Problem 2. Consider a freeway section with three lanes in each direction and with a length of 1.25mi (2km) and a +5% grade. In this freeway, the directional peak-hour volume is 3,800 veh/h, from which 76 are trucks and 152 are transit buses. The maximum 15-min volume within the hour of analysis is 1,055 vehicles. The lane widths are 12 ft (3.6m), and shoulder widths are 10 ft (3.1m). There are 2 exit ramps and 1 entrance ramp in the 3 miles in the upstream section and 1 exit ramp and 2 entrance ramp in the 3 miles in the downstream section (consider the same ramp density if using international (km) units). All transit buses will be removed from traffic since the transit service will be replaced by a commuter rail service. However, by removing buses, new additional passage car demand is expected. It is estimated that for each removed bus, 7 new passenger cars will be added to the original traffic volume of 3,800 veh/h. Question: Determine the change in speed and traffic density before and after the bus removal.
Problem 2. Consider a freeway section with three lanes in each direction and with a length of 1.25mi (2km) and a +5% grade. In this freeway, the directional peak-hour volume is 3,800 veh/h, from which 76 are trucks and 152 are transit buses. The maximum 15-min volume within the hour of analysis is 1,055 vehicles. The lane widths are 12 ft (3.6m), and shoulder widths are 10 ft (3.1m). There are 2 exit ramps and 1 entrance ramp in the 3 miles in the upstream section and 1 exit ramp and 2 entrance ramp in the 3 miles in the downstream section (consider the same ramp density if using international (km) units). All transit buses will be removed from traffic since the transit service will be replaced by a commuter rail service. However, by removing buses, new additional passage car demand is expected. It is estimated that for each removed bus, 7 new passenger cars will be added to the original traffic volume of 3,800 veh/h. Question: Determine the change in speed and traffic density before and after the bus removal.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question

Transcribed Image Text:Problem 2. Consider a freeway section with three lanes in each direction and with a length of
1.25mi (2km) and a +5% grade. In this freeway, the directional peak-hour volume is 3,800 veh/h,
from which 76 are trucks and 152 are transit buses. The maximum 15-min volume within the
hour of analysis is 1,055 vehicles. The lane widths are 12 ft (3.6m), and shoulder widths are 10 ft
(3.1m). There are 2 exit ramps and 1 entrance ramp in the 3 miles in the upstream section and 1
exit ramp and 2 entrance ramp in the 3 miles in the downstream section (consider the same ramp
density if using international (km) units). All transit buses will be removed from traffic since the
transit service will be replaced by a commuter rail service. However, by removing buses, new
additional passage car demand is expected. It is estimated that for each removed bus, 7 new
passenger cars will be added to the original traffic volume of 3,800 veh/h.
Question: Determine the change in speed and traffic density before and after the bus removal.
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 4 steps

Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning

Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education


Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning