Q1) The table below represents a small project list of activities. a) Draw the project network (arrow diagram network). b) If a 30-week deadline is required, what is the probability that the project will be finished within the time limit? c) If the project manager wants to be 99% sure that the project is completed on the scheduled date, what is the required duration for accomplishing that goal? E, F, G HF555 Activity A B C E F Predecessor A A To 2 10 8 Tm 4 12 69 10 7 47 A B, C GD G 13 15 7.5 Тр 12 12 26 10 20 11 51 18 38 3 3.5 27 7 d you have completed 40% of the
Q1) The table below represents a small project list of activities. a) Draw the project network (arrow diagram network). b) If a 30-week deadline is required, what is the probability that the project will be finished within the time limit? c) If the project manager wants to be 99% sure that the project is completed on the scheduled date, what is the required duration for accomplishing that goal? E, F, G HF555 Activity A B C E F Predecessor A A To 2 10 8 Tm 4 12 69 10 7 47 A B, C GD G 13 15 7.5 Тр 12 12 26 10 20 11 51 18 38 3 3.5 27 7 d you have completed 40% of the
Residential Construction Academy: House Wiring (MindTap Course List)
4th Edition
ISBN:9781285852225
Author:Gregory W Fletcher
Publisher:Gregory W Fletcher
Chapter1: Residential Workplace Safety
Section: Chapter Questions
Problem 31RQ
Question
Project management question

Transcribed Image Text:Q1) The table below represents a small project list of activities.
a) Draw the project network (arrow diagram network).
b) If a 30-week deadline is required, what is the probability that the project will be
finished within the time limit?
c) If the project manager wants to be 99% sure that the project is completed on the
scheduled date, what is the required duration for accomplishing that goal?
E, F, G
HF555
Activity
A
B
C
E
F
Predecessor
A
A
To
2
10
8
Tm
4
12
69
10
7
47
A
B, C
GD
G
13
15
7.5
Тр
12
12
26
10
20
11
51
18
38
3
3.5
27
7
d you have completed 40% of the
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps

Recommended textbooks for you

Residential Construction Academy: House Wiring (M…
Civil Engineering
ISBN:
9781285852225
Author:
Gregory W Fletcher
Publisher:
Cengage Learning

Construction Materials, Methods and Techniques (M…
Civil Engineering
ISBN:
9781305086272
Author:
William P. Spence, Eva Kultermann
Publisher:
Cengage Learning

Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,

Residential Construction Academy: House Wiring (M…
Civil Engineering
ISBN:
9781285852225
Author:
Gregory W Fletcher
Publisher:
Cengage Learning

Construction Materials, Methods and Techniques (M…
Civil Engineering
ISBN:
9781305086272
Author:
William P. Spence, Eva Kultermann
Publisher:
Cengage Learning

Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,

Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning

Engineering Fundamentals: An Introduction to Engi…
Civil Engineering
ISBN:
9781305084766
Author:
Saeed Moaveni
Publisher:
Cengage Learning

Architectural Drafting and Design (MindTap Course…
Civil Engineering
ISBN:
9781285165738
Author:
Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:
Cengage Learning