Molding Materials 30 pounds per door 45 pounds per door 540,000 pounds $3 per pound Selling Price $235 per door $305 per door Finishing Time 3 hours per door 4 hours per door Masoline Aldernite Materials/Labor Available 102,000 hours Cost of materials and labor $15 per hour The following requirements refer only to the preceding data. There is no connection between the requirements. 1. If there were enough demand for either door, which door would DF produce? How many of these doors would it make and sell? Required 2. If DF sells three Masoline for each Aldernite, how many doors of each type would it produce and sell? What would be the total contribution margin? 3. If DF sells three Masoline for each Aldernite, how much would production and contribution margin increase if the molding department could buy 9,000 more pounds of materials for $3 per pound? 4. If DF sells three Masoline for each Aldernite, how much would production and contribution margin increase if the assembly department could get 780 more labor hours at $15 per hour?
Variance Analysis
In layman's terms, variance analysis is an analysis of a difference between planned and actual behavior. Variance analysis is mainly used by the companies to maintain a control over a business. After analyzing differences, companies find the reasons for the variance so that the necessary steps should be taken to correct that variance.
Standard Costing
The standard cost system is the expected cost per unit product manufactured and it helps in estimating the deviations and controlling them as well as fixing the selling price of the product. For example, it helps to plan the cost for the coming year on the various expenses.
Theory of constraints, contribution margin, sensitivity analysis. Damon Furniture (DF) produces fiberglass doors in two processes: molding and finishing. DF is currently producing two models: Masoline and Aldernite. Production in the molding department is limited by the amount of materials available. Production in the finishing department is limited by the amount of trained labor available. The only variable costs are materials in the molding department and labor in the finishing department. Following are the requirements and limitations by model and department:
Trending now
This is a popular solution!
Step by step
Solved in 6 steps with 5 images