PORTFOLIO ASSESSMENT TASK
— Student guide
© Box Hill Institute Document last reviewed: 07/03/2022
Template Version 2.2022
OFFICIAL
OFFICI
AL
OFFICI
AL
OFFICIAL
Assessment cover sheet This form must be attached to the front of all submitted hard copy assessments. Student details: Student to complete Student name
Student ID
Student declaration
By signing below, I declare that the work submitted here is my own work and it does not include work which is plagiarised, copied in whole or in part from another student or other source such as published
books, internet or journals without due acknowledgement in the text. Student signature
Date Assessment details: Teacher to complete
Course national ID and title
CPC50220 – Diploma of Building and Construction
(Building)
CPC40120 – Certificate IV in Building and Construction
Unit/s national ID and title
CPCCBC4010 – Apply structural principles to residential and commercial constructions
Assessment task number and name
2 of 2 Portfolio assessment task
Pre-requisite unit/s
Nil
Date due
Date submitted
Assessor name
OFFICIAL
RTO No. 4687 CRICOS Provider No. 02411J
Version 2.2022
Page 1
of 9
OFFICI
AL
OFFICI
AL
Assessment result and feedback Result
Satisfactory
Not yet satisfactory
Re-submit date if required
Feedback
Assessor’s signature
Date
Assessment review
If you believe that you have been assessed unfairly, you have the right to request an informal assessment review. When your assessment cover sheet is returned to you, you can request an informal review by filling in the section below and returning it to your assessor or the Operations Manager of your area. If you are not satisfied with the outcome, you can apply for a formal review of assessment on the application form
located on the Box Hill Institute Website. I request a review of my assessment for the following reasons:
Student signature
Date
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
OFFICI
AL
OFFICI
AL
Instructions to student
Assessment task number and name
2 of 2 Portfolio assessment task
Description of assessment task
This is 2
of 2 assessments you need to successfully complete to be deemed competent in this unit.
In this assessment you will be required to demonstrate your ability to:
Apply structural principles when planning the erection or demolition of a structure
Analyse and plan for the structural integrity of Class 1 and Class 10 buildings
Plan, coordinate and manage the laying of footings
Plan, coordinate and manage the laying of floor system
Plan, coordinate and manage the building of structural and non-structural wall systems
Plan, coordinate and manage the building of roof system
Plan, coordinate and manage the external wall cladding of structure
Full details of the tasks are provided in the task instructions below.
Conditions of assessment
Time allowed
As prescribed
Pre-requisite unit(s)
Nil
Where the assessment will
take place Take home assessment
Individual or group work
Individual
Support equipment allowed i.e.: calculator, dictionary
Access to: •
computer with internet access •
Learner Resources via LMS • Microsoft Word or compatible word processing app
a construction project (Residential - Class 1 and 10 buildings, maximum two storeys OR Commercial - Class 2 to 9, Type C only constructions) in the workplace or simulated environment
Context and conditions of assessment
Complete it individually, answering all questions and submit your answers electronically according to task intructions and complete by the specified deadline
Use provided example or learner to provide their own project documentation
Submission instructions
What to submit Answer all questions
OFFICI
AL
OFFICI
AL
Instructions to student
How to submit
Submit your answers electronically via the LMS in PDF format
How to present your work Filled In PDF format
How many attempts at assessment are permitted
Three
Level of assistance permitted
If you have any questions about the task or concerns about your ability
to complete the task, please discuss this with your assessor. Assessment to be completed individually.
How will the assessment judgement be made
☐
Observation checklist
☐
Exemplar
☐
Performance checklist
☐
Rubric
☒
Answer guide
☐
Benchmarks
Safety
If at any time during the learning and assessment process, your Teacher/Assessor considers that the safety of any person is at risk they will abort the session.
Reasonable adjustment
You may access reasonable adjustment to enable you to participate in training and assessment. You can learn more about student welfare and disadvantage through the Student disability policy
and procedure on the Box Hill Institute website or by calling Student Life on 9286 9891, SMS on 0429 680 488, or by emailing the Disability liaison service on dls@boxhill.edu.au or by calling into the Student Life office at Elgar campus in B3.224. More information is available on https://studentweb.bhtafe.edu.au/studenthub
.
You can contact Access and Disability Support at CAE city campus on 8892 1612 or email dls@boxhill.edu.au or calling into the Student Life office at the city campus in C1.202.
Reasonable adjustments of the task for those who do not have access to a working job site will be to utilise plans provided to answer the Worksheet Tasks.
Videos may be left out in most cases with sufficient pictures to be used in a show and tell format.
Special consideration
Where a student anticipates that a result will be impacted by special circumstances such as ill health or bereavement, application can be made for special consideration. Forms can be accessed from the
OFFICI
AL
OFFICI
AL
Instructions to student
Student Life office at Elgar Campus in B3.224 or download the special consideration application form
.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
OFFICI
AL
OFFICI
AL
Assessment task 2
Task instructions
This assessment allows you to apply your skills and knowledge to the planning, coordination and management of a construction project. The construction project can occur in your workplace or simulated environment. If you’re unable to apply this to your workplace (for example, current building projects do not align with the requirements of the assessment, or you do not have access to a workplace), discuss alternatives with your teacher/assessor. This unit must be carried out over the course of a construction project to include all parts of the project worksheet. In addition to completing the project worksheet, you will also submit documents relating to the construction project, video recordings and photographs as required by the project worksheet. The work must be your own work. This project must be completed in full. Responses should apply directly to your workplace. This project is to be completed based on the construction of a Residential (Class 1 and 10 buildings, maximum two storeys). Work through the Project Worksheet to guide the required information for each stage of the building.
The project stages cover:
Assessing the structural integrity of the construction project – includes confirming compliance with general requirement and performance requirements of NCC
Planning and documenting the structural principles of the construction of a building
Pre-commencement site inspection to confirm analysis
Applying the technical construction principles and concepts to the appropriate selection, integration and building of construction elements and components
Planning, coordinating, implementing and checking the installation of footings, flooring, walls, roof systems and cladding
You are required to submit copies of the site plans and other relevant documentation as evidence for this project. On-site video and photographs are a key form of evidence required for assessment and will be assessed through observation by your assessor. These are outlined throughout the project worksheet and the “What to Submit” section
OFFICI
AL
OFFICI
AL
Project Worksheet
Task
Portfolio requirements
Response
Satisfactory
(S)
Not satisfactory
(NS)
1
Analysis: class
From the plans, drawings and specifications, determine
the following (in reference to the NCC):
the class of the building
intended use
climate zone classification
Submit all project plans, drawings and associated
documentation.
Satisfactory
Not yet satisfactory
2
Analysis: environment
From the plans and specifications, confirm compliance with NCC environment requirements including:
bushfire
high wind
earthquake
alpine
Satisfactory
Not yet satisfactory
3
From the plans and specifications, and your knowledge of building standards and codes, explain the building design and specific issues relating to structural integrity. Start with soil conditions,
footing plans, beams, supports and loads, bracing, beams, members, etc., then make sure you identify any additional structural integrity issues unique to/critical to the Satisfactory
Not yet satisfactory
OFFICI
AL
OFFICI
AL
Project Worksheet
Task
Portfolio requirements
Response
Satisfactory
(S)
Not satisfactory
(NS)
construction project.
Refer to specific plans, drawings and specifications and documents including soil report, structural drawings and computations.
Specify the NCC codes referring to each item you identify. Submit any additional project documentation used to support your findings.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
OFFICI
AL
OFFICI
AL
Project Worksheet
Task
Portfolio requirements
Response
Satisfactory
(S)
Not satisfactory
(NS)
4
Analysis: Options and variations
Builders often look at possible variations to building proposals that potentially introduce a range of benefits to the project such as time and cost savings, while maintaining or improving quality and compliance.
For example, the project soil report might recommend a conventional raft slab, but your company specialises in contemporary waffle pod
slabs which can be installed quicker and cheaper. This alternative must be referred to and approved
by the structural engineer, and all drawing
amendments approved by the building surveyor.
Did your project install alternative structural material that was different to the original plans? This can be in regard to any structural component. The alternative must be considered a new or more recent or emerging
material or approach or technology compared to Satisfactory
Not yet satisfactory
OFFICI
AL
OFFICI
AL
Project Worksheet
Task
Portfolio requirements
Response
Satisfactory
(S)
Not satisfactory
(NS)
the original. If so, explain the process
you followed to:
identify the opportunity for a possible alternative
determine the reason for the alternative
confirm that the alternative complied with structural integrity standards and codes to at least the same level or higher than the original
seek approval from
structural engineer and building surveyor
Explain the outcome - what happened - and report on the benefits to the project. Submit evidence of engagement with industry professionals.
If this did not occur, use the example of the alternative slab and explain how you would go about implementing this variation based on the same points above. Create a sample email to
show how you would communicate the changes to the structural
engineer and building surveyor.
OFFICI
AL
OFFICI
AL
Project Worksheet
Task
Portfolio requirements
Response
Satisfactory
(S)
Not satisfactory
(NS)
5
Planning: confirmation
a)
Create a pre-
commencement Site Inspection checklist. Include all the essential
things to confirm prior to build commencement, including a check to confirm any approved variations to original designs. You may use a template or create your own. It must be at an acceptable industry standard. b)
Record and submit a video of yourself completing a pre-
commencement site inspection. Check the site and observe all existing conditions. Complete the checklist while recording the video. Explain each item as you inspect it. The video recording must be submitted to your assessor. Submit a copy of your completed Pre-
Commencement Site Inspection checklist.
Satisfactory
Not yet satisfactory
6
Footings: Earthworks
Study the plans and specifications and determine the specific earthworks and footing or slab configuration required for this project.
Satisfactory
Not yet satisfactory
7
Footings: Prepare the site
Satisfactory
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
OFFICI
AL
OFFICI
AL
Project Worksheet
Task
Portfolio requirements
Response
Satisfactory
(S)
Not satisfactory
(NS)
The plan for cut and fill, excavation and compaction must comply
with the geotechnical report. a.
Explain here how you achieved this in relation to the plans and specifications. b.
What planning and coordination was required to ensure the correct cut and fill, excavation and compaction took place according to the plans and specifications?
Ensure you attach the geotechnical report for this project.
Not yet satisfactory
OFFICI
AL
OFFICI
AL
Project Worksheet
Task
Portfolio requirements
Response
Satisfactory
(S)
Not satisfactory
(NS)
8
Footings: Set out
You are required to set out of footings for the building against the requirements in the building plans. a)
Take photographs of the site and the footings that show how they have been set out according to the building plans. b)
For each photograph, explain how the footings have been set out in accordance with the building plans. Submit photos
Satisfactory
Not yet satisfactory
9
Footings: Assess
Once the footings are laid:
a)
Document how you
checked that they were laid as specified in the plans and specification documentation. b)
Document how you
assessed the performance of the footing components
for structural integrity. c)
Record a video of you checking the laid footings and submit the video to your assessor. d)
Attach all project documentation as it
will be used as Satisfactory
Not yet satisfactory
OFFICI
AL
OFFICI
AL
Project Worksheet
Task
Portfolio requirements
Response
Satisfactory
(S)
Not satisfactory
(NS)
evidence
Submit video recording and relevant documentation.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
OFFICI
AL
OFFICI
AL
Project Worksheet
Task
Portfolio requirements
Response
Satisfactory
(S)
Not satisfactory
(NS)
10
Footings: Compliance
a)
Document how you
assessed the footings for compliance with building and construction regulations, standards and codes.
b)
Check the implementation of damp coursing and
the provision of termite barriers against the NCC and the Australian standards. c)
Take and submit photographs of each step that you undertook to check the implementation of the damp coursing and the provision of termite barriers and explain what was involved in the checking of that stage. Attach any other relevant
documentation as evidence
Satisfactory
Not yet satisfactory
11
Flooring: Specifications
Identify and describe the flooring systems specified in the plans and specifications. Include reference to materials, components and configuration
Satisfactory
Not yet satisfactory
12
Flooring: Footing type and tie-down
Satisfactory
OFFICI
AL
OFFICI
AL
Project Worksheet
Task
Portfolio requirements
Response
Satisfactory
(S)
Not satisfactory
(NS)
Describe the footing types and tie-down details specified in the plans and specifications. What specific planning and coordination process
was required to ensure correct installation?
Not yet satisfactory
OFFICI
AL
OFFICI
AL
Project Worksheet
Task
Portfolio requirements
Response
Satisfactory
(S)
Not satisfactory
(NS)
13
Flooring: Laying
a.
Explain how you supervised the laying of
the specified floor system.
b.
Document how you checked that the flooring system was laid as specified in the plans and specification documentation. c.
Document how you assessed the performance of the flooring system components for structural integrity. Include photographs of the different stages of the floor system being laid and explain what each photograph represents
Satisfactory
Not yet satisfactory
14
Flooring: Assess
a.
Assess the concrete slab or bearers and joists specified in the building plans for structural integrity and compliance with the relevant National Construction Code,
specifically, how the flooring meets requirements for a.
climate zone
b.
fire resistance c.
rising damp
b.
Check the laying of
the floor system specified in the Satisfactory
Not yet satisfactory
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
OFFICI
AL
OFFICI
AL
Project Worksheet
Task
Portfolio requirements
Response
Satisfactory
(S)
Not satisfactory
(NS)
building plans for compliance with the project documentation
Include photographs of your assessment process. For each photograph explain the step that you are undertaking and the outcome of your assessment of the concrete slab/bearers and joists and that the laying of the floor meets the specifications in the building plans and other project documentation
OFFICI
AL
OFFICI
AL
Project Worksheet
Task
Portfolio requirements
Response
Satisfactory
(S)
Not satisfactory
(NS)
15
Walls: Specifications
Study the wall systems in the plans and specifications. Identify and describe the wall systems required for the build, including structural
and non-structural.
Satisfactory
Not yet satisfactory
16
Walls: Compliance
Identify the materials required by the specified wall systems.
Inspect the materials required for framing. Explain how you ensure the materials (required for timber and steel framing and structural steel members) meet the
Performance Requirements of the NCC, and timber framing
complies with AS 1684 Residential timber-
framed construction.
Satisfactory
Not yet satisfactory
17
Walls: Method
Identify the method used
for the construction of the frame and explain the processes that you have in place to manage and ensure the quality of
the frame.
Satisfactory
Not yet satisfactory
18
Walls: Plan and install
You are to take a video recording of the wall installation:
a.
Start with yourself explaining how you
Satisfactory
Not yet satisfactory
OFFICI
AL
OFFICI
AL
Project Worksheet
Task
Portfolio requirements
Response
Satisfactory
(S)
Not satisfactory
(NS)
planned the installation of the structural and non-
structural walls. Refer to all the components listed below.
b.
Record yourself checking the completed components for compliance with the relevant Australian standards, codes and where relevant
the manufacturer’s specifications (attach copies if relevant)
Components:
Bracing requirements
Tie downs
Tolerances and allowances
Fixing and installation of components
Vapour permeable sarking or a waterproof membrane relevant
to the construction method.
Submit the video recording
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
OFFICI
AL
OFFICI
AL
Project Worksheet
Task
Portfolio requirements
Response
Satisfactory
(S)
Not satisfactory
(NS)
19
Walls: Services
You are to take a video recording of yourself explaining how you identified and implemented allowances
for services to be installed within the wall system.
Satisfactory
Not yet satisfactory
20
Walls: windows and doors
Explain how you checked the compliance of installation of windows
and doors with building and construction standards and code and manufacturer’s specifications.
Satisfactory
Not yet satisfactory
21
Roof: Specifications
From the plans and specifications, identify the type of structural roof
system of roof system components specified.
a.
Explain how they comply with performance requirements of NCC. Explain how you have determined this and identify the codes and construction principles that you have assessed them against
Satisfactory
Not yet satisfactory
22
Roof: Build 1 - Structure
a.
Explain how you planned the erection of structural roof, roof trusses or hand cut roof
members being Satisfactory
Not yet satisfactory
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
OFFICI
AL
OFFICI
AL
Project Worksheet
Task
Portfolio requirements
Response
Satisfactory
(S)
Not satisfactory
(NS)
installed for compliance
with the requirements of the building plan, the
type of roof being constructed and the NCC codes and industry standards.
b.
You are to record a video of yourself explaining the implementing and checking the erection of structural roof, roof trusses or hand cut roof
members being installed. During the recording explain each step in the process. Submit video recording
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
OFFICI
AL
OFFICI
AL
Project Worksheet
Task
Portfolio requirements
Response
Satisfactory
(S)
Not satisfactory
(NS)
23
Roof: Build 2 - Finishes
a)
Explain how you planned the installation of roof sarking and cladding, skylights, roof
ventilators ensuring compliance with the requirements of the building plan, the type of roof being constructed and the NCC codes and industry standards.
b)
Explain the process used to ensure a quality finish
c)
You are to take a video
recording of yourself implementing and checking the installation of roof sarking and cladding, skylights, roof ventilators installed. During the video explain each step in the
process and how a quality finish to the roof
system was managed and ensured. Submit video recording
Satisfactory
Not yet satisfactory
24
Cladding: Assess
Assess the structural performance of cladding to be used for bracing in the frame construction as specified in the building’s plan for compliance with the relevant codes and construction principles. Explain how you have assessed this and identify the codes and construction principles Satisfactory
Not yet satisfactory
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
OFFICI
AL
OFFICI
AL
Project Worksheet
Task
Portfolio requirements
Response
Satisfactory
(S)
Not satisfactory
(NS)
that you have assessed them against.
25
Cladding: Compliance
Explain how the cladding, vapour permeable sarking or waterproof membrane and components specified in the plans and specifications meets
the Performance Requirements of NCC
Satisfactory
Not yet satisfactory
26
You are to take a video recording of yourself supervising and checking the installation of the specified cladding.
In the recording explain how the installation complies with building and construction standards, code and industry-accepted industry practices.
Satisfactory
Not yet satisfactory
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
OFFICI
AL
OFFICI
AL
What to submit
Item
Self Check
Project worksheet with complete responses to all questions as required regarding each step of the project. Project documentation including but not limited to:
permits
specifications
title
plans
geotechnical report
Consultation documentation including but not limited to:
emails
notes from meetings/recordings of meetings
letters
quotes
Completed Pre-Commencement Site Inspection checklist
Photographs of footings
Video recording of Learner checking the footings against the project documentation
Photographs of implementation of damp coursing and the provision of termite barriers
Photographs of the different stages of the floor system being laid
Assessing the concrete slab or bearers and joists specified in the building plans for structural integrity and compliance with the relevant codes.
Checking the laying of the floor system specified in the building plans for compliance with the project documentation. Video recording explaining how the Learner planned and implemented the following
components of the structural and non-structural walls.
Application of bracing requirements
Application of tie downs
Application of tolerances and allowances
Fixing and installation of components
Vapour permeable sarking or a waterproof membrane relevant to the construction method.
Video recording explaining how the Learner identified and implemented allowances
for services to be installed within the wall system
Video recording of the Learner implementing and checking the erection of structural
roof, roof trusses or hand cut roof members being installed.
Video recording of the Learner implementing and checking the installation of roof sarking and cladding, skylights, roof ventilators installed.
Video recording of the Learner supervising and checking the installation of the specified cladding.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help