office, Charles Badillo, estimates his employees are idle 25%of the time. With that problem, how many work samples are needed to consider within 3%accuracy and have 95.45% confidence level. 6. At ASP Micro Manufacturing, Inc. workers press semiconductor into predrilled slots on printed-circuit boards. Determine the normal time of the operation in seconds. The elemental motions for normal time used by the company are as follows:• Reach 6 inches for semiconductors 10.5 TMU• Grasp the semiconductors 8.0 TMU• Move semiconductor to printed-circuit board 9.5 TMU• Position semiconductor 20.1 TMU• Press semiconductor into slots 20.3 TMU• Move board aside 15.8 TMU 7. The semiconductor used in Costin Calculator has 5 components with the consistency of 90%, 95%,98%, 90%, and 99%, respectively. How reliable is one product of calculator?
How many work cycles should be timed to estimate the average cycle time to within 2 percent ofthe sample mean with a confidence of 99 percent if a pilot study yielded these times (minutes):5.2, 5.5, 5.8, 5.3, 5.5, and 5.1? The standard deviation is .253 minutes per cycle.
The snapback timing method was used to obtain the average times and performance ratings for work elements in a manual repetitive task. (See table below). All elements are worker-controlled and were performance rated at 80%. Element e is an irregular element performed every five cycles. A 15% allowance for personal time, fatigue, and delays isapplied to the cycle. Determine (a) the normal time and (b) the standard time for this cycle. If the worker’s performance during actual production is 120% on all manual elements for 7 actual hours worked on an 8-hour shift, (c) how many units will be produced
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Text book image
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Text book image
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Text book image
Business in Action
Operations Management
ISBN:9780135198100
Author:BOVEE
Publisher:PEARSON CO
Text book image
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Text book image
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.