OFFICI AL OFFICI AL OFFICIAL Student PORTFOLIO ASSESSMENT TASK Student guide © Box Hill Institute Document last reviewed: 07/03/2022 Template Version 2.2022 OFFICIAL
OFFICI AL OFFICI AL OFFICIAL Assessment cover sheet This form must be attached to the front of all submitted hard copy assessments. Student details: Student to complete Student name Student ID Student declaration By signing below, I declare that the work submitted here is my own work and it does not include work which is plagiarised, copied in whole or in part from another student or other source such as published books, internet or journals without due acknowledgement in the text. Student signature Date Assessment details: Teacher to complete Course national ID and title CPC50220 – Diploma of Building and Construction (Building) CPC40120 – Certificate IV in Building and Construction Unit/s national ID and title CPCCBC4010 – Apply structural principles to residential and commercial constructions Assessment task number and name 2 of 2 Portfolio assessment task Pre-requisite unit/s Nil Date due Date submitted Assessor name OFFICIAL RTO No. 4687 CRICOS Provider No. 02411J Version 2.2022 Page 1 of 9
OFFICI AL OFFICI AL Assessment result and feedback Result Satisfactory Not yet satisfactory Re-submit date if required Feedback Assessor’s signature Date Assessment review If you believe that you have been assessed unfairly, you have the right to request an informal assessment review. When your assessment cover sheet is returned to you, you can request an informal review by filling in the section below and returning it to your assessor or the Operations Manager of your area. If you are not satisfied with the outcome, you can apply for a formal review of assessment on the application form located on the Box Hill Institute Website. I request a review of my assessment for the following reasons: Student signature Date
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
OFFICI AL OFFICI AL Instructions to student Assessment task number and name 2 of 2 Portfolio assessment task Description of assessment task This is 2 of 2 assessments you need to successfully complete to be deemed competent in this unit. In this assessment you will be required to demonstrate your ability to: Apply structural principles when planning the erection or demolition of a structure Analyse and plan for the structural integrity of Class 1 and Class 10 buildings Plan, coordinate and manage the laying of footings Plan, coordinate and manage the laying of floor system Plan, coordinate and manage the building of structural and non-structural wall systems Plan, coordinate and manage the building of roof system Plan, coordinate and manage the external wall cladding of structure Full details of the tasks are provided in the task instructions below. Conditions of assessment Time allowed As prescribed Pre-requisite unit(s) Nil Where the assessment will take place Take home assessment Individual or group work Individual Support equipment allowed i.e.: calculator, dictionary Access to: computer with internet access Learner Resources via LMS • Microsoft Word or compatible word processing app a construction project (Residential - Class 1 and 10 buildings, maximum two storeys OR Commercial - Class 2 to 9, Type C only constructions) in the workplace or simulated environment Context and conditions of assessment Complete it individually, answering all questions and submit your answers electronically according to task intructions and complete by the specified deadline Use provided example or learner to provide their own project documentation Submission instructions What to submit Answer all questions
OFFICI AL OFFICI AL Instructions to student How to submit Submit your answers electronically via the LMS in PDF format How to present your work Filled In PDF format How many attempts at assessment are permitted Three Level of assistance permitted If you have any questions about the task or concerns about your ability to complete the task, please discuss this with your assessor. Assessment to be completed individually. How will the assessment judgement be made Observation checklist Exemplar Performance checklist Rubric Answer guide Benchmarks Safety If at any time during the learning and assessment process, your Teacher/Assessor considers that the safety of any person is at risk they will abort the session. Reasonable adjustment You may access reasonable adjustment to enable you to participate in training and assessment. You can learn more about student welfare and disadvantage through the Student disability policy and procedure on the Box Hill Institute website or by calling Student Life on 9286 9891, SMS on 0429 680 488, or by emailing the Disability liaison service on dls@boxhill.edu.au or by calling into the Student Life office at Elgar campus in B3.224. More information is available on https://studentweb.bhtafe.edu.au/studenthub . You can contact Access and Disability Support at CAE city campus on 8892 1612 or email dls@boxhill.edu.au or calling into the Student Life office at the city campus in C1.202. Reasonable adjustments of the task for those who do not have access to a working job site will be to utilise plans provided to answer the Worksheet Tasks. Videos may be left out in most cases with sufficient pictures to be used in a show and tell format. Special consideration Where a student anticipates that a result will be impacted by special circumstances such as ill health or bereavement, application can be made for special consideration. Forms can be accessed from the
OFFICI AL OFFICI AL Instructions to student Student Life office at Elgar Campus in B3.224 or download the special consideration application form .
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
OFFICI AL OFFICI AL Assessment task 2 Task instructions This assessment allows you to apply your skills and knowledge to the planning, coordination and management of a construction project. The construction project can occur in your workplace or simulated environment. If you’re unable to apply this to your workplace (for example, current building projects do not align with the requirements of the assessment, or you do not have access to a workplace), discuss alternatives with your teacher/assessor. This unit must be carried out over the course of a construction project to include all parts of the project worksheet. In addition to completing the project worksheet, you will also submit documents relating to the construction project, video recordings and photographs as required by the project worksheet. The work must be your own work. This project must be completed in full. Responses should apply directly to your workplace. This project is to be completed based on the construction of a Residential (Class 1 and 10 buildings, maximum two storeys). Work through the Project Worksheet to guide the required information for each stage of the building. The project stages cover: Assessing the structural integrity of the construction project – includes confirming compliance with general requirement and performance requirements of NCC Planning and documenting the structural principles of the construction of a building Pre-commencement site inspection to confirm analysis Applying the technical construction principles and concepts to the appropriate selection, integration and building of construction elements and components Planning, coordinating, implementing and checking the installation of footings, flooring, walls, roof systems and cladding You are required to submit copies of the site plans and other relevant documentation as evidence for this project. On-site video and photographs are a key form of evidence required for assessment and will be assessed through observation by your assessor. These are outlined throughout the project worksheet and the “What to Submit” section
OFFICI AL OFFICI AL Project Worksheet Task Portfolio requirements Response Satisfactory (S) Not satisfactory (NS) 1 Analysis: class From the plans, drawings and specifications, determine the following (in reference to the NCC): the class of the building intended use climate zone classification Submit all project plans, drawings and associated documentation. Satisfactory Not yet satisfactory 2 Analysis: environment From the plans and specifications, confirm compliance with NCC environment requirements including: bushfire high wind earthquake alpine Satisfactory Not yet satisfactory 3 From the plans and specifications, and your knowledge of building standards and codes, explain the building design and specific issues relating to structural integrity. Start with soil conditions, footing plans, beams, supports and loads, bracing, beams, members, etc., then make sure you identify any additional structural integrity issues unique to/critical to the Satisfactory Not yet satisfactory
OFFICI AL OFFICI AL Project Worksheet Task Portfolio requirements Response Satisfactory (S) Not satisfactory (NS) construction project. Refer to specific plans, drawings and specifications and documents including soil report, structural drawings and computations. Specify the NCC codes referring to each item you identify. Submit any additional project documentation used to support your findings.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
OFFICI AL OFFICI AL Project Worksheet Task Portfolio requirements Response Satisfactory (S) Not satisfactory (NS) 4 Analysis: Options and variations Builders often look at possible variations to building proposals that potentially introduce a range of benefits to the project such as time and cost savings, while maintaining or improving quality and compliance. For example, the project soil report might recommend a conventional raft slab, but your company specialises in contemporary waffle pod slabs which can be installed quicker and cheaper. This alternative must be referred to and approved by the structural engineer, and all drawing amendments approved by the building surveyor. Did your project install alternative structural material that was different to the original plans? This can be in regard to any structural component. The alternative must be considered a new or more recent or emerging material or approach or technology compared to Satisfactory Not yet satisfactory
OFFICI AL OFFICI AL Project Worksheet Task Portfolio requirements Response Satisfactory (S) Not satisfactory (NS) the original. If so, explain the process you followed to: identify the opportunity for a possible alternative determine the reason for the alternative confirm that the alternative complied with structural integrity standards and codes to at least the same level or higher than the original seek approval from structural engineer and building surveyor Explain the outcome - what happened - and report on the benefits to the project. Submit evidence of engagement with industry professionals. If this did not occur, use the example of the alternative slab and explain how you would go about implementing this variation based on the same points above. Create a sample email to show how you would communicate the changes to the structural engineer and building surveyor.
OFFICI AL OFFICI AL Project Worksheet Task Portfolio requirements Response Satisfactory (S) Not satisfactory (NS) 5 Planning: confirmation a) Create a pre- commencement Site Inspection checklist. Include all the essential things to confirm prior to build commencement, including a check to confirm any approved variations to original designs. You may use a template or create your own. It must be at an acceptable industry standard. b) Record and submit a video of yourself completing a pre- commencement site inspection. Check the site and observe all existing conditions. Complete the checklist while recording the video. Explain each item as you inspect it. The video recording must be submitted to your assessor. Submit a copy of your completed Pre- Commencement Site Inspection checklist. Satisfactory Not yet satisfactory 6 Footings: Earthworks Study the plans and specifications and determine the specific earthworks and footing or slab configuration required for this project. Satisfactory Not yet satisfactory 7 Footings: Prepare the site Satisfactory
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
OFFICI AL OFFICI AL Project Worksheet Task Portfolio requirements Response Satisfactory (S) Not satisfactory (NS) The plan for cut and fill, excavation and compaction must comply with the geotechnical report. a. Explain here how you achieved this in relation to the plans and specifications. b. What planning and coordination was required to ensure the correct cut and fill, excavation and compaction took place according to the plans and specifications? Ensure you attach the geotechnical report for this project. Not yet satisfactory
OFFICI AL OFFICI AL Project Worksheet Task Portfolio requirements Response Satisfactory (S) Not satisfactory (NS) 8 Footings: Set out You are required to set out of footings for the building against the requirements in the building plans. a) Take photographs of the site and the footings that show how they have been set out according to the building plans. b) For each photograph, explain how the footings have been set out in accordance with the building plans. Submit photos Satisfactory Not yet satisfactory 9 Footings: Assess Once the footings are laid: a) Document how you checked that they were laid as specified in the plans and specification documentation. b) Document how you assessed the performance of the footing components for structural integrity. c) Record a video of you checking the laid footings and submit the video to your assessor. d) Attach all project documentation as it will be used as Satisfactory Not yet satisfactory
OFFICI AL OFFICI AL Project Worksheet Task Portfolio requirements Response Satisfactory (S) Not satisfactory (NS) evidence Submit video recording and relevant documentation.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
OFFICI AL OFFICI AL Project Worksheet Task Portfolio requirements Response Satisfactory (S) Not satisfactory (NS) 10 Footings: Compliance a) Document how you assessed the footings for compliance with building and construction regulations, standards and codes. b) Check the implementation of damp coursing and the provision of termite barriers against the NCC and the Australian standards. c) Take and submit photographs of each step that you undertook to check the implementation of the damp coursing and the provision of termite barriers and explain what was involved in the checking of that stage. Attach any other relevant documentation as evidence Satisfactory Not yet satisfactory 11 Flooring: Specifications Identify and describe the flooring systems specified in the plans and specifications. Include reference to materials, components and configuration Satisfactory Not yet satisfactory 12 Flooring: Footing type and tie-down Satisfactory
OFFICI AL OFFICI AL Project Worksheet Task Portfolio requirements Response Satisfactory (S) Not satisfactory (NS) Describe the footing types and tie-down details specified in the plans and specifications. What specific planning and coordination process was required to ensure correct installation? Not yet satisfactory
OFFICI AL OFFICI AL Project Worksheet Task Portfolio requirements Response Satisfactory (S) Not satisfactory (NS) 13 Flooring: Laying a. Explain how you supervised the laying of the specified floor system. b. Document how you checked that the flooring system was laid as specified in the plans and specification documentation. c. Document how you assessed the performance of the flooring system components for structural integrity. Include photographs of the different stages of the floor system being laid and explain what each photograph represents Satisfactory Not yet satisfactory 14 Flooring: Assess a. Assess the concrete slab or bearers and joists specified in the building plans for structural integrity and compliance with the relevant National Construction Code, specifically, how the flooring meets requirements for a. climate zone b. fire resistance c. rising damp b. Check the laying of the floor system specified in the Satisfactory Not yet satisfactory
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
OFFICI AL OFFICI AL Project Worksheet Task Portfolio requirements Response Satisfactory (S) Not satisfactory (NS) building plans for compliance with the project documentation Include photographs of your assessment process. For each photograph explain the step that you are undertaking and the outcome of your assessment of the concrete slab/bearers and joists and that the laying of the floor meets the specifications in the building plans and other project documentation
OFFICI AL OFFICI AL Project Worksheet Task Portfolio requirements Response Satisfactory (S) Not satisfactory (NS) 15 Walls: Specifications Study the wall systems in the plans and specifications. Identify and describe the wall systems required for the build, including structural and non-structural. Satisfactory Not yet satisfactory 16 Walls: Compliance Identify the materials required by the specified wall systems. Inspect the materials required for framing. Explain how you ensure the materials (required for timber and steel framing and structural steel members) meet the Performance Requirements of the NCC, and timber framing complies with AS 1684 Residential timber- framed construction. Satisfactory Not yet satisfactory 17 Walls: Method Identify the method used for the construction of the frame and explain the processes that you have in place to manage and ensure the quality of the frame. Satisfactory Not yet satisfactory 18 Walls: Plan and install You are to take a video recording of the wall installation: a. Start with yourself explaining how you Satisfactory Not yet satisfactory
OFFICI AL OFFICI AL Project Worksheet Task Portfolio requirements Response Satisfactory (S) Not satisfactory (NS) planned the installation of the structural and non- structural walls. Refer to all the components listed below. b. Record yourself checking the completed components for compliance with the relevant Australian standards, codes and where relevant the manufacturer’s specifications (attach copies if relevant) Components: Bracing requirements Tie downs Tolerances and allowances Fixing and installation of components Vapour permeable sarking or a waterproof membrane relevant to the construction method. Submit the video recording
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
OFFICI AL OFFICI AL Project Worksheet Task Portfolio requirements Response Satisfactory (S) Not satisfactory (NS) 19 Walls: Services You are to take a video recording of yourself explaining how you identified and implemented allowances for services to be installed within the wall system. Satisfactory Not yet satisfactory 20 Walls: windows and doors Explain how you checked the compliance of installation of windows and doors with building and construction standards and code and manufacturer’s specifications. Satisfactory Not yet satisfactory 21 Roof: Specifications From the plans and specifications, identify the type of structural roof system of roof system components specified. a. Explain how they comply with performance requirements of NCC. Explain how you have determined this and identify the codes and construction principles that you have assessed them against Satisfactory Not yet satisfactory 22 Roof: Build 1 - Structure a. Explain how you planned the erection of structural roof, roof trusses or hand cut roof members being Satisfactory Not yet satisfactory
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
OFFICI AL OFFICI AL Project Worksheet Task Portfolio requirements Response Satisfactory (S) Not satisfactory (NS) installed for compliance with the requirements of the building plan, the type of roof being constructed and the NCC codes and industry standards. b. You are to record a video of yourself explaining the implementing and checking the erection of structural roof, roof trusses or hand cut roof members being installed. During the recording explain each step in the process. Submit video recording
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
OFFICI AL OFFICI AL Project Worksheet Task Portfolio requirements Response Satisfactory (S) Not satisfactory (NS) 23 Roof: Build 2 - Finishes a) Explain how you planned the installation of roof sarking and cladding, skylights, roof ventilators ensuring compliance with the requirements of the building plan, the type of roof being constructed and the NCC codes and industry standards. b) Explain the process used to ensure a quality finish c) You are to take a video recording of yourself implementing and checking the installation of roof sarking and cladding, skylights, roof ventilators installed. During the video explain each step in the process and how a quality finish to the roof system was managed and ensured. Submit video recording Satisfactory Not yet satisfactory 24 Cladding: Assess Assess the structural performance of cladding to be used for bracing in the frame construction as specified in the building’s plan for compliance with the relevant codes and construction principles. Explain how you have assessed this and identify the codes and construction principles Satisfactory Not yet satisfactory
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
OFFICI AL OFFICI AL Project Worksheet Task Portfolio requirements Response Satisfactory (S) Not satisfactory (NS) that you have assessed them against. 25 Cladding: Compliance Explain how the cladding, vapour permeable sarking or waterproof membrane and components specified in the plans and specifications meets the Performance Requirements of NCC Satisfactory Not yet satisfactory 26 You are to take a video recording of yourself supervising and checking the installation of the specified cladding. In the recording explain how the installation complies with building and construction standards, code and industry-accepted industry practices. Satisfactory Not yet satisfactory
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
OFFICI AL OFFICI AL What to submit Item Self Check Project worksheet with complete responses to all questions as required regarding each step of the project. Project documentation including but not limited to: permits specifications title plans geotechnical report Consultation documentation including but not limited to: emails notes from meetings/recordings of meetings letters quotes Completed Pre-Commencement Site Inspection checklist Photographs of footings Video recording of Learner checking the footings against the project documentation Photographs of implementation of damp coursing and the provision of termite barriers Photographs of the different stages of the floor system being laid Assessing the concrete slab or bearers and joists specified in the building plans for structural integrity and compliance with the relevant codes. Checking the laying of the floor system specified in the building plans for compliance with the project documentation. Video recording explaining how the Learner planned and implemented the following components of the structural and non-structural walls. Application of bracing requirements Application of tie downs Application of tolerances and allowances Fixing and installation of components Vapour permeable sarking or a waterproof membrane relevant to the construction method. Video recording explaining how the Learner identified and implemented allowances for services to be installed within the wall system Video recording of the Learner implementing and checking the erection of structural roof, roof trusses or hand cut roof members being installed. Video recording of the Learner implementing and checking the installation of roof sarking and cladding, skylights, roof ventilators installed. Video recording of the Learner supervising and checking the installation of the specified cladding.