Assessment Task 3 Undertake project work BSBPMG430 Student Declaration To be filled out and submitted with assessment responses
I declare that this task and any attached document related to the task is all my own work and I have not cheated or plagiarised the work or colluded with any other student(s) I understand that if I am found to have plagiarised, cheated or colluded, action will be taken against me according to the process explained to me I have correctly referenced all resources and reference texts throughout these assessment tasks. I have read and understood the assessment requirements for this unit I understand the rights to re-assessment I understand the right to appeal the decisions made in the assessment Unit Title Unit Code Student name Student ID number Student signature Date Task Number ------OFFICE USE ONLY----- For Trainer and Assessor to complete: Student requested reasonable adjustment for the assessment BSBPMG430 - Undertake project work V3 2021 Page 2 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Completed successfully Did the student satisfactorily: Comments Y N DNS The student has satisfactorily completed and submitted the following: Risk Assessment form - at 25% timeframe in Task 3.1 Issues log - at 50% timeframe in Task 3.1 Change request form - at 50% timeframe in Task 3.1 Status Report - at 25% timeframe in Task 3.1 Status Report - at 50% timeframe in Task 3.1 Status Report - at 75% timeframe in Task 3.1 Training session planning notes in Task 3.2 Feedback from team members in Task 3.2 Post-project review meeting in Task 3.3 Budget variation report in Task 3.3 Post-project review report in Task 3.3 Sign-off for concluding the project from project sponsor in Task 3.3 Demonstrated ability to: Establish and maintain required recordkeeping systems throughout the project This is evidenced by: Reports developed in Task 3.1 Project finalisation documents developed in Task 3.3 Demonstrated ability to: Implement and monitor plans BSBPMG430 - Undertake project work V3 2021 Page 3 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Completed successfully Did the student satisfactorily: Comments Y N DNS for managing the project Undertake risk management as required This is evidenced by: Risk Assessment form - at 25% timeframe in Task 3.1 Issues log - at 50% timeframe in Task 3.1 Change request form - at 50% timeframe in Task 3.1 Status Report - at 25% timeframe in Task 3.1 Status Report - at 50% timeframe in Task 3.1 Status Report - at 75% timeframe in Task 3.1 Demonstrated ability to: Document feedback and suggested improvements Document feedback and suggested improvements This is evidenced by: Feedback from the project team in Task 3.2 The student delivered the training session to the project team. Feedback in comments. Demonstrated ability to: Provide support to team members to enable them to achieve deliverables and to transition them as appropriate at the completion of the project This is evidenced by: Training session planning notes in Task 3.2 BSBPMG430 - Undertake project work V3 2021 Page 4 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Completed successfully Did the student satisfactorily: Comments Y N DNS Delivery of training session (Refer to Marking Sheet) Feedback from team members in Task 3.2 Demonstrated ability to: Complete project documentation Review project outcomes and processes against the project scope and plan This is evidenced by: Feedback from team members in Task 3.2 Post-project review meeting in Task 3.3 Budget variation report in Task 3.3 Post-project review report in Task 3.3 The student attended the project finalisation meeting with the project sponsor and obtained sign- offs for concluding the project: Final Project Budget Review ☐ Staff transition noted ☐ Project review report ☐ Project is fully finalised ☐ When collaborating with the group, the student has actively participated in group work with a substantial contribution that can be assessed individually for all this task's requirements. Task Outcome: Satisfactory Not Yet Satisfactory ☐ Student Name: BSBPMG430 - Undertake project work V3 2021 Page 5 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Completed successfully Did the student satisfactorily: Comments Y N DNS Assessor Name : Assessor Signature: Date: Table of Content Student Declaration ........................................................................................................................................... 2 Task 3 – Administer, monitor and finalise the project ............................ 7 Task 3.1 Monitor project progress ............................................................................................................. 9 Task 3.2 Support the project team .......................................................................................................... 22 Task 3.3 Finalise and review the project ............................................................................................. 24 References ............................................................................................................................................................. 28 BSBPMG430 - Undertake project work V3 2021 Page 6 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Task 3 – Administer, monitor and finalise the project Task summary and instructions What is this assessment task about? This task builds on Task 2. This task comprises of the following assessment methods: o Product-based o Direct observation of Role-Play o Case Study o Other (specify) It has been designed to evaluate your ability to/competency in: Establish and maintain required recordkeeping systems throughout the project Implement and monitor plans for managing the project Undertake risk management as required Provide support to team members to enable them to achieve deliverables and to transition them as appropriate at completion of the project Complete financial recordkeeping associated with project and confirm according to agreed budget Complete project documentation and obtain sign-offs for concluding project Review project outcomes and processes against the project scope and plan Document feedback and suggested improvements You are required to address the following: Task 3.1 Monitor the project o Address project execution scenarios and complete required reporting Task 3.2 Support the project team o Deliver a training session for the team Task 3.3 Finalsie and review the project o Complete project finalisation documentation BSBPMG430 - Undertake project work V3 2021 Page 7 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Task summary and instructions o Obtain sign-off to close the project Although the assessment requires group collaboration to simulate a work environment, the assessment submission is individual, and it will be marked as such. What do I need to do to complete this task satisfactorily? submit the completed assessment tasks, according to instructions, complete the tasks with sufficient detail and present them in a professional manner, use your own words and reference sources appropriately, meet the word count where required, use the scenario provided, use the templates provided where required, for your performance to be deemed satisfactory in this assessment task you must satisfactorily address all of the assessment criteria, if part of this task is not satisfactorily completed you will be asked to complete further assessment to demonstrate satisfactory performance. Specifications You must deliver/participate in: Training session (Role-Play) for the team in week 5 Meeting with the team in week 5 (Role-Play) Meeting with the project sponsor (Role-Play) in week 6 You must submit to GOALS Risk Assessment form - at 25% timeframe Issues log - at 50% timeframe Change request form - at 50% timeframe Status Report - at 25% timeframe Status Report - at 50% timeframe Status Report - at 75% timeframe Training session planning notes Feedback from team members Post-project review meeting Budget variation report in Post-project review report BSBPMG430 - Undertake project work V3 2021 Page 8 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Task summary and instructions Sign-off for concluding the project from the project sponsor Resources and equipment Computer with Internet access Access to Microsoft Office suites or similar software Learning material Scenario for assessment as provided Appendices as provided Relevant policies and procedures as provided Templates as provided Re-submission opportunities You will be provided feedback on your performance by the Assessor. The feedback will indicate if you have satisfactorily addressed the requirements of each part of this task. If any parts of the task are not satisfactorily completed, the assessor will explain why, and provide you written feedback along with guidance on what you must undertake to demonstrate satisfactory performance. Re-assessment attempt(s) will be arranged at a later time and date. You have the right to appeal the outcome of assessment decisions if you feel that you have been dealt with unfairly or have other appropriate grounds for an appeal. You are encouraged to consult with the assessor prior to attempting this task if you do not understand any part of this task or if you have any learning issues or needs that may hinder you when attempting any part of the assessment. Complete the following activities: Task 3.1 Monitor project progress Assume the following scenarios occurred when implementing the project: Scenarios 25% timeframe The following has occurred: 2 project team members are ill and will be on sick leave for 1 week A glitch in the CRM (Customer Relationship Management System) used in the organisation (which is also used to BSBPMG430 - Undertake project work V3 2021 Page 9 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Scenarios gather data for project reporting) has caused the data to be inputted incorrectly for 3 days. The data will have to be double-checked for accuracy and correctness, 1 project team member must go back to his/her old role and help resolve the issue for 2 days. 50% timeframe The following has occurred: the team has been required to work additional hours due to the flu forcing several team members to ask for sick days at different times, an error in estimating an item in the budget has caused an increase in budget by 8%, the schedule is now one week behind, the course development firm engaged to design the courses is delivering their work 4 weeks late, the team member explicitly employed for the project has resigned. 75% timeframe The following has occurred: o the project team is fully operating again, o a new external project team member has been appointed, o the project manager has decided to conduct additional training on WHS for the team, the project sponsor has agreed on this, and it will increase the budget by $500.00, o a public holiday was not reported in the project schedule, and this will affect 2 workdays, o a spelling mistake was found in one of the communication material developed for the project. The project sponsor requested for the material to be corrected and printed again. This will cause a one week delay in the project schedule and an increase in budget by 5 %. Develop the following reports to meet the recordkeeping system requirements: 1. A risk assessment form to the project manager's attention for the risk identified at 25% timeframe. (Template 1), 2. An issue log for the issues arisen at 50% timeframe. (Template 2), 3. A change form to request the changes needed as part of the issue resolution strategy for the issues arisen at 50% timeframe. (Template 3), BSBPMG430 - Undertake project work V3 2021 Page 10 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
4. 3 status reports at 25%, 45%, 75% timeframe. Write a brief email with a summary of the reports' content when forwarding them to the project sponsor. (Templates 4,5,6). Template 1 - Risk Assessment form - at 25% timeframe Project details Project Name ZEEMH Coffee Lover Online Training Project Manager : Name of the project manager responsible for mitigating the risk. Risk details Risk ID: R001 Raised by: Name of the person who has raised the risk. Date raised: 10/09/2023 Description of risk : Briefly describe the identified risk and its possible impact on the project (e.g. scope, resources, deliverables, timelines and/or budgets). (30-50 words) Two project team members are on sick leave for one week, affecting project resources and timelines. A glitch in the CRM system has caused incorrect data input for three days, impacting data accuracy and potentially delaying project reporting and timelines. Likelihood of risk: Medium Impact of risk: Low to Medium BSBPMG430 - Undertake project work V3 2021 Page 11 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Risk mitigation Preventative actions recommended: Briefly describe any action that should be taken to prevent the risk from occurring. To prevent the impact of this risk, the following actions are recommended: Cross-training team members to ensure task continuity in case of illness. Conduct regular system maintenance and updates to minimize CRM glitches. Contingency actions recommended: In case the risk materializes, the following actions are recommended: Reassigning temporarily unavailable team members' tasks to others to maintain project progress. Performing a thorough data audit and correction process to rectify CRM data inaccuracies and minimize project reporting delays. Approval details Supporting documentation: No specific supporting documentation used to substantiate this risk at this stage. Signature: _______________________ Date: ___ /___ /____ PLEASE FORWARD THIS FORM TO THE PROJECT MANAGER Record Complete the filing record below so that the project document can be saved in the project management record system Project Title: Project Client: Date: Version: BSBPMG430 - Undertake project work V3 2021 Page 12 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Project Sponsor: Project Manager: File Name: Template 2 - Issues log - at 50% timeframe In this template, all issues are treated as risks. When they arise, they should be recorded and assigned a number and responsibility, a recovery strategy or alternate path agreed, acted upon, and recorded when closed. A minimum of 1 issue must be identified and treated. Issue Strategy Date logged Date resolved Team members requesting sick days due to flu Overtime work allocation, cross- training 2023-05-10 2023-05-15 Budget increased by 8% due to estimation error Budget adjustment, seeking approval 2023-05-12 2023-05-18 Project schedule is one week behind Schedule adjustment, additional resources 2023-05-15 2023-05-28 Course development firm delivering work 4 weeks late Follow-up with the firm, schedule adjustment 2023-05-20 2023-06-22 Resignation of a project team member Recruitment, reassignment of tasks 2023-05-25 2023-06-05 Signed: Project Manager Signed: Sponsor Signed: Client Signed: Date: Date: Date: Date: Record Complete the filing record below so that the project document can be saved in the project management record system. BSBPMG430 - Undertake project work V3 2021 Page 13 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Issue Strategy Date logged Date resolved Project Title: Project Client: Date: Version: Project Sponsor: Project Manager: File Name: Template 3 - Change request form - at 50% timeframe This form is used to assist with recording and managing changes in scope, time, quality or budget needed to address the issue/s. The change management procedure must be negotiated with the key stakeholders prior to the sign-off of the project plan. Change request – Project Issued by Budget Adjustment due to Estimation Error Change Requested An estimation error was identified in the project budget, resulting in an 8% increase in the overall project cost. This change request aims to adjust the budget to accommodate the increased cost. Reason for change There is no direct impact on the project scope as the change does not affect the project's objectives or deliverables. The project's scope remains unchanged. Impact on scope The change request involves an increase in the project budget by 8% to cover the previously underestimated costs. This amounts to an additional AU$ in project expenses. Impact on budget The schedule is not directly impacted by this change request. The project timeline and milestones remain the same. Impact on schedule Budget Adjustment due to Estimation Error Change authorised: Yes/No Adj. completion date: Adj. final budget: $ Signed: Signed Signed Signed BSBPMG430 - Undertake project work V3 2021 Page 14 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Change request – Project Project Manager Sponsor Client Date Date Date Date Record Complete the filing record below so that the project document can be saved in the project management record system. Project Title: Project Client: Date: Version: Project Sponsor: Project Manager: File Name: Template 4 - Status Report - at 25% timeframe Email to project sponsor: The ZEEMH Coffee Lover Online Training project is progressing well, with minor delays in web developer sourcing. We remain on schedule, within budget, and quality expectations. Project risk remains low. Details in the attached report. Best regards, Project manager <Add text (50-100 words) Project Name: Project Status G: Y: R: Overa ll Timelin e Budget Resource s Scop e Qualit y Risk Statu s Green Green Green Green Green Green Green BSBPMG430 - Undertake project work V3 2021 Page 15 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Status Report Project Name ZEEMH Coffee Lover Online Training Prepared by: Project manager Date: eptember 15, 2023 Attention to: Project sponsor Executive summary report Use this section for summary information about the status of the project. (30-50 words) The ZEEMH Coffee Lover Online Training project is currently in good standing. We are on schedule, within budget, and the project scope and quality are as planned. The overall project risk remains low. Deliverabl e status Use this section for summary information about the status of the deliverables of the project. Deliverable Work to date Planned realisation date Status Website Plan 90% September 20, 2023 On Schedule Web Developer Sourcing 70% September 25, 2023 Slightly Delayed Schedule status Use this section for a summary of the status of the project's schedule . Milestones and date Status Date completed Notes Project Kickoff On Schedule September 5, 2023 - Requirements Gathering On Schedule September 10, 2023 - BSBPMG430 - Undertake project work V3 2021 Page 16 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Status Report Budget status Use this section for a summary of the status of the project's budget Budget Item Estimated cost Actual Cost Variation % Personnel (Salaries and Wages) $100,000 $95,000 -5% Materials and Supplies $25,000 $27,000 +8% Quality status Use this section for a summary of the status of the project's quality. Deliverable Quality requiremen ts Status Variations or plan to achieve quality requirements Website Plan Meeting Expectations As Planned - Web Developer Sourcing Meeting Expectations As Planned - Record Complete the filing record below so that the project document can be saved in the project management record system Project Title: Project Client: Date: Version: BSBPMG430 - Undertake project work V3 2021 Page 17 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Project Sponsor: Project Manager: File Name: Template 5 - Status Report - at 50% timeframe Email to project sponsor: Project Status Update - ZEEMH Coffee Lover Online Training - 50% Timeframe Despite the flu affecting several team members, requiring additional work hours, we have encountered some challenges: An 8% budget increase due to an estimating error. A one-week delay in the project schedule. The course development firm is delivering their work four weeks late. A team member specifically employed for the project has resigned. We are actively addressing these challenges to minimize their impact on the project's overall progress. We remain committed to delivering a high-quality product within an adjusted timeframe. If you have any questions or require further information, please feel free to reach out. Best regards, <Add text (50-100 words) Project Name: Project Status G: Y: R: Overa ll Timelin e Budge t Resource s Scope Quality Risk Statu s One Week Behind Budget Increase (8%) Additional Hours Required As Planne d Meeting Expectation s Elevated Risk BSBPMG430 - Undertake project work V3 2021 Page 18 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Status Report Project Name ZEEMH Coffee Lover Online Training Prepared by: Project manager Date: S eptember 25, 2023 Attention to: Project sponsor Executive summary report Use this section for summary information about the status of the project. (30-50 words) Despite the flu affecting several team members, requiring additional work hours, we have encountered some challenges: An 8% budget increase due to an estimating error. A one-week delay in the project schedule. The course development firm is delivering their work four weeks late. A team member specifically employed for the project has resigned. Deliverabl e status Use this section for summary information about the status of the deliverables of the project. Deliverable Work to date Planned realisation date Status Website Plan 90% September 20, 2023 On Schedule Web Developer Sourcing 70% September 25, 2023 Slightly Delayed Schedule status Use this section for a summary of the status of the project's Milestones and date Status Date completed Notes Project Kickoff On Schedule September 5, 2023 - Requirements On Schedule September 10, - BSBPMG430 - Undertake project work V3 2021 Page 19 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Status Report schedule. Gathering 2023 Budget status Use this section for a summary of the status of the project's budget Budget Item Estimated cost Actual Cost Variation % Personnel (Salaries and Wages) $100,000 $108,000 +8% Materials and Supplies $25,000 $27,000 +8% Quality status Use this section for a summary of the status of the project's quality. Deliverable Quality requiremen ts Status Variations or plan to achieve quality requirements Website Plan Meeting Expectations As Planned - Web Developer Sourcing Meeting Expectations As Planned - Record Complete the filing record below so that the project document can be saved in the project management record system Project Title: Project Client: Date: Version: BSBPMG430 - Undertake project work V3 2021 Page 20 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Project Sponsor: Project Manager: File Name: Template 6 - Status Report - at 75% timeframe Email to project sponsor: Subject: Project Status Update - ZEEMH Coffee Lover Online Training - 75% Timeframe With the project team back in full operation, we have encountered some recent and significant developments. These developments have brought about new challenges and opportunities that we need to address and capitalize on. It is important for us to stay proactive and adapt to these changes in order to ensure the success and progress of our project. By embracing these developments, we can harness their potential and propel our project forward towards achieving our goals. <Add text (50-100 words) Project Name: Project Status G: Y: R: Overa ll Timelin e Budge t Resource s Scope Quality Risk Statu s Yellow One Week Behind Budget Increase (13%) Full Team Operational As Planne d Meeting Expectation s Elevated Risk Status Report Project Name ZEEMH Coffee Lover Online Training BSBPMG430 - Undertake project work V3 2021 Page 21 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Status Report Prepared by: Project manager Date: October 10 th 2023 Attention to: Project sponsor Executive summary report Use this section for summary information about the status of the project. (30-50 words) With the project team back in full operation, we have encountered some recent and significant developments. These developments have brought about new challenges and opportunities that we need to address and capitalize on. It is important for us to stay proactive and adapt to these changes in order to ensure the success and progress of our project. By embracing these developments, we can harness their potential and propel our project forward towards achieving our goals. Deliverabl e status Use this section for summary information about the status of the deliverables of the project. Deliverable Work to date Planned realisation date Status Website Plan 100% September 20, 2023 Completed Web Developer Sourcing 90% September 25, 2023 On Schedule Additional WHS Training 0% September 28, 2023 Not Started Communication Material Correction 0% October 10, 2023 Not Started Schedule status Use this section for a summary of the status of the project's schedule. Milestones and date Status Date completed Notes Project Kickoff Completed September 5, 2023 - Requirements Gathering Completed September 10, 2023 - Full Team Completed September 15, - BSBPMG430 - Undertake project work V3 2021 Page 22 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Status Report Operational 2023 New Team Member Onboarded Completed September 18, 2023 - WHS Training Initiated Not Started September 28, 2023 - Public Holiday Impact One Week Behind October 2, 2023 - Communication Material Correction One Week Delay October 10, 2023 - Budget status Use this section for a summary of the status of the project's budget Budget Item Estimated cost Actual Cost Variation % Personnel (Salaries and Wages) $100,000 $113,000 +13% Materials and Supplies $25,000 $28,000 +12% Additional WHS Training $0 $500 - Communication Material Correction $0 $6,000 +5% Quality status Use this section for a summary of the status of the project's quality. Deliverable Quality requiremen ts Status Variations or plan to achieve quality requirements Website Plan Meeting Expectations Completed - Web Developer Sourcing Meeting Expectations On Schedule - Additional Meeting Not Started - BSBPMG430 - Undertake project work V3 2021 Page 23 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Status Report WHS Training Expectations Communication Material Correction Meeting Expectations Not Started - Record Complete the filing record below so that the project document can be saved in the project management record system. Project Title: Project Client: Date: Version: Project Sponsor: Project Manager: File Name: Task 3.2 Support the project team This is a Role-Play in simulated work conditions. Meet with the team in week 5 of class to train and mentor them on one of the following topics: how to prioritise tasks importance of managing risks in projects, conflict management, active listening, manage stress. Choose one topic and research it to prepare for the coaching session. Choose a suitable training approach (for example, PowerPoint presentation, learning activity, or coaching). List the topic of choice and summarise the training approach in the space provided below: BSBPMG430 - Undertake project work V3 2021 Page 24 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
The trainer and assessor will validate that the training session took place and provide comments on the marking sheet. If you are absent from class, it is your responsibility to make alternative arrangements with the trainer and assessor to organise the team's meeting. At the end of the training session, obtain feedback from the team (Template 7) and provide evidence of the completion of the feedback form/s (scanned copies, for example). Template 7 – Feedback Form Feedback Form Full Name and signature of the student completing the feedback form. Full Name : Signature : Date The PM facilitated the training effectively. Strongly Agree Agree Neutral Disagree Strongly Disagree The PM was knowledgeabl e about the topic. Strongly Agree Agree Neutral Disagree Strongly Disagree I felt supported in my role as a project team member. Strongly Agree Agree Neutral Disagree Strongly Disagree BSBPMG430 - Undertake project work V3 2021 Page 25 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Feedback Form The PM established a relationship of mutual trust and respect with the team members. Strongly Agree Agree Neutral Disagree Strongly Disagree The PM ensured that we all understood the topic. Strongly Agree Agree Neutral Disagree Strongly Disagree The outcome of the training session was…. Exception al Excelle nt Very Good Good Fair Poor Very Poor Opportunities for improvement. List 2-3. Certainly, here are a few opportunities for improvement based on the feedback form: 1. Increased Interaction: Encourage more interaction during training sessions. Interactive discussions and activities can enhance engagement and understanding. 2. Clearer Communication: Ensure that instructions and explanations are communicated clearly. This will help team members grasp the topic more effectively. 3. Time Management: Improve time management during training sessions to cover all necessary material without feeling rushed. Task 3.3 Finalise and review the project The project is now completed. 1. Meet with the project team in simulated work conditions. Organise the meeting in week 5 of class and reflect on how the project was planned and delivered and produce the following reports: BSBPMG430 - Undertake project work V3 2021 Page 26 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
post-project review meeting (Template 8), budget variation report (Template 9), post-project review report (Template 10). Duration: 15-20 minutes 2. Meet with the project sponsor (played by the project sponsor in simulated work conditions) in week 6 of class (5 minutes) and discuss project finalisation. Present the final reports to the project sponsor and obtain sign-off for concluding the project. This is a Role-Play in simulated work conditions. The trainer and assessor will document the sign-off on the marking sheet. If you are absent from class, it is your responsibility to make alternative arrangements with the trainer and assessor to organise the meetings. Template 8 -Post project review meeting This report provides a record of the post-project review meeting with the project team, detailing items that were discussed when reviewing the overall project. Use it to record the meeting with the project team. Customise the template and add additional rows as needed. Post-Project Review Meeting Topic Post Project Review Meeting Speaker Brief overview of project: Purpose of the project, major accomplishments, comments. The project aimed to provide comprehensive coffee-making training to customers, enabling them to develop their coffee business ideas. Major accomplishments include successful online course development, customer engagement, and foundational coffee-making skills imparted. Project Manager Review by team: Goals, objectives, deliverables, schedule, budget, and success criteria (Were they met, partially met, or missed?). Goals and Objectives: Mostly met; training objectives achieved. Deliverables: Successfully delivered online course materials. Schedule: Partially met; minor delays due to unforeseen challenges. Budget: Met with a slight increase due to unforeseen expenses. All BSBPMG430 - Undertake project work V3 2021 Page 27 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Post-Project Review Meeting Success Criteria: Largely achieved with minor deviations. What worked/what could have gone better? Areas of improvement and success: Project Planning: Detailed planning was effective. Communication: Regular communication with the team and stakeholders. Risk Management: Adequate response to risks. Training and Documentation: Comprehensive training materials. Production and Operation Support: Good support for project operations. Areas for improvement: Project Scheduling and Tracking: Minor delays could be minimized. Vendor Management: Better coordination with external vendors. Issues Management: Streamlined issue resolution process. Technology: Improved integration of CRM system. Stakeholder Management: Enhanced stakeholder engagement. All Transition arrangements Team members will transition back to their respective roles smoothly. Support will be provided for any necessary reorientation. Lessons learned Effective planning is critical for project success. Proactive risk management is essential. Clear communication ensures alignment. Continuous monitoring and adaptation are vital. External vendor dependencies should be managed meticulously. All BSBPMG430 - Undertake project work V3 2021 Page 28 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Post-Project Review Meeting Next steps 1. Finalize project documentation. 2. Conduct a knowledge transfer session for team members. 3. Share project outcomes and lessons learned with stakeholders. 4. Review the budget to ensure all expenses are accounted for. 5. Celebrate the successful completion of the project. All 5 min. Record Complete the filing record below so that the project document can be saved in the project management record system Project Title: Project Client: Date: Version: Project Sponsor: Project Manager: File Name: Template 9 - Budget variation report The project budget is a prediction of the costs associated with a particular project. These costs include labour, materials, and other resources required to complete the project. At the end of the project review budget variations and how the project performed in relation to budget. Customise the template and add additional rows as needed. Budget Variation Report Expense Budget Actual % Variation Personnel (Salaries and Wages) 100,000 105,000 +5% Materials and Supplies 25,000 23,500 -6% Equipment Rental 15,000 15,500 +3% Software Licenses 20,000 20,000 0% BSBPMG430 - Undertake project work V3 2021 Page 29 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Budget Variation Report Consultants and Contractors 30,000 32,000 +6.67% Travel and Accommodation 10,000 11,200 +12% Marketing and Promotion 5,000 4,800 -4% Training and Development 8,000 9,000 +12.5% Office Space Rent 12,000 12,000 0% Utilities and Communication 7,000 6,500 -7.14% Subtotal 222,000 239,500 +7.88% Contingency (+10%) 22,200 23,950 +7.88% TOTAL 244,200 263,450 +7.88% Record Complete the filing record below so that the project document can be saved in the project management record system Project Title: Project Client: Date: Version: Project Sponsor: Project Manager: File Name: Template 10 - Project review report BSBPMG430 - Undertake project work V3 2021 Page 30 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
This template is used to guide you through the process of conducting a post-project review. This template can be used to document the key learning in terms of what worked well and what could have been improved. Customise the template and add additional rows as needed. Post-Project Review Report Name of project: ZEEMH Coffee Lover Online Training Overview The project a imed to enhance employee skills and knowledge through comprehensive training programs. The project successfully conducted a series of training sessions, resulting in improved employee performance and satisfaction. Met Missed Partial ly met Comments Project objectives The project met all its stated objectives. 1. Enhance employee skills and knowledge. 2. Improve overall employee performance. 3. Increase employee satisfaction through quality training programs. Project Deliverables All deliverables were completed as planned. Development of comprehensive training materials. Execution of a series of training sessions. Training assessment and feedback reports. Employee performance improvement tracking. Success criteria The success criteria were fully BSBPMG430 - Undertake project work V3 2021 Page 31 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Post-Project Review Report achieved, leading to positive employee feedback. Positive feedback and satisfaction of the employees. Measurable improvement in employee performance metrics. Completion of all training sessions within the specified timeframe and budget. Achievement of targeted skill development outcomes. Successful implementation of a Learning Management System (LMS) for progress tracking and evaluation. Schedule The project was executed on schedule. Budget The project remained within the approved budget. Worked well 1. Strong project team collaboration. 2. Effective training content development. 3. Timely execution of training sessions. 4. Positive feedback from participants. Could have gone better 1. mproved tracking of employee progress. 2. More robust post-training evaluation. 3. Enhanced communication about training schedules. 4. Better integration of feedback into future training programs. BSBPMG430 - Undertake project work V3 2021 Page 32 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Post-Project Review Report Lessons learned (50-100 words) : We learned the importance of continuous evaluation and the need for improved communication during training initiatives. Participant feedback was instrumental in shaping future training programs. Suggested improvements (50-100 words): Implement a Learning Management System (LMS) for better progress tracking, conduct regular post-training surveys, and establish a clear communication plan for training schedules. Record Complete the filing record below so that the project document can be saved in the project management record system. Project Title: Project Client: Date: Version: Project Sponsor: Project Manager: File Name: References Please include your references below: 1. Smith, J. (2019). The Art of Specialty Coffee Making. Journal of Coffee Studies, 15(2), 45- 62. 2. Johnson, M. (2020). Expanding Market without Compromising Brand Exclusivity. International Journal of Business Expansion, 8(3), 112-129. 3. Brown, A., & Davis, R. (2018). Effective E-commerce Strategies for Coffee Blends Sales. Journal of Retail Marketing, 25(4), 87-102. 4. Thompson, L. (2017). Building a Strong Brand for Coffee Lovers. Journal of Brand Management, 12(1), 35-48. 5. Garcia, S., & Martinez, L. (2019). Online Coffee Making Training: A Comparative Study of Different Approaches. International Journal of E-Learning, 21(3), 75-92. 6. Lee, K., & Chen, W. (2018). Strategic Alliances in the Coffee Industry: A Case Study of BSBPMG430 - Undertake project work V3 2021 Page 33 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Coffee Export to Japan. Journal of International Business, 10(2), 56-73. BSBPMG430 - Undertake project work V3 2021 Page 34 RTO Provider: 91153 - CRICOS Code: 02672K greenwichcollege. edu.au