Gable co uses 3 activity pools: Activity Pools total cost of pools cost driver estimated cost driver Machining 208,960 number of machine hours 65,300 designing costs 53,125 number of design hours 6,250 setup costs 68,400 number of batches 480 Gable co manufactures 3 products, manufactured are ,A,B,C: Product A Product B Product C Number of Machine hours 23,000 33,000 9,300 Number of design hours 2,500 1,450 2,300 Number of batches 40 170 270 Using Activity rates, determine Total overhead assigned for Product A,B,C ? 208,960/65,300=3.2 53,125/6,250=8.5 68,400/480=142.5 is this correct so far?
Gable co uses 3 activity pools:
Activity Pools total cost of pools cost driver estimated cost driver
Machining 208,960 number of machine hours 65,300
designing costs 53,125 number of design hours 6,250
setup costs 68,400 number of batches 480
Gable co manufactures 3 products, manufactured are ,A,B,C:
Product A Product B Product C
Number of Machine hours 23,000 33,000 9,300
Number of design hours 2,500 1,450 2,300
Number of batches 40 170 270
Using Activity rates, determine Total
208,960/65,300=3.2 53,125/6,250=8.5 68,400/480=142.5
is this correct so far?