Fundamentals Of Construction Estimating
4th Edition
ISBN: 9781337399395
Author: Pratt, David J.
Publisher: Cengage,
expand_more
expand_more
format_list_bulleted
Textbook Question
Chapter 1, Problem 9RQ
List and describe the six elements of a detailed estimate.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Draw the three projections showing the measurements, thanks for the cooperation
Define a Class A, B, C and D Estimate?
What is the difference between a preliminary and detailed estimate?
Chapter 1 Solutions
Fundamentals Of Construction Estimating
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- It is required to lay out a building 80 m by 100 m with a 30-m long metallic tape which was found to be 0.15 m too short. Determine the correct dimensions to be used in order that the building shall have the desired measurements. Please include the complete solutionarrow_forward13. is the process to determine the overall cost of projects construction. Fill in the blankarrow_forwardCould you show the calculations for the tablearrow_forward
- This assignment consists of determining the quantities for a cost estimate in different units. Assume a rectangular warehouse with internal measurements of 22' wide, 34’long and 12' high. The warehouse has (including the frame): One 6' wide and 5' high window on all walls. A 6' wide and 8' high door in the front wall. Walls: 6” block (above floor) Concrete: thickness of ceiling = 5” and floor = 4” Assume 4 14” x 14” columns (1 column at each corner of warehouse) and one beam throughout perimeter below ceiling 14" wide and 20" high. The 4” concrete floor has a 6” wide by 12” high perimeter beam. The column footing will be counted 2'-6" from the top of the floor. Square footing size is 6'-0" x 6'-0" by 12" thick. Make a drawing with your best interpretationarrow_forwardQ#: Differentiate between rough and detailed cost estimate with examples.arrow_forwardWhat is NPSH ? What is the difference NPSH available and NPSH required?arrow_forward
- J2arrow_forwardPrepare the rough estimate for a proposed commercial compels for a municipal corporation for the following data. o Plinth Area = 500m2/floor o Height of each story = 3.5m o No. of stores = G+2 o Cubical content rate = $100/m³ Provided for a following as a percentage of structured cost • water supply & Sanitary arrangement 8% Electrification 6% Fluctuation of rates 5% Contractors profit 10% Petty supervision & contingencies 3% SAAD RIDHAGEPU. EDU.IO 39arrow_forwardWill commercial projects require a detailed estimate with a full quantity takeoff?arrow_forward
- Suggest why the cost per unit area is the most popular method of preliminary estimating.arrow_forwardWhat references are provided as an aid to compare the provisions of measurement and payment?arrow_forwardPlease explain in detail your answer and show your step by step process so that your approach is easily followedarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,Architectural Drafting and Design (MindTap Course...Civil EngineeringISBN:9781285165738Author:Alan Jefferis, David A. Madsen, David P. MadsenPublisher:Cengage Learning
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning
Introduction to Materials; Author: Industrial Heating;https://www.youtube.com/watch?v=R8EV8R8f5Tw;License: Standard Youtube License