A manufacturing company produces four parts that require the use of a lathe and a drill press. The two machines operate 10 hours a day each. The following table provides the time in minutes required by each part: Product Production time in min Drill press Lathe 5. 6. 4 4 Additionally, the number of units of part 1 may not exceed that of part 2. Assuming that x: number of units need to be produced from product i. wherei e (1.2.3.4) The constraints and the objectives that are used to formulate "The market demand for each part is at least 10 units per day", are: O a. Minimize mar(s4, S24 $3,4 $4,4) T; + 84- 8= 10, Vi O b. Minimize i-1 $i4 %3D T +s4-8= 10, Vi %3D Oc. none of the mentioned O d. Minimize s4, 824, 834 sA I; + s-s= 10, Vi O e. Minimize s, 824, 834, 844 +84-s= 10, Vi 325 1234

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Question
Please clarify which option is correct
A manufacturing company produces four
parts that require the use of a lathe and a drill
press. The two machines operate 10 hours a
day each. The following table provides the
time in minutes required by each part:
Product
Production time in min
Drill press
Lathe
3
6.
4.
4
7
4
Additionally, the number of units of part 1
may not exceed that of part 2.
Assuming that
r: number of units need to be produced from product i. wherei e I1.2.3.4)
The constraints and the objectives that are used to formulate "The market demand for each part is at
least 10 units per day", are:
O a. Minimize mar(s4, S4, $3,4 $4,4)
Xi + 84- s= 10, Vi
O b. Minimize E-1 $4
Ti + 84-8= 10, Vi
%3D
Oc.
none of the mentioned
O d. Minimize s4, 824 $34 S44
T; +s4-8= 10, Vi
O e. Minimize s4, 824, 834, $44
+84-s= 10, Vi
%3D
Transcribed Image Text:A manufacturing company produces four parts that require the use of a lathe and a drill press. The two machines operate 10 hours a day each. The following table provides the time in minutes required by each part: Product Production time in min Drill press Lathe 3 6. 4. 4 7 4 Additionally, the number of units of part 1 may not exceed that of part 2. Assuming that r: number of units need to be produced from product i. wherei e I1.2.3.4) The constraints and the objectives that are used to formulate "The market demand for each part is at least 10 units per day", are: O a. Minimize mar(s4, S4, $3,4 $4,4) Xi + 84- s= 10, Vi O b. Minimize E-1 $4 Ti + 84-8= 10, Vi %3D Oc. none of the mentioned O d. Minimize s4, 824 $34 S44 T; +s4-8= 10, Vi O e. Minimize s4, 824, 834, $44 +84-s= 10, Vi %3D
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,