If there are 250 working days per year and the company plans to work one seven hours shift per day, then compute the number of machines equired.
Q: A larger capacity cushion can help firms uncover process inefficiencies, so they can find ways to…
A: Firms can absorb changes in supply or demand with greater capacity cushion without facing production…
Q: 1.- Quantity of production volume to be produced considering its SCRAP 2.- Quantity of production…
A: Here, given that for this operation process, we would produce 5000 units final volume per month,…
Q: Use the single-server, multiple-server, and finite-source models to analyze operations and estimate…
A: The single server, multiple servers, and finite source models are part of the waiting line system.…
Q: Q: What is the mean assembly time per product unit for size C in terms of hour?
A: Answer is as below:
Q: Justify why neither approach would work 100% of the time and the benefit of adjusting the server…
A: To be determined: Justify why neither approach would work 100% of the time and the benefit of…
Q: Assuming a workstation where one operator is assigned four machines. Previous work measurement…
A: The machine operated 75 percent of the time unattended.The operator's attention is required at…
Q: Can you think of any method to maximize the machine's output while minimizing its downtime?
A: Productivity and output are related but distinct concepts. Productivity is a measure of efficiency…
Q: The process for renewing a driver's license at the Archer County Courthouse is as follows. First,…
A: A bottleneck refers to a point in a system where the flow or capacity is limited, causing congestion…
Q: A company that produces liquid facial lotion processes 2,375 lbm per hour of the product (ρ = 1.144…
A: lbm - pound mass 1 pound (lb) = 453.59237 milliliter (ml) 1 liter = 1000 ml
Q: Pipes are installed in a process with two resources. The first resource has a capacity of 0.34 pipes…
A: In order to arrive at the capacity of the pipes, first, we need to know the bottleneck. The…
Q: Consider a production process described by the following flowchart, on which the process time of…
A: Given, a production process flowchart.Station Station Station The fixed cost for building the…
Q: Calculate the manufacturing lead time if the average non-operation time is 2 hrs. Calculate the…
A: In manufacturing, lead time refers to the time that it takes to manufacture a product and deliver it…
Q: t takes 5.2 hour to analyze 1 text. Calculate the Cycle Time in minutes.
A: Cycle time: This is the total time taken to complete one specific task from the initial to the…
Q: A). A crew of mechanics at the Highway Department Garage repair vehicles that break down at an…
A: Single server: Multiple server:
Q: Describe four potential problems that might develop when operating a large number of processes at…
A: An operational unit or manufacturing unit consists of number of dependent and independent processes.…
Q: The consumer loan division of a major bank wants to determine the size of the staff it would need to…
A: Queuing model is used to study the functioning of a service where there are queues of customers. It…
Q: One of the questions operations managers ask about models is, are we using the correct objectives?…
A: The correct objectives are critical for the success of an operations manager because they serve as a…
Q: The consumer loan division of a major bank wants to determine the size of the staff it would need to…
A: A bank's consumer loan division needs to determine how many loan officers to hire to process 220…
Q: Approximately how much time (in minutes) does the workers spend fixing the Fab Tech equipment during…
A: Note: "Since you have asked multiple questions, we will solve the first question for you. If you…
Q: The AER company operates 24 hours a day. The performance measures of the production equipment used…
A: Given - Total working hours = 24×30 = 720 hours Non-availability of production equipment = 97 hours…
Q: What is the capacity of the process? Answer should include 2 digits after the decimal
A: Given The above process consists of for tasks which are Task 1,Task 2, Task 3, Task 4. Each of these…
Q: A certain metal forming operation can be made with three different machines. The fixed setup and…
A: Find the following details below: Machine Fixed setup cost Variable production cost 1 130 1.5…
Q: In the given time study below, if they are working for 8 hours and a target output of 650, solve…
A: STD time per operator (S) Waiting time (W) Standard time # of…
Q: For the production of part R-193, two operations are being considered. The capital investment…
A: Operation 1: Production per hr =1400 Adjustment time = 20 mins Labor cost per hr = 17 Selling price…
Q: It has been calculated that the maximum number of setups that can be performed each day is 15. What…
A: Production management entails overseeing the processes involved in converting raw materials into…
Q: operator. This adjustment takes 10 minutes. The machine operator for Operation 1 is paid $19 per…
A: Given:
Q: If in the operation of producing several products, namely A, B, C, and D, the company has a matrix…
A: To determine how many laborers are needed, we will follow these steps: 1. Calculate the total hours…
Q: A firm has redesigned its production process so that it now takes 8 hours for a unit to be made.…
A: Production process take time(T) = 8 hour Old process take time(t) = 15 hour Flow rate(R) = 2 units…
Q: Panini, a popular sandwich shop, offers 3 types of sandwiches: grilled vegetables, grilled chicken,…
A: Following formula can be used to calculate implied utilization rate: Firstly, the workload needs to…
Q: Given this set of daily service operations, and assuming a processing order of A-B-C-D-E: Service…
A:
Q: A work center containing 7 machines with the same capacity operates 2 shifts per day 6 days per week…
A: Capacity management is the process of ensuring that a company maximises its potential operations and…
Q: Operations producing high volume with low variety are classified as: a) High volume, high variety…
A: The correct answer, "b) Low volume, low variety," accurately describes operations that handle high…
Q: Instruction: Round your answer to one decimal place. What is the average labor utilization (%)? 73.4…
A: THE ANSWER IS AS BELOW:
Q: A process consists of 3 resources. Assume there exists unlimited demand for product, Resource 1 has…
A: Given- Processing time of Resource 1 = 6 minutes per unitProcessing time of Resource 2 = 4 minutes…
Q: 100 bars per hour
A: given, production = 180000 bars effort = 3 shifts per day 8 hrs. operate = 250days per year
Q: Randy, James, Michael, Sophie, and Emily are employees of an organization. Their boss has requested…
A: Average time to gift wrap = 10 minutes Available time = 8 hours = 8 hours * 60 minutes in an hour =…
Q: A startup company is considering making a part by injection molding. The part is moderately complex…
A: Given data : The volume of the part = 10 cubic meters Demand (Company needs to make) = 250,000…
Q: two station nurses clinic operates where you must visit the first station before the second. The CV…
A: In the question, We have been given the coefficient of variation data, the CV is 0.75, the average…
Q: A factory is supposed to be producing 8 hours (1 shift). However, the employees have a break of 1…
A: Find the Given details below: Given details: Total working hours 8 Hours/day Break Hours 1…
Q: The consumer loan division of a major bank wants to determine the size of the staff it would need to…
A: Each department works smoothly with help og people. The requirements of type nad number of…
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 1 images
- A manufacturing company produced first unit in 15:00 hours and dollar 2,50,000 worth of material, equipment usage, and supplies. The second unit took 13 hours and used dollar two lakh worth of materials, equipment usage and supplies. Labour is dollar 15 per hour. Determine the total production cost for additional 10 units after the second unit was completed round the final amount to nearest integerA company that processes fruits and vegetables is able to produce 500 cases of canned peaches in 1.5 hours with four workers. Each worker is paid 2 Rials per hour. What is labor productivity in terms of cases/labor hour, cases/rial?Secretaries are failing in terms of filling, by doing proper and accurate filling in the work place. Discuss the cause of the failure.
- A telephone call center uses four customer service representatives (CSRs) during the 8:30 to 9:00 a.m. time period. The standard service rate is 2.0 minutes per telephone call per CSR. Assuming a target labor utilization rate of 70 percent, how many calls can these four CSRS handle during this half-hour period? Round your answer to the nearest whole number. 14 calls3. A bread-manufacturing line typically produces 150 loaves of bread during an 8-hour shift. On average, there are 30 loaves under processing in the line at any given time. What is the value and what is the L value? What is the average time it takes to produce a loaf of bread from the raw ingredients?A toy firm produces drums sequentially on three machines- A, B, and C- with cycle times of three, four, and six minutes, respectively. a) Determine the optimum efficiency and output rates for adding one, two... six more machines b) Assume now that two identical lines are operating, each with machines A, B, and C. If new machines can be shared between the lines, how should one, two, and then three new machines be added? What are the resulting efficiencies and outputs of the two lines? Is it always best to equally share extra machines between the two lines?
- Use the following information to answer question 8-10. A company keeps track of the time required to fill orders carefully. The following data are presented: Hours Move time 2.6 Queue time Inspection time Delivery cycle time 0.4 15 Manufacturing cycle efficiency of the company is 0.12. The process time should be: A. 1.5 hours. B. 2.5 hours. C. 1.2 hours. 8. D. 0.5 hours. E. 3 hours. 9. The wait time should be: A. 1.5 hours. B. 2.5 hours. C. 1.2 hours. D. 0.5 hours. E. 3 hours. 10. Which of the following can increase the manufacturing cycle efficiency of the company, while other things remain unchanged? A. Decrease the wait time. B. Increase the queue time. C. Decrease the move time. D. Decrease the process time. E. Increase the wait time.Exercise Published by Tutor The company (from the previous example) producing training sets for basic operations with SMD components produces them in a total of 3 of its factories: New York factory, the Washington factory, and the HK factory. In total, the company will produce a total of 420 teaching sets. The New York factory will produce 50% more sets than the total production in Washington and HK combined, and the production in Washington factory is 10% higher than in HK factory. How many sets are produced in the individual production factories? The tutor published the attched solution(pic). Based on the attached solution and the exercise description can you explain me how was the total production,constraints row was constructed ?Please do not give solution in image format thanku Meals are the flow unit in a process with two sequential resources. The capacities of the resources are 28 and 24 meals per minute. Demand occurs at the rate 31 meals per minute. What is the utilization (%) of the second resource? Note: Round your answer to 1 decimal place.
- There are two competing alternatives in your textile business. A-type Tufting Machine costs $10,000 and B-Type Tufting Machine costs $10,000. A-type Tufting Machine can result in $7.000 labour savings in the first two years and $10.000 in year three. B-type Tufting Machine can result in $11.000 labour savings in the first two years. Assume MARR=20%. and find the difference between the net present worth of these two alternatives using infinite planning horizon with project repeatability. a) Between $6.480 and $6,700 O b) Between $5.480 and $5,700 O c) Between $2.480 and $2,700 d) None of the answers are correct O e) Between $4.480 and $4,700 f) Between $3,480 and $3.700Benny the Barber owns a one-chair shop. At barber college, they told Benny that his customers would exhibit a Poisson arrival distribution and that he would provide an exponential service distribution. His market survey data indicate that customers arrive at a rate of 4.0 per hour. It will take Benny an average of 8 minutes to give a haircut. Based on these figures, find the following: a. The average number of customers waiting. Note: Round your intermediate calculations to 3 decimal places and final answer to 2 decimal places. Average number of customers waiting b. The average time a customer waits. Note: Round your answer to 2 decimal places. Average waiting time minutesK Borges Machine Shop, Inc., has a 1-year contract for the production of 75,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: Annual contracted units Annual fixed cost Per unit variable cost General-Purpose Equipment (GPE) 75,000 $100,000 $15.00 Flexible Manufacturing System (FMS) 75,000 $225,000 $14.75 Dedicated Machine (DM) 75,000 $500,000 $13.00 Based on the total cost, the process that is best suited for the current contracted volume is Suppose the contracted volume changes to 275,000 gear housings. Based on the total cost, the process that is best suited for the new volumo in