Consider the following production process making an electronic component for a navigation system. The process consists of 20 steps and operate at a cycle time of 1 minute/unit. Their most error prone operation is step 9 of 20. If each worker inspects the work of the previous steps and about 50 units of inventory are between step 9 and the end of the process, roughly

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Question
Question 9
9
Consider the following production
process making an electronic
component for a navigation system.
The process consists of 20 steps and
operate at a cycle time of 1
minute/unit. Their most error prone
operation is step 9 of 20.
O 20
If each worker inspects the work of
the previous steps and about 50 units
of inventory are between step 9 and
the end of the process, roughly
equally spaced across the remainder
of the process.
O 10
What would be the information
turnaround time for a defect made at
station 9?
O 11
O about 50 minutes
Question 10
O about 300 minutes
Consider the following production
process making an electronic
component for a navigation system.
The process consists of 20 steps
(stations) and operate at a cycle time
of 1 minute/unit. Their most error
prone operation is step 9 of 20.
O about 20 minutes
If each worker inspects the work of
the previous steps and about 50 units
of inventory are between step
(station) 9 and the end of the process,
roughly equally spaced across the
remainder of the process.
O about 5 minutes
At which station would the defect
made at station 9 would be detected?
Transcribed Image Text:Question 9 9 Consider the following production process making an electronic component for a navigation system. The process consists of 20 steps and operate at a cycle time of 1 minute/unit. Their most error prone operation is step 9 of 20. O 20 If each worker inspects the work of the previous steps and about 50 units of inventory are between step 9 and the end of the process, roughly equally spaced across the remainder of the process. O 10 What would be the information turnaround time for a defect made at station 9? O 11 O about 50 minutes Question 10 O about 300 minutes Consider the following production process making an electronic component for a navigation system. The process consists of 20 steps (stations) and operate at a cycle time of 1 minute/unit. Their most error prone operation is step 9 of 20. O about 20 minutes If each worker inspects the work of the previous steps and about 50 units of inventory are between step (station) 9 and the end of the process, roughly equally spaced across the remainder of the process. O about 5 minutes At which station would the defect made at station 9 would be detected?
Question 11
In the Toyota Production System,
Jidoka refers to
The aggressive reduction of
changeover and setup times.
The inventory retrieval system where
parts are replenished only when they
are needed
Continuous line-balancing to
maximize utilization
It means Control quality when and
where problems occur
Transcribed Image Text:Question 11 In the Toyota Production System, Jidoka refers to The aggressive reduction of changeover and setup times. The inventory retrieval system where parts are replenished only when they are needed Continuous line-balancing to maximize utilization It means Control quality when and where problems occur
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,