The arrival times of vehicles at the ticket gate of a sports stadium may be assumed to bePoisson with a mean of 30 mi/h. It takes an average of 1.5 min for the necessary tickets to be bought for occupants of each car.

(a) What is the expected length of queue at the ticket gate, not including the vehicle being served?

(b) What is the probability that there are no more than 5 cars at the gate, including the vehicle being served?

(c) What will be the average waiting time of a vehicle?

Blurred answer
Students have asked these similar questions
A floor consists of 8 steel beams/girders supporting three 1-way slab panels. The   beams are supported on 6 columns around the perimeter of the roof. The roof is   subjected to a uniform pressure of 150 psf . All beams and girders weigh 90lb//ft.   Use free-body diagrams and statics equations to determine the load and reactions   on all the beams (Beam 1, 2, 3 and 4), girders (Girders 1 and 2), and columns   (Columns 1, 2 and 3).   (we only focused on one-way slabs in the class + pls include FBDs)
Design an intake tower with gates meet the following requirement: • Normal water surface elevation = 100 m mean sea level • Max. reservoir elevation = 106 m msl • Min. reservoir elevation = 90 m msl • Bottom elevation = 81m msl • Flow rate=57369.6 m³/day.. Velocity = 0.083 m/s ⚫c=0.6, Density for water =1000 kg/m³. Density for concrete =2310 kg/m³ Estimate water elevation that make safety factor =1 ร 4 m Uppr gate 2m 1 m Lower gate 2m Gate 6m 2m 4 m ร 2 m wz
4. The storm hyetograph below produced 530 acre-ft of runoff over the 725-acre Green River watershed. Plot the storm hyetograph and compute and plot the excess rainfall hyetograph using the op-index method. Time (hours) 0-33-66-99-12 12-15 Rainfall Intensity (in/hr) 0.2 0.8|1.2 1.8 0.9
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
What Is A Construction Takeoff? | Are They Still Necessary In Quantity Surveying?; Author: Metroun Quantity Surveying;https://www.youtube.com/watch?v=uTWoDPtcOjg;License: Standard Youtube License