Draw a fully analyzed AON network diagram and determine the project duration. Be sure to include all activity times (ES, LS, EF, LF) in the network diagram. also, prepare an activities boundary timetable for the project.

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question

Draw a fully analyzed AON network diagram and determine the project duration. Be sure to include all activity times (ES, LS, EF, LF) in the network diagram. also, prepare an activities boundary timetable for the project.

11. A large Southeast city is requesting federal funding for a park-and-ride project.* One of the requirements in the request application is a
network plan for the design phase of the project. Sophie Kim, the chief engineer, wants you to develop a project network plan to meet
this requirement. She has gathered the activity time estimates and their dependencies shown here. Show your project network with the
activity early, late, and slack times. Mark the critical path.
ID
Description
Predecessor
Time
А
Survey
None
5
B
Soils report
A
20
C
Traffic design
A
30
D
Lot layout
A
E
Approve design
В. С, D
80
F
Illumination
E
15
G
Drainage
E
30
H
Landscape
E
25
I
Signage
E
15
J
Bid proposal
F, G, H, I
10
Transcribed Image Text:11. A large Southeast city is requesting federal funding for a park-and-ride project.* One of the requirements in the request application is a network plan for the design phase of the project. Sophie Kim, the chief engineer, wants you to develop a project network plan to meet this requirement. She has gathered the activity time estimates and their dependencies shown here. Show your project network with the activity early, late, and slack times. Mark the critical path. ID Description Predecessor Time А Survey None 5 B Soils report A 20 C Traffic design A 30 D Lot layout A E Approve design В. С, D 80 F Illumination E 15 G Drainage E 30 H Landscape E 25 I Signage E 15 J Bid proposal F, G, H, I 10
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Similar questions
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.