CLCL 010 Technical Data Management

docx

School

Defense Acquisition University *

*We aren’t endorsed by this school

Course

CLCL004

Subject

Mechanical Engineering

Date

Jan 9, 2024

Type

docx

Pages

4

Uploaded by eugene5316

Report
Question 1 of 10. You are the logistician in charge of moving all the technical data to a Cloud Service provider. What should be your first step? Identify the Impact Level Obtain Buy-In from Leadership Exchange information with the Cloud vendors Determine the cost Question 2 of 10. You are assigned to review the engineering drawing for the correct format. The drawing is for a type 3D native model. What is your response about the drawing? Drawing is almost correct since it is a blue print Drawing is correct; a 3D native model Not a 3D native model None of these responses is correct. Question 3 of 10. You are assigned as lead logistician to lead a team and to develop an Intellectual Property Strategy concept for a new weapon system. What would you state to the team in terms of an IP data management strategy? Only obtain computer software source code Obtain the essential, proper and necessary data via a Contract Data Requirement List Obtain all the data developed under the contract via a Contract Data Requirement List Only list the Defense Federal Acquisition Regulation Supplement (DFARS) clauses in the Intellectual Property Strategy Question 4 of 10. What would be the Configuration Management Baseline for Navy’s ship fuel pump that would contain the full list of performance specifications, material/process specifications, all engineering drawings, and associated lists? (This is essentially all of the technical data necessary to acquire or manufacture the pump.) Product Functional Allocated Question 5 of 10.
After the Army’s new software-defined radio is developed and deployed, we want to solicit alternative sources for sustaining it in the field. Which of the following data rights will enable us to share the necessary technical data with an alternative product support provider? Select two that apply. Limited Rights None of the answers are correct Government Purpose Rights Unlimited Rights Question 6 of 10. What level of Technical Data Package is required for a newly developed Army truck that has entered into the Production and Deployment phase of the Major Capability Acquisition pathway? Development level Conceptual level Product level None of the answers are correct Question 7 of 10. After importing a GEIA-STD-0007-compliant Logistics Product Database file, your powerLOG-J presents an error screen with a message calling out a violation. What is the most effective and proper way to correct this identified violation? Ignore this error message; database import errors are not a concern when conducting or evaluating Supportability Analysis. Cancel the import and call LOGSA powerLOG-J customer support for assistance. Since you have seen this kind of error before, make the correction yourself and inform your IPT. Report the error through your Integrated Product Team so the violation can be evaluated for contract compliance and corrective action can be taken as necessary. Question 8 of 10. What logistics product data would be requested by submitting a completed CDRL for a new four ton folk lift to be delivered to the Army? Test Reports Interface Control Drawings System Requirement Specification Preservation and Packing Data Question 9 of 10. What is the correct Work Breakdown Structure (WBS) for a new Navy Destroyer ship? Use the WBS containing alternatives “a,” “b,” “c,” and “d,” to choose your answer. Alternative a. 1.0 Sea
System 1.1 Ship 1.1.1 Hull Structure 1.1.2 Propulsion Plant 1.1.2.1 Engine 1.1.2.2 Main Reduction Gear 1.2 Systems Engineering 1.2.1 Core Systems Engineering Alternative b. 1.0 Sea System 1.1 Hull Structure 1.2 Propulsion Plant 1.1.2.1 Engine 1.1.2.2 Main Reduction Gear Alternative c. 2.0 Propeller 2.1 Systems Engineering 3.0 Technical Manuals 3.1 Propulsion Plant technical manual Alternative d. 1.0 Ship 1.1 Gas Turbine 1.1.1 Compressor assembly 1.2 Lube oil pump 1.2.1 440 Volt systems 2.0 Integrated Logistics support 2.1 Training 2.2 Spare parts list b c a d Question 10 of 10.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
The lube oil purifier for a DDG 51 Class Destroyer failed during production builders trials due to an unreliable bearing. Which three of the following IPS Elements in Page 3, Block 38, of the ECP Form are most likely to be effected? Training & Training Support Product Support Management Support Equipment Technical Data Packaging, Handling, Storage, and Transportation (PHS&T) Manpower & Personnel Design Interface Facilities & Structure Maintenance Planning & Mgmt Other Sustaining Engineering Computer Resources Supply Support