The constraints and the objectives that are used to "reduce the amount of overtime for both machines per day", are: O a. Minimize s, +s+ s, +s, 521 + 6x2 + 4r, +7r4+s,- s = 600 3x1 + 2x2 + 5xz + 4x4 + 8, b. Minimize Ei-1 $ 521 + 672 + 4rz + 7x4 + s, – s 3x1 +2x2 + 5I3 + 4x4 + 8, 600 600 600 Oc. Minimize s, + s 521 + 6x2 + 4x3 +724+ s,-s = 10 Od. Minimize s, + s, 3x1 + 2x2 + 53 + 4x4 + s, – 8, = 600 O e. Minimize Ei-1 $ 5x1 + 6r2 + 4ra + 7x4+ s, -s = 600 3x1 +2r2 +5x3 + 4x4 + 8, 600 %3D 48% 7IF Sunny

Algebra and Trigonometry (6th Edition)
6th Edition
ISBN:9780134463216
Author:Robert F. Blitzer
Publisher:Robert F. Blitzer
ChapterP: Prerequisites: Fundamental Concepts Of Algebra
Section: Chapter Questions
Problem 1MCCP: In Exercises 1-25, simplify the given expression or perform the indicated operation (and simplify,...
icon
Related questions
Question
What is the correct option please?
The constraints and the objectives that are used to "reduce the amount of overtime for both
machines per day", are:
O a. Minimize s, +s + s, + s,
5x1 + 6x2 + 4rz +7x4+ s,– 8 = 600
3x1 + 2x2 + 5xz + 4x4 + s,
b. Minimize >18,
8 = 600
5a1 + 6x2 + 4rz + 7x4 +s, - 8, = 600
3x1 + 2x2 +5x3 + 4x4 + s,
600
O c. Minimize s, +s
5x1 + 6x2 + 4x3 +7x4 + 8,-8 = 10
O d. Minimize s, + s,
3x1+2x2+5r3 + 4x4 + s, - 8, = 600
O e. Minimize 1 s
5æ1 + 6x2 + 4r3 + 7a4 + 8, - s = 600
3x1 + 2x2 +5r3 +4x4 + s, – s, = 600
48%
77°F Sunny
Transcribed Image Text:The constraints and the objectives that are used to "reduce the amount of overtime for both machines per day", are: O a. Minimize s, +s + s, + s, 5x1 + 6x2 + 4rz +7x4+ s,– 8 = 600 3x1 + 2x2 + 5xz + 4x4 + s, b. Minimize >18, 8 = 600 5a1 + 6x2 + 4rz + 7x4 +s, - 8, = 600 3x1 + 2x2 +5x3 + 4x4 + s, 600 O c. Minimize s, +s 5x1 + 6x2 + 4x3 +7x4 + 8,-8 = 10 O d. Minimize s, + s, 3x1+2x2+5r3 + 4x4 + s, - 8, = 600 O e. Minimize 1 s 5æ1 + 6x2 + 4r3 + 7a4 + 8, - s = 600 3x1 + 2x2 +5r3 +4x4 + s, – s, = 600 48% 77°F Sunny
A manufacturing company produces four
parts that require the use of a lathe and a drill
press. The two machines operate 10 hours a
day each. The following table provides the
time in minutes required by each part:
Production time in min
Product
Lathe
Drill press
3
2
3
4
4
7
4.
Additionally, the number of units of part 1
may not exceed that of part 2.
Assuming that
x; : number of units need to be produced from product i, wherei E (1,2,3,4)
25
56
Transcribed Image Text:A manufacturing company produces four parts that require the use of a lathe and a drill press. The two machines operate 10 hours a day each. The following table provides the time in minutes required by each part: Production time in min Product Lathe Drill press 3 2 3 4 4 7 4. Additionally, the number of units of part 1 may not exceed that of part 2. Assuming that x; : number of units need to be produced from product i, wherei E (1,2,3,4) 25 56
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Recommended textbooks for you
Algebra and Trigonometry (6th Edition)
Algebra and Trigonometry (6th Edition)
Algebra
ISBN:
9780134463216
Author:
Robert F. Blitzer
Publisher:
PEARSON
Contemporary Abstract Algebra
Contemporary Abstract Algebra
Algebra
ISBN:
9781305657960
Author:
Joseph Gallian
Publisher:
Cengage Learning
Linear Algebra: A Modern Introduction
Linear Algebra: A Modern Introduction
Algebra
ISBN:
9781285463247
Author:
David Poole
Publisher:
Cengage Learning
Algebra And Trigonometry (11th Edition)
Algebra And Trigonometry (11th Edition)
Algebra
ISBN:
9780135163078
Author:
Michael Sullivan
Publisher:
PEARSON
Introduction to Linear Algebra, Fifth Edition
Introduction to Linear Algebra, Fifth Edition
Algebra
ISBN:
9780980232776
Author:
Gilbert Strang
Publisher:
Wellesley-Cambridge Press
College Algebra (Collegiate Math)
College Algebra (Collegiate Math)
Algebra
ISBN:
9780077836344
Author:
Julie Miller, Donna Gerken
Publisher:
McGraw-Hill Education