Required information Lakeside Incorporated manufactures four lines of remote control boats and uses activity-based costing to calculate product cost. Activity Pools Machining Setup Quality control Estimated Total Cost Estimated Cost Driver $ 679,400 21,500 machine hours 105,950 520 batches 164,900 970 inspections

FINANCIAL ACCOUNTING
10th Edition
ISBN:9781259964947
Author:Libby
Publisher:Libby
Chapter1: Financial Statements And Business Decisions
Section: Chapter Questions
Problem 1Q
icon
Related questions
icon
Concept explainers
Topic Video
Question
### Required Information

Lakeside Incorporated manufactures four lines of remote control boats and uses activity-based costing to calculate product cost.

#### Activity Pools

| Activity      | Estimated Total Cost | Estimated Cost Driver   |
|---------------|----------------------|-------------------------|
| Machining     | $679,400             | 21,500 machine hours    |
| Setup         | $105,950             | 520 batches             |
| Quality control | $164,900           | 970 inspections         |

### Required

Suppose the Speedy boat requires 2,840 machine hours, 100 batches, and 300 inspections. Using the activity rates, determine the amount of overhead assigned to the Speedy product line.

**Note:** Do not round your intermediate calculations and round your final answers to the nearest dollar amount.

#### Cost Pool Table

| Cost Pool           | Allocated Overhead |
|---------------------|--------------------|
| Machining           |                    |
| Setup               |                    |
| Quality Control     |                    |
| **Total Overhead**  |                    |

### Instructions for Completion

To calculate the allocated overhead for each activity pool, follow these steps:

1. **Calculate Activity Rates:**
   - **Machining Rate:** Divide the estimated total cost by the estimated cost driver for machining.
   - **Setup Rate:** Divide the estimated total cost by the estimated cost driver for setup.
   - **Quality Control Rate:** Divide the estimated total cost by the estimated cost driver for quality control.

2. **Allocate Overhead:**
   - Multiply the activity rate by the actual activity driver usage for the Speedy boat:
     - **Machining:** 2,840 machine hours
     - **Setup:** 100 batches
     - **Quality Control:** 300 inspections

3. **Sum Allocated Overhead:**
   - Add the allocated overhead for each activity to determine the total overhead for the Speedy product line.
Transcribed Image Text:### Required Information Lakeside Incorporated manufactures four lines of remote control boats and uses activity-based costing to calculate product cost. #### Activity Pools | Activity | Estimated Total Cost | Estimated Cost Driver | |---------------|----------------------|-------------------------| | Machining | $679,400 | 21,500 machine hours | | Setup | $105,950 | 520 batches | | Quality control | $164,900 | 970 inspections | ### Required Suppose the Speedy boat requires 2,840 machine hours, 100 batches, and 300 inspections. Using the activity rates, determine the amount of overhead assigned to the Speedy product line. **Note:** Do not round your intermediate calculations and round your final answers to the nearest dollar amount. #### Cost Pool Table | Cost Pool | Allocated Overhead | |---------------------|--------------------| | Machining | | | Setup | | | Quality Control | | | **Total Overhead** | | ### Instructions for Completion To calculate the allocated overhead for each activity pool, follow these steps: 1. **Calculate Activity Rates:** - **Machining Rate:** Divide the estimated total cost by the estimated cost driver for machining. - **Setup Rate:** Divide the estimated total cost by the estimated cost driver for setup. - **Quality Control Rate:** Divide the estimated total cost by the estimated cost driver for quality control. 2. **Allocate Overhead:** - Multiply the activity rate by the actual activity driver usage for the Speedy boat: - **Machining:** 2,840 machine hours - **Setup:** 100 batches - **Quality Control:** 300 inspections 3. **Sum Allocated Overhead:** - Add the allocated overhead for each activity to determine the total overhead for the Speedy product line.
Expert Solution
Step 1

Lets understand the basics.

Activity rate is a rate using which overhead gets allocated to the product. 

Activity rate = Total overhead for activity/Total of activity driver 

steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Costing Systems
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
FINANCIAL ACCOUNTING
FINANCIAL ACCOUNTING
Accounting
ISBN:
9781259964947
Author:
Libby
Publisher:
MCG
Accounting
Accounting
Accounting
ISBN:
9781337272094
Author:
WARREN, Carl S., Reeve, James M., Duchac, Jonathan E.
Publisher:
Cengage Learning,
Accounting Information Systems
Accounting Information Systems
Accounting
ISBN:
9781337619202
Author:
Hall, James A.
Publisher:
Cengage Learning,
Horngren's Cost Accounting: A Managerial Emphasis…
Horngren's Cost Accounting: A Managerial Emphasis…
Accounting
ISBN:
9780134475585
Author:
Srikant M. Datar, Madhav V. Rajan
Publisher:
PEARSON
Intermediate Accounting
Intermediate Accounting
Accounting
ISBN:
9781259722660
Author:
J. David Spiceland, Mark W. Nelson, Wayne M Thomas
Publisher:
McGraw-Hill Education
Financial and Managerial Accounting
Financial and Managerial Accounting
Accounting
ISBN:
9781259726705
Author:
John J Wild, Ken W. Shaw, Barbara Chiappetta Fundamental Accounting Principles
Publisher:
McGraw-Hill Education