Assignment-2
1
Fanshawe College
CONS- 6003- (20-21)-23F-Construction Project Management Fundamentals
Assignment: Part I:
Instructor: Hazar Sasila
Student ID & Names:
Anmol Tiwari
1173316
PROJECT: Construction method
2023, September 21
st
Assignment-2
2
1.
List ICI project types in Canada with examples?
Answer: ICI stands for Institutional Commercial and Industrial buildings in Canada
examples of Institutional buildings are:
•
Hospitals
•
Libraries
•
Religious buildings
•
Government buildings
•
Educational buildings
Commercial:
•
Shopping malls
•
Theatres
•
Plazas
•
Resorts
•
Hotels
•
Offices
Industrial:
•
Production plants
•
Factories
•
Oil refineries
2.
Fill the following missing words:
a.
Low rise building:
1-4 Floors
b.
Mid-size building:
5-12 Floors
c.
High rise building:
13 and more Floors
3.
Bungalow house has
Single/one
storey/s
4.
As an example of construction definition, fill the following words:
a.
Low rise building
: The Process.
b.
Residential:
The Industry.
c.
Steel structure with curtain wall
: The method and materials.
5.
What is CMAR in construction
Answer: The construction sector uses the project delivery approach known as Construction
Manager at Risk (CMAR). In CMAR, the construction manager collaborates with the owner
and architect from the very beginning of the project's design phase. Construction managers
are responsible for controlling construction risks and completing projects within a guaranteed
maximum price (GMP). They offer cost estimates, timetables, and risk management.
Assignment-2
3
6.
Can Canadian government perform 3P as construction method?
Answer: Yes, the Canadian government is permitted to use 3P public-private partnerships for
building. Typically, public infrastructure projects like roads, hospitals, and schools are
financed, designed, built, and operated in collaboration between the government and private
enterprises with duties and risks distributed equally.
7.
DBB generally used on complicated projects?
a.
False
8.
Integrated project delivery IPD when the owner selects a designer where this designer
selects the construction manager prior to the kick-off of the project design.
a.
False
9.
IPD is the best suited for project in private sector that are complex under tight schedule
a.
True
10.
Give example of construction method PPP (not mentioned in the lecture)?
Public-private partnerships (PPPs) are often employed in Canada for infrastructure
development projects. The building of the Royal Alberta Museum in Edmonton, Alberta,
serves as an illustration. To develop, construct, and run the museum, the government
collaborated with private businesses. The government kept ownership, but the private sector
was able to provide management and building experience. Through cooperation and risk-
sharing, it sought to efficiently, on-time, and cost-effectively complete the project.