Traffic flow on a four-lane (one direction) freeway can be described by the Greenshields model. Two lanes of the four lanes on a section of this freeway will have to be closed to undertake an emergency bridge repair that is expected to take 2 hr. The mean free speed of the highway is 60 mi/h and the jam density is 140 veh/mi/ln. If it is estimated that the demand flow on the highway during the emergency repairs is 80% of the capacity, using the deterministic approach, determine: (a) The maximum queue length that will be formed (b) The total delay(c) The number of vehicles that will be affected by the incident(d) The average individual delay
Traffic flow on a four-lane (one direction) freeway can be described by the Greenshields model. Two lanes of the four lanes on a section of this freeway will have to be closed to undertake an emergency bridge repair that is expected to take 2 hr. The mean free speed of the highway is 60 mi/h and the jam density is 140 veh/mi/ln. If it is estimated that the demand flow on the highway during the emergency repairs is 80% of the capacity, using the deterministic approach, determine: (a) The maximum queue length that will be formed (b) The total delay(c) The number of vehicles that will be affected by the incident(d) The average individual delay
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
Traffic flow on a four-lane (one direction) freeway can be described by the Greenshields model. Two lanes of the four lanes on a section of this freeway will have to be closed to undertake an emergency bridge repair that is expected to take 2 hr. The mean free speed of the highway is 60 mi/h and the jam density is 140 veh/mi/ln. If it is estimated that the demand flow on the highway during the emergency repairs is 80% of the capacity, using the deterministic approach, determine: (a) The maximum queue length that will be formed (b) The total delay(c) The number of vehicles that will be affected by the incident(d) The average individual delay
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Step 1:The highway capacity will be:
VIEWStep 2:Calculations:
VIEWStep 3:The reduce capacity and demand volume of the highway:
VIEWStep 4:(a) The maximum queue length that will be formed:
VIEWStep 5: (b) The total delay
VIEWStep 6:(c) The number of vehicles that will be affected by the incident
VIEWStep 7:(d) The average individual delay
VIEWTrending now
This is a popular solution!
Step by step
Solved in 7 steps
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
![Structural Analysis](https://compass-isbn-assets.s3.amazonaws.com/isbn_cover_images/9781337630931/9781337630931_smallCoverImage.jpg)
![Structural Analysis (10th Edition)](https://www.bartleby.com/isbn_cover_images/9780134610672/9780134610672_smallCoverImage.gif)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
![Structural Analysis](https://compass-isbn-assets.s3.amazonaws.com/isbn_cover_images/9781337630931/9781337630931_smallCoverImage.jpg)
![Structural Analysis (10th Edition)](https://www.bartleby.com/isbn_cover_images/9780134610672/9780134610672_smallCoverImage.gif)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
![Fundamentals of Structural Analysis](https://www.bartleby.com/isbn_cover_images/9780073398006/9780073398006_smallCoverImage.gif)
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
![Sustainable Energy](https://www.bartleby.com/isbn_cover_images/9781337551663/9781337551663_smallCoverImage.gif)
![Traffic and Highway Engineering](https://www.bartleby.com/isbn_cover_images/9781305156241/9781305156241_smallCoverImage.jpg)
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning