Define the following terms: Aliquot part Retracement survey Original survey Adverse possession
Q: Please solve asap
A: Footing analysis in full bearing and partially bearing Length of foundation; Lx = 15 ftWidth of…
Q: Question 6: Draw the shear and moment diagrams for the frame in the figure below. (b) Write the…
A: First, we need to calculate the reactions at the supports. The total load on the frame is the sum of…
Q: The trussed building is subjected to a loading of 600 lb. Using the Method of Joints and…
A: Step 1: Step 2: Step 3: Step 4:
Q: Previous solution was incorrect.
A: Detailed explanation:Kindly mark it as HELPFULThanks !
Q: Please help with evironmental design problem. will thumbs up ONLY if correct.
A:
Q: 11. A cylinder of 125 mm radius rotates concentrically inside a fixed cylinder of 130 mm radius.…
A: Step 1:
Q: Question 9: Draw the moment diagrams for the beam using the method of superposition. The beam is…
A: Step 1:Step 2:
Q: Please provide step by step, previous solution was incorrect. Thanks!
A: Detailed explanation:
Q: if we had dual system structure but we cant use dual system on the structure because does not…
A: The dual system in structural engineering is a combination of two systems: a moment-resisting frame…
Q: Week 10 Non-Exact Equations - Determination of Integrating Name: 3.(xy - 4lnx + x²sinx²)dx + x²dy =…
A:
Q: 2. Using virtual work method, determine a. The rotation of point A. The modulus of elasticity is…
A: :
Q: Beam ABCD is supported by a roller at B and a pin at D. The beam is in equilibrium. a) Draw a…
A: See images below for the solution and the answer.So, D has 2 reactions because it is pinned…
Q: The boom DF of the jib crane and the column DE have a uniform weight of 50 lb/ft. If the hoist and…
A: The answer has been attached in the form of an image:
Q: structure
A: Step 1: Step 2: Step 3: Step 4:
Q: Problem 3. The dynamic viscosity of a fluid was determined to be 0.0738 N-s/m² using a viscometer.…
A:
Q: Solve by the indirect Croos method and calculate the second column of the lateral stiffness matrix…
A:
Q: The cable supports the loading shown. Determine the magnitude of the vertical force P so that yC = 6…
A:
Q: Monthly point rainfalls due to a storm at rain-gauge stations A, B, C, D and E in a Waterval basin…
A: Approach to solving the question: through calculating the data given. Detailed explanation:4.1.…
Q: Please do right answer and calculation.
A:
Q: Instruction: Draw the shear and bending moment diagrams and the qualitative deflected shape for the…
A:
Q: 1. A rectangular beam of width b = 15 in., effective depth d= 21.5 in., and total depth h = 24 in.…
A: Step 1:Calculate the Total Load (w)Total Load (w) is the sum of the dead load (1.80 kips/ft) and…
Q: The hydraulic braking system for the truck and trailer is set to produce equal braking forces for…
A:
Q: Need help, please show all work, steps, units and round to 3 significant figures. Thank you!
A:
Q: Need help, please show all work and round to 3 sig figs.
A: Given data:The magnitude of the force F1The magnitude of the force F2The two angles given are,θ=45o…
Q: Sustainable management of food by water pollution, habitat logs, climate changes, food waste(…
A: Approach to solving the question: Here's a structured approach to answering the question regarding…
Q: Please solve the problem in the picture, make sure you post pictures of your work instead of typing…
A: Step 1:Step 1: Understanding the problemThe table provides the number of flows that exceed the…
Q: Use Moment Distribution to determine all final member-end-moments for the frames given below. With…
A: Step 1:Given Equations:Base plate thickness: t_min = (1/2) * sqrt(P / (0.95 * F_b * B * N))Pedestal…
Q: 3. Find the general solution of the following differential equations: (a) (2xy + 3x²)dx + (x² +4y)dy…
A: (a) (2xy + 3x²)dx + (x² + 4y)dy = 0Let's approach this in detail:1. First, we check if it's an exact…
Q: 3.11.10. A 16-ft-diameter, cylindrical tank contains 10 ft of water depth ("h" in Figure P3.11.10).…
A:
Q: I need detailed help solving this exercise from Applied Mechanics. Step by step, please.
A:
Q: if we had dual system structure but we cant use dual system on the structure because does not…
A: First, let's understand the systems in question. A dual system is a combination of two systems,…
Q: A six-lane freeway (three lanes in each direction) in rolling terrain has 10-ft lanes and…
A: Given:Total traffic volume: 2000 vehicles per hour (vph)Highest 15-min flow rate: 600 vehiclesHeavy…
Q: HI, I AM AN ARCHITECTURE STUDENT, THIS IS MY STUDIO PROJECT AND IT HAS A CANTILEVER PART, I NEED…
A: Approach to solving the question: Answer the given question.
Q: I got these answers for the question. Could you please solve and compute them yourself. And double…
A:
Q: a. What activities make up the critical path? b. When is the proposed finish date? c. What are two…
A: Initial Schedule ConstructionHere are the activities, their durations, and dependencies:SITEWORK: 4…
Q: A 3-cy wheel loader will be used to load trucks from a quarry stockpile of uniform aggregates 1/8–…
A:
Q: 1. Analyze the frame shown in the figure using the cantilever method. Assume the columns have the…
A:
Q: 1) You were hired to analyze some stability parameters of a retaining wall, specifically safety…
A:
Q: One cubic yard (cy) is equal to 27 cubic feet (cf). If a cubic yard of concrete has 2.50 cf of…
A:
Q: An unknown weak base with a concentration of 0.0910 M has a pH of 11.30. What is the Kb of this…
A: Step 1: Kb, or the base dissociation constant, is a measure of how much a base dissociates into its…
Q: EXAMPLE ON DISCRETE RANDOM VARIABLE: Please solve the question on the picture, make sure you provide…
A: In the context of drawing a card from a standard deck of 52 cards, we can define a discrete random…
Q: A soil borrow material in its natural state in the ground has a unit weight of 125 pounds per cubic…
A: To find the water content of the soil borrow material, use the following formula:Water Content (w) =…
Q: ✓ Details By rule of thumb, what is the estimated uncertainty in 437,853 ft2 if the estimated error…
A: Step 1:
Q: S Prepare a set of three-wire leveling notes for the data given and make the page check. The…
A:
Q: Please solve the problem in the picture, Thank you for your help!
A:
Q: 3. A sign structure in the Brooklyn-Queens Expressway is to be designed to resist a wind force that…
A: Step 1:Design a foundation for a sign structure on the Brooklyn-Queens Expressway that can withstand…
Q: Calculate the reaction at A (N). Answer: D. 572 Calculate the reaction at C (N). Answer: C. 572
A: We have a frame structure with a distributed load of 200 N/m acting on member AC, a point load of…
Q: Part A What is the sensitivity of a level vial with 2-mm divisions for a radius of 40.4 m? Express…
A: Step 1:Solution 1: Step 2:Solution 2:
Q: Please explain the meaning of each welding symbol below a. b. C. 5/16 2-5 7/16 2-6 Welding weld…
A: 1. Main Welding Symbol:The arrow points to the location where the weld will be applied.The triangle…
Q: Problem 2 Given the following linear programming problem: Maximize Z = 5x1 +6x2 subject to x1 + x2…
A:
Unlock instant AI solutions
Tap the button
to generate a solution
Click the button to generate
a solution
- Can you please answer the question on the picture, I Know it's not 8700. Can you explain why it's the one!How to solve the question step by stepSubdivide the following trapezoidal lot into 2 parts (30:70) where the dividing line is parallel to the parallel sides of the trapezoidal lot and 30% of the area is on the side AB. LINES BEARINGS DISTANCES AB N 10 E 100 m BC N 80 E CD S 10 W DA N 52 W What is the length [Select] What is the area 200 m lots? [Select] of the dividing line? of the 1st (30% of the total area) of the two
- 1. A parcel of land has a technical description as shown in the tabulated data. Lines Bearing 1-2 S. 01°27' E. 2-3 S. 88°57' W. 3-4 N. 07 00' E. N. 88°47' E. Distance 27.72m. 38.21m. 27.90m. 34.12m. 4-1 The area of the lot is more or less 1000sq.m. If the lot is to be subdivided into two parts such that the dividing must start at the mid-point of line 4-1 and must be parallel to line 1-2 of the boundary. 1. What is the distance of the subdividing line? 2. What is the area of the lot subdivided on the on the easternpart. 3. What is the distance of the diagonal of the divided lot connecting the mid-point of line 4-1 and corner 2.Chapter 3 Planning ior Earthwork Construction 3.3 Using the average-end-area method, calculate the cut-and-fill volumes for stations 25 + 00 through 31 + 00. End-area End-area Volume of Volume of Station cut (sf) fill (sf) cut (bcy) fill (ccy) 25 00 26 00 3,525 355 985 27 00 786 125 28 00 2,515 1,255 620 55 29 + 00 23 29 + 25 29 +50 25 845 30 - 00 3,655 8,560 31 00 0. 83 SHOT ON HOT 7 PRO J Al QUAD LENSTHE ABOVE NEW CITY IS 400 ACRES IN AREA (43,560 f = / AC) AND IS V ÁCANT A MAJOR STREAM PASSES THE LAND AS SHOW N. SHEET* OF PAPEE ouTLINE TO DEVELOP THIS CITY WITH REGARO TO THE IN CE 321 ONLY THROUGH ON OUE WHAT MUST BE DONE TOPICS COVE RE NO CALCULA TIONS. BE NEAT AN D ORGANIZED. INCLUDE EQUATIONS
- Compute the area in acres of triangular lots shown on a plat having the followingrecorded right-angle sides:(a) 208.94 ft and 232.65 ft (b) 9 ch 25 lk and 6 ch 16 lkDescribe about the Settlement Resulting from Earth Fill.3 List the legal requirements for registration as a land surveyor in your state.