Beam 1: Beam 1 shall have a maximum clear span of 18'-3" and is located between the basement living room and hallway. ○ This beam will support tributary loading from the 1st, floor, 2nd floor, ceiling, and roof framing. ○ We recommend installing one of the following: - A triple 1¾”x24” 2.0E LVL beam supported by 5¼”x5¼” 1.8E Parallam PSL columns at each end. - A W12x45 steel beam supported by HSS 5"x5"x¼" steel columns at each end. ○ The steel columns shall bear onto a concrete footing that is verified, or installed, as equivalent to 42"x42"x12" thick concrete footing with #4 bars at 9" o.c. each way each way for reinforcement. Beam 2: Beam 2 shall have a maximum clear span of 18'-3" and is located in the basement media room and hallway. ○ This beam will support tributary loading from the 1st floor & 2nd floor framing. ○ We recommend installing one of the following: - A triple 1/4"x18" 2.0E LVL beam - A double 1/4"x24" 2.0E LVL beam ○ Both ends shall be supported by a triple 2x6 SPF #2 packed stud column. ○ The packed stud columns shall bear onto a concrete footing that is verified, or installed, as equivalent to 30"x30"x12" thick concrete footing with #4 bars at 9" o.c. each way each way for reinforcement. Additional Requirements/Specifications: ○ Simpson post caps and bases required for wood beams to column and column to concrete connections. ○ 3/4” A36 steel base plates are required at steel columns to concrete locations. PROPOSED PLAN FINISHED STORAGE "Furr out walls, drywall and add flooring 374" FINISHED WORKSHOP *Furr out walls, drywall and add flooring 271" New Lam Pia to be removed P FINISHED WORKSHOP "Furr out walls, drywall and add flooring UTILITY This yll require replacing windows 263" TV ROOM CH-109-112 1ST FLOOR, CEILING & ROOF Extend 1ST FLOOR, 2ND FLOOR, CEILING & ROOF 1ST FLOOR, CEILING & ROOF UNFINISHED STORAGE 149" NEW BATH CH-TBD GAME ROOM CH-106" B OFFICE CH-106-1/2 NEW CL ·58% 16" NEW CL ·50%" D 183 BEDROOM CH-106 1/2" wwwwww 129 ° 910

Architectural Drafting and Design (MindTap Course List)
7th Edition
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Alan Jefferis, David A. Madsen, David P. Madsen
Chapter28: Structural Components Of Framed Construction
Section: Chapter Questions
Problem 28.4Q
icon
Related questions
Question

structural engineering.pls answer all the questions in the below image to the best of your knowledge. will give an upvote.

Beam 1: Beam 1 shall have a maximum clear span of 18'-3" and is located
between the basement living room and hallway.
○ This beam will support tributary loading from the 1st, floor, 2nd floor,
ceiling, and roof framing.
○ We recommend installing one of the following:
- A triple 1¾”x24” 2.0E LVL beam supported by 5¼”x5¼” 1.8E
Parallam PSL columns at each end.
- A W12x45 steel beam supported by HSS 5"x5"x¼" steel columns
at each end.
○ The steel columns shall bear onto a concrete footing that is verified,
or installed, as equivalent to 42"x42"x12" thick concrete footing
with #4 bars at 9" o.c. each way each way for reinforcement.
Beam 2: Beam 2 shall have a maximum clear span of 18'-3" and is located
in the basement media room and hallway.
○ This beam will support tributary loading from the 1st floor & 2nd floor
framing.
○ We recommend installing one of the following:
- A triple 1/4"x18" 2.0E LVL beam
- A double 1/4"x24" 2.0E LVL beam
○ Both ends shall be supported by a triple 2x6 SPF #2 packed stud
column.
○ The packed stud columns shall bear onto a concrete footing that is
verified, or installed, as equivalent to 30"x30"x12" thick concrete
footing with #4 bars at 9" o.c. each way each way for
reinforcement.
Additional Requirements/Specifications:
○ Simpson post caps and bases required for wood beams to column and
column to concrete connections.
○ 3/4” A36 steel base plates are required at steel columns to concrete
locations.
Transcribed Image Text:Beam 1: Beam 1 shall have a maximum clear span of 18'-3" and is located between the basement living room and hallway. ○ This beam will support tributary loading from the 1st, floor, 2nd floor, ceiling, and roof framing. ○ We recommend installing one of the following: - A triple 1¾”x24” 2.0E LVL beam supported by 5¼”x5¼” 1.8E Parallam PSL columns at each end. - A W12x45 steel beam supported by HSS 5"x5"x¼" steel columns at each end. ○ The steel columns shall bear onto a concrete footing that is verified, or installed, as equivalent to 42"x42"x12" thick concrete footing with #4 bars at 9" o.c. each way each way for reinforcement. Beam 2: Beam 2 shall have a maximum clear span of 18'-3" and is located in the basement media room and hallway. ○ This beam will support tributary loading from the 1st floor & 2nd floor framing. ○ We recommend installing one of the following: - A triple 1/4"x18" 2.0E LVL beam - A double 1/4"x24" 2.0E LVL beam ○ Both ends shall be supported by a triple 2x6 SPF #2 packed stud column. ○ The packed stud columns shall bear onto a concrete footing that is verified, or installed, as equivalent to 30"x30"x12" thick concrete footing with #4 bars at 9" o.c. each way each way for reinforcement. Additional Requirements/Specifications: ○ Simpson post caps and bases required for wood beams to column and column to concrete connections. ○ 3/4” A36 steel base plates are required at steel columns to concrete locations.
PROPOSED PLAN
FINISHED STORAGE
"Furr out walls, drywall
and add flooring
374"
FINISHED WORKSHOP
*Furr out walls, drywall
and add flooring
271"
New Lam
Pia to be removed
P
FINISHED WORKSHOP
"Furr out walls, drywall
and add flooring
UTILITY
This yll require replacing windows
263"
TV ROOM
CH-109-112
1ST FLOOR,
CEILING & ROOF
Extend
1ST FLOOR, 2ND
FLOOR, CEILING
& ROOF
1ST FLOOR,
CEILING & ROOF
UNFINISHED STORAGE
149"
NEW BATH
CH-TBD
GAME ROOM
CH-106"
B
OFFICE
CH-106-1/2
NEW CL
·58% 16"
NEW CL
·50%"
D
183
BEDROOM
CH-106 1/2"
wwwwww
129
°
910
Transcribed Image Text:PROPOSED PLAN FINISHED STORAGE "Furr out walls, drywall and add flooring 374" FINISHED WORKSHOP *Furr out walls, drywall and add flooring 271" New Lam Pia to be removed P FINISHED WORKSHOP "Furr out walls, drywall and add flooring UTILITY This yll require replacing windows 263" TV ROOM CH-109-112 1ST FLOOR, CEILING & ROOF Extend 1ST FLOOR, 2ND FLOOR, CEILING & ROOF 1ST FLOOR, CEILING & ROOF UNFINISHED STORAGE 149" NEW BATH CH-TBD GAME ROOM CH-106" B OFFICE CH-106-1/2 NEW CL ·58% 16" NEW CL ·50%" D 183 BEDROOM CH-106 1/2" wwwwww 129 ° 910
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Architectural Drafting and Design (MindTap Course…
Architectural Drafting and Design (MindTap Course…
Civil Engineering
ISBN:
9781285165738
Author:
Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:
Cengage Learning