1. A sack slides off the ramp as shown with a horizontal velocity of 10 m/s. If the height of the ramp is 8 m from the floor determine the time needed for the sack to strike the floor and the range R where sacks begin to pile up. 2 The chipping machine is designed to eject wood chips at v - 50 ft/s. If the tube is oriented at 40° from the horizontal, determine how high h the chips strike the pile if at this instant they land on the pile 30 ft from the tube. 3. The ball is kicked from point A with the initial velocity v 20 m/s. Determine the range R

Fundamentals of Geotechnical Engineering (MindTap Course List)
5th Edition
ISBN:9781305635180
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Braja M. Das, Nagaratnam Sivakugan
Chapter18: Pile Foundation
Section: Chapter Questions
Problem 18.10P
icon
Related questions
Question
1. A sack slides off the ramp as shown with a horizontal velocity of 10 m/s. If the height of the ramp is 8 m from the floor determine the time needed
for the sack to strike the floor and the range R where sacks begin to pile up.
2. The chipping machine is designed to eject wood chips at v - 50 ft/s. If the tube is oriented at 40° from the horizontal, determine how high h. the
chips strike the pile if at this instant they land on the pile 30 ft from the tube.
3. The ball is kicked from point A with the initial velocity v 20 m/s. Determine the range R
Transcribed Image Text:1. A sack slides off the ramp as shown with a horizontal velocity of 10 m/s. If the height of the ramp is 8 m from the floor determine the time needed for the sack to strike the floor and the range R where sacks begin to pile up. 2. The chipping machine is designed to eject wood chips at v - 50 ft/s. If the tube is oriented at 40° from the horizontal, determine how high h. the chips strike the pile if at this instant they land on the pile 30 ft from the tube. 3. The ball is kicked from point A with the initial velocity v 20 m/s. Determine the range R
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Knowledge Booster
Pressurized pipe flow
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Fundamentals of Geotechnical Engineering (MindTap…
Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Solid Waste Engineering
Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781305081550
Author:
Braja M. Das
Publisher:
Cengage Learning