Commercial trucks begin to arrive at a seaport entry plaza at 7:50 A.M., at the rate of λ(t) = 6.3 – 0.25t[λ(t) is in veh/min and t is in minutes]. The plaza opens at 8:00 A.M. For the first 10 minutes, one processing booth is open. After the first 10 minutes until the queue clears, two processing booths are open. Each booth processes trucks at a uniform rate of two per minute. What is the average delay per vehicle, the maximum queue length, and the average queue length?

Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter4: Traffic Engineering Studies
Section: Chapter Questions
Problem 21P
icon
Related questions
Question

Commercial trucks begin to arrive at a seaport 
entry plaza at 7:50 A.M., at the rate of λ(t) = 6.3 – 0.25t
[λ(t) is in veh/min and t is in minutes]. The plaza opens 
at 8:00 A.M. For the first 10 minutes, one processing 
booth is open. After the first 10 minutes until the 
queue clears, two processing booths are open. Each 
booth processes trucks at a uniform rate of two per 
minute. What is the average delay per vehicle, the 
maximum queue length, and the average queue length? 

Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
Recommended textbooks for you
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Solid Waste Engineering
Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,
Engineering Fundamentals: An Introduction to Engi…
Engineering Fundamentals: An Introduction to Engi…
Civil Engineering
ISBN:
9781305084766
Author:
Saeed Moaveni
Publisher:
Cengage Learning