A manufacturing company produces four parts that require the use of a lathe and a drill press. The two machines operate 10 hours a day each. The following table provides the time in minutes required by each part: Production time in min Product Lathe Drill press 5. 3 4 4. Additionally, the number of units of part 1 may not exceed that of part 2. Assuming that X : number of units need to be produced from product i, wherei E (1.2,3,4) The constraints and the objectives that are used to "reduce the amount of overtime for both machines per day", are: O a. Minimize s +s + s +s 51 +6x2 + 4r3 +7x4 + s,-s =600 3x +2r2 + 5z + 4x4 + s- s • b. Minimize Li-1 $ 51 +6z2 + 4rs +7a +s 32 +2x2 +5arz + 4x4 + s, = 600 600 600 O c. Minimize s, +s 5x1 + 622 +4x3+7r4+8,-s=10 O d. Minimize s, + s 321+2r2 +5ra +4r+ s,- 8 = 600 O e. Minimize i-1 $ 52, + 6x2+4ra + 7x4 + 8, 600 3r + 2x, + 521 + 4z. 600 647
A manufacturing company produces four parts that require the use of a lathe and a drill press. The two machines operate 10 hours a day each. The following table provides the time in minutes required by each part: Production time in min Product Lathe Drill press 5. 3 4 4. Additionally, the number of units of part 1 may not exceed that of part 2. Assuming that X : number of units need to be produced from product i, wherei E (1.2,3,4) The constraints and the objectives that are used to "reduce the amount of overtime for both machines per day", are: O a. Minimize s +s + s +s 51 +6x2 + 4r3 +7x4 + s,-s =600 3x +2r2 + 5z + 4x4 + s- s • b. Minimize Li-1 $ 51 +6z2 + 4rs +7a +s 32 +2x2 +5arz + 4x4 + s, = 600 600 600 O c. Minimize s, +s 5x1 + 622 +4x3+7r4+8,-s=10 O d. Minimize s, + s 321+2r2 +5ra +4r+ s,- 8 = 600 O e. Minimize i-1 $ 52, + 6x2+4ra + 7x4 + 8, 600 3r + 2x, + 521 + 4z. 600 647
Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
Related questions
Question
Please provide me a step by step solution
And which option is correct
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 3 steps with 2 images
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,