Operations Management
13th Edition
ISBN: 9780135173626
Author: HEIZER, Jay, RENDER, Barry, Munson, Chuck
Publisher: Pearson,
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 10, Problem 31P
Summary Introduction
To determine: The
Introduction: Sample size is required to determine the number of observations that are necessary to find the true cycle time.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
6
13-2. (Pareto Chart & Fishbone Diagram). Smith, Schroeder, and Torn (SST) is a short-haul household furniture moving company. SST"s labor force, selected from the
local community college football team, is temporary and part-time. SST is concerned with recent complaints, as tabulated on the following tally sheet.
Complaint
Broken glass
Delivered to wrong address
Furniture rubbed together while on truck
Late delivery
Late arrival for pickup
/////
///
/////
/////
//
///// /////
Missing items
Nicks and scratches from rough handling /////
Soiled Upholstery
///// /////
Tally
///// /
///
/////
I
//
///// ///// ///// ///
a. Use a Pareto chart to identify the "few vital" complaint problems.
b. Use a cause-and-effect diagram to identify potential causes of the complaints
erations Management Spring21
Time left 1:09:19
stion
In a fabric manufacturing factory, the quality control process using control charts from SPC. In an hour there are a total of 5 samples are taken
each having 5 observations regarding the thickness of fabric in measured in millimeters. In a particular hour, the sample means (X-bar) are noted to
be: 156.46, 199.62, 189.31, 102.22, and112.09 respectively. In the same sample, the corresponding ranges are: 11.97, 12.17, 13.94, 11.86, and
11.83 respectively. What are the lower and upper control limits for the X-bar chart?
et
ered
ed out of
O a.
None is correct
lag
O b.
156.55, 170.47
tion
O C.
144.77, 159.11
O d. 145.40, 190.72
O e. 143.55, 165.47
Of.
142.92, 160.66
Fi
PREVIOUS PAGE
NEXT PAGE
O Type here to search
%23
Chapter 10 Solutions
Operations Management
Ch. 10 - Prob. 1DQCh. 10 - Prob. 2DQCh. 10 - Prob. 3DQCh. 10 - Prob. 4DQCh. 10 - Prob. 5DQCh. 10 - Prob. 6DQCh. 10 - Prob. 7DQCh. 10 - Prob. 8DQCh. 10 - Prob. 9DQCh. 10 - Prob. 10DQ
Ch. 10 - Prob. 11DQCh. 10 - Prob. 12DQCh. 10 - Prob. 13DQCh. 10 - Prob. 14DQCh. 10 - Prob. 2PCh. 10 - Draw an activity chart for a machine operator with...Ch. 10 - Prob. 4PCh. 10 - Prob. 5PCh. 10 - Prob. 6PCh. 10 - Prob. 1PCh. 10 - Prob. 7PCh. 10 - Prob. 8PCh. 10 - Prob. 9PCh. 10 - Prob. 10PCh. 10 - Prob. 11PCh. 10 - Prob. 12PCh. 10 - Prob. 13PCh. 10 - Prob. 14PCh. 10 - Prob. 15PCh. 10 - Prob. 16PCh. 10 - Prob. 17PCh. 10 - Prob. 18PCh. 10 - Prob. 19PCh. 10 - Prob. 20PCh. 10 - Prob. 21PCh. 10 - Prob. 22PCh. 10 - Prob. 23PCh. 10 - Prob. 24PCh. 10 - Prob. 25PCh. 10 - Prob. 26PCh. 10 - Prob. 27PCh. 10 - Prob. 28PCh. 10 - Prob. 29PCh. 10 - Prob. 30PCh. 10 - Prob. 31PCh. 10 - Prob. 32PCh. 10 - Prob. 34PCh. 10 - Prob. 35PCh. 10 - Prob. 36PCh. 10 - Prob. 37PCh. 10 - Prob. 33PCh. 10 - Prob. 39PCh. 10 - Prob. 40PCh. 10 - Prob. 41PCh. 10 - Prob. 42PCh. 10 - Prob. 44PCh. 10 - Prob. 1CSCh. 10 - Prob. 2CSCh. 10 - Prob. 3CSCh. 10 - Prob. 4CSCh. 10 - Prob. 2.1VCCh. 10 - Prob. 2.2VCCh. 10 - Prob. 2.3VCCh. 10 - Prob. 2.4VCCh. 10 - Prob. 1.1VCCh. 10 - Prob. 1.2VCCh. 10 - Prob. 1.3VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- 5. The manager of Asombrado Bounty Office, Charles Badillo, estimates his employees are idle 25%of the time. With that problem, how many work samples are needed to consider within 3%accuracy and have 95.45% confidence level. 6. At ASP Micro Manufacturing, Inc. workers press semiconductor into predrilled slots on printed-circuit boards. Determine the normal time of the operation in seconds. The elemental motions for normal time used by the company are as follows:• Reach 6 inches for semiconductors 10.5 TMU• Grasp the semiconductors 8.0 TMU• Move semiconductor to printed-circuit board 9.5 TMU• Position semiconductor 20.1 TMU• Press semiconductor into slots 20.3 TMU• Move board aside 15.8 TMU 7. The semiconductor used in Costin Calculator has 5 components with the consistency of 90%, 95%,98%, 90%, and 99%, respectively. How reliable is one product of calculator?arrow_forwardWhat is the answer of this question ?arrow_forwardBank manager Art Hill wants to determine the percentageof time that tellers are working and idle. He decides touse work sampling, and his initia l estimate is that the tellers a reid le 15% of the time. How many observations should Hill take tobe 95.45% confident that the results wi ll not be more than ± 4%from the true result?arrow_forward
- Claudine Soosay recorded the following times assembling a watch: Observation No. 1 2 3 4 5 6 7 8 Performance rating is given as 95%. a) The average time of Claudine for the operation = Time (minutes) 0.11 0.09 0.11 0.09 0.15 0.10 0.09 0.10 Observation No. 9 10 11 12 13 14 15 16 minutes (round your response to three decimal places). Time (minutes) 0.11 0.09 0.11 0.10 0.11 0.12 0.14 0.10arrow_forwardAn analyst has been asked to prepare an estimate of the proportion of time that a turret lathe operator spends adjusting the machine, with 90% confidence level. Based on previous experience, the analyst believes the proportion will be approximately 30%. a. If the analyst uses sample size of 400 observations, what is the maximum error that will be associated with the estimate? b. What sample size would the analyst need in order to have the maximum error be no more than +/- 5%?arrow_forward1arrow_forward
- K Claudine Soosay recorded the following times assembling a watch: Observation No. 1234567co 8 Time (minutes) 0.12 0.10 0.11 0.11 0.15 0.10 0.10 0.10 Observation No. 9 10 11 12 13 14 15 16 Time (minutes) 0.11 0.08 0.11 0.10 0.10 0.11 0.14 0.08arrow_forwardQuestion 3 A coffee producer wishes to produce new 50-gram pack for people who like to bring their own coffee when they travel. The producer asked your help to monitor the quality of the process by setting up the appropriate control charts. Based on the data shown in the table, is the process in control? Sample 2 3 4 5 6 7 8 9 2 3 4 Values for A2, D3 and D4 Sample Size n 10 1 54.5 50.6 51.1 52.7 51.7 5 6 7 8 9 10 11 51.1 54.0 53.2 51.9 A2 D3 1.88 0 1.02 0 0.73 0 0.58 0 0.48 0 0.42 0.08 0.37 0.14 0.34 0.18 0.31 0.22 0.29 0.26 12 0.27 0.28 Show all your workings clearly. 2 54.3 53.5 54.3 52.1 51.2 Observation 51.5 52.3 50.4 50.2 D4 3.27 2.57 2.28 2.11 2.00 1.92 1.86 1.82 1.78 1.74 1.72 3 53.8 53.2 50.4 51.3 54.7 54.7 54.7 53.4 50.2 4 50.4 54.9 50.7 51.0 54.3 50.4 51.4 51.4 52.9arrow_forward20. A teller at a drive-up window at a bank had the following service times (in minutes) for 20 randomly Chapter Ten Quality Control selected customers. SAMPLE 1 4. 4.5 4.6 4.5 4.7 4.2 4.5 4.6 4.6 4.2 4.4 4.4 4.8 4.3 4.7 4.4 4.5 4.3 4.3 4.6 4.9 a. Determine the mean of each sample. b. If the process parameters are unknown, estimate its mean and standard deviation. c. Estimate the mean and standard deviation of the sampling distribution. d. What would three-sigma control limits for the process be? What alpha risk would they provide? e. What alpha risk would control limits of 4.14 and 4.86 provide? f. Using limits of 4.14 and 4.86, are any sample means beyond the control limits? If so, which one(s)? g. Construct control limits? If so, which one(s)? ontrol charts for means and ranges using Table 10.3. Are any samples beyond the h. Explain why the control limits are different for means in parts d and g. i. If the process has a known mean of 4.4 and a known standard deviation of .18, what…arrow_forward
- Questionnaire design and questions to be asked in thesis " Evaluating the anti-money laundering mechanism in the banking sector from a customer's perspective".arrow_forward8. A teller at a drive-up window at a bank had the following service times (in minutes) for 20 randomly selected customers: SAMPLE 1 2 3 4 4.5 4.6 4.5 4.7 4.2 4.5 4.6 4.6 4.2 4.4 4.4 4.8 4.3 4.7 4.4 4.5 4.3 4.3 4.6 4.9 Select a chart to monitor the central tendency of the process, what are the 3-sigma control limits using a mean chart? Keep 3 decimal places. Select one: a. LCL = 4.212, UCL = 4.788 b. LCL = 4.414, UCL = 4.586 c. LCL = 4.245, UCL = 4.755 d. None of the other options. e. LCL = 4.385, UCL = 4.615arrow_forwardA time study has revealed an average observed timeof 5 minutes, with a standard deviation of 1.25 minu tes. Thesefigures are based on a sample of 75 cycles. Is this sample largeenough for analyst Anand Paul to be 99.73% confident that thestandard time is within 5% of the true value?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.