IBM Engineering Lifecycle Management Level 2 Quiz_ Attempt review
pdf
keyboard_arrow_up
School
Lambton College *
*We aren’t endorsed by this school
Course
1
Subject
Industrial Engineering
Date
Jan 9, 2024
Type
Pages
14
Uploaded by SuperYak3148
6/21/23, 4:24 PM
IBM Engineering Lifecycle Management Level 2 Quiz: Attempt review
https://learn.ibm.com/mod/quiz/review.php?attempt=2436619&cmid=239029
1/14
Started on
Wednesday, June 21, 2023, 4:18 PM
State
Finished
Completed on
Wednesday, June 21, 2023, 4:24 PM
Time taken
5 mins 55 secs
Feedback
Congratulations, you passed the IBM
Engineering Lifecycle Management Level
2 Quiz!
Question 1
Correct
Points out of 1.00
Question 2
Correct
Points out of 1.00
What IBM offering is designed to address engineering
complexity by managing all the data elements in a project as
well as the relationship between these elements?
IBM Engineering Lifecycle Management (ELM)
IBM Engineering Requirements Management DOORS Next
IBM Engineering Workflow Management (EWM)
IBM Engineering Systems Design Rhapsody
A weary client indicates that they are struggling to meet the
demands of a quick product release cycle. Primarily, this is
because they've had trouble managing requirements across the
domains in different formats (PDF, HTML, Excel, and more).
What tooling should you suggest?
IBM Engineering Lifecycle Optimization (ELO) Publishing
Model Based Systems Engineering (MBSE)
Automotive Open System Architecture
IBM Rhapsody
←
→
6/21/23, 4:24 PM
IBM Engineering Lifecycle Management Level 2 Quiz: Attempt review
https://learn.ibm.com/mod/quiz/review.php?attempt=2436619&cmid=239029
2/14
Question 3
Incorrect
Points out of 1.00
Question 4
Correct
Points out of 1.00
What IBM offering enables clients to gather and analyze data
from across the entire development environment for better
decision making?
Global Con±guration Management (GCM)
Jazz Reporting Service (JRS)
IBM Master Data Management (MDM)
IBM Engineering Lifecycle Optimization (ELO) Engineering
Insights
A client informs you that their engineers would prefer to
continue using familiar open-source tools for the enterprise's
projects. How should you respond?
Unfortunately, to realize the full bene±t of IBM Engineering
Lifecycle Management (ELM), it is necessary to utilize the
tools associated with the platform.
That's ±ne! The IBM Engineering Lifecycle Management
(ELM) platform integrates with Open Services Life Cycle
(OSLC), which enables integration with open-source
tools.
That's ±ne! The IBM Engineering Lifecycle Management
(ELM) platform includes conversion tools that can fully
convert open-source tools into IBM tooling.
That's ±ne! The IBM Engineering Lifecycle Management
(ELM) platform is entirely open source, so the existing tools
will mesh well together.
←
→
6/21/23, 4:24 PM
IBM Engineering Lifecycle Management Level 2 Quiz: Attempt review
https://learn.ibm.com/mod/quiz/review.php?attempt=2436619&cmid=239029
3/14
Question 5
Correct
Points out of 1.00
Question 6
Correct
Points out of 1.00
What engineering approach de±nes project requirements
before technology choices are made and a system is
implemented?
Systems Agile Framework
Systems and Support
Systems V
Systems Lifecycle Optimization
What IBM offering provides the ability to capture requirements
both textually and graphically, manage traceability, support
collaboration between groups, and provide reports and
dashboards?
IBM DOORS Next
IBM Engineering Test Management (ETM)
IBM Document Builder
Jazz Reporting Service (JRS)
←
→
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
6/21/23, 4:24 PM
IBM Engineering Lifecycle Management Level 2 Quiz: Attempt review
https://learn.ibm.com/mod/quiz/review.php?attempt=2436619&cmid=239029
4/14
Question 7
Correct
Points out of 1.00
Question 8
Correct
Points out of 1.00
A new project manager asks which IBM offering can track
changes across project domains and disciplines to demonstrate
compliance to regulatory safety standards. How should you
respond?
Global Con±guration Management (GCM)
Open Services for Lifecycle Collaboration (OSLC)
IBM Engineering Workflow Management (EWM)
Scaled Agile Framework (SAFe)
A weary project manager admits during a meeting that recently
introduced product variations have yielded sub-par results.
Primarily, this was because teams struggled with staying on top
of product design changes. What should you recommend they
consider for their next project?
Digital threads will enable digital continuity between the
artifacts used across the entire lifecycle of product
development
Global Con±guration Management (GCM) will enable all
product teams to see what variants may be impacted by
changes made during the product development process
Open Services Lifecycle Collaboration (OSLC) supports the
creation of large-scale and easily maintainable integrations
in a heterogeneous tool environment
A digital engineering strategy will assure the integrity of the
data by respecting the trusted sources, and managing
consistency through cross-lifecycle digital information
models
←
→
6/21/23, 4:24 PM
IBM Engineering Lifecycle Management Level 2 Quiz: Attempt review
https://learn.ibm.com/mod/quiz/review.php?attempt=2436619&cmid=239029
5/14
Question 9
Correct
Points out of 1.00
Question 10
Correct
Points out of 1.00
What term refers to the digital representation of the
relationship between the elements of a project?
Digital Engineering
Digital Engagement
Digital Thread
Digital Strategy
In the case study regarding the French Rail Network, what
shortcoming was uncovered after delivery of new trains?
The product engineers did not accurately estimate the
expense for the project, and went well over budget
The team building the trains used a documentation-based
process, which made it dif±cult to manage changes and
updates
The product engineers did not consider the width of
thousands of historical train stations that were narrower
than the new trains
The teams building the different train platforms did not
collaborate with each other on the requirements
←
→
6/21/23, 4:24 PM
IBM Engineering Lifecycle Management Level 2 Quiz: Attempt review
https://learn.ibm.com/mod/quiz/review.php?attempt=2436619&cmid=239029
6/14
Question 11
Correct
Points out of 1.00
Question 12
Correct
Points out of 1.00
In a discovery meeting with a client, they mention that in their
last product release, the original planning documents were
moved to a cabinet in the wrong building. This made it dif±cult
for their engineers to locate key reference data. As a result,
they used an older version of the plans, which resulted in key
features being poorly designed. To ensure a trusted data source
on their next project, what should you recommend?
Implement a strict alpha-numeric versioning plan for all
project documentation
Assign a universal documentation manager to the project
to maintain artifact currency on the project
Ensure all the project domains have access to the
document cabinet repository
Employ a digital engineering strategy
What was the expectation of the US Department of Defense
(DoD) when championing a digital engineering strategy?
To improve management of the Kilo Source Lines of Code
(KSLOC) that must be included in all DoD projects
To ensure that all Requests for Proposal (RFPs) were
compliant with DoD standards
To improve delivery times and ensure the ±nal product
met the client's needs
To formalize the development, integration, and use of
models in their product engineering plans
←
→
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
6/21/23, 4:24 PM
IBM Engineering Lifecycle Management Level 2 Quiz: Attempt review
https://learn.ibm.com/mod/quiz/review.php?attempt=2436619&cmid=239029
7/14
Question 13
Correct
Points out of 1.00
Question 14
Correct
Points out of 1.00
An engineer in the Aerospace and Defense (A&D) industry
indicates that due to the cost and scope of their products, they
tend to consider the strategic long-term effects of their
projects. What is this a good example of?
Scaled Agile Framework (SAFe)
Waterfall methodology
Systems veri±cation and validation
Big picture thinking
A new project manager is overwhelmed by the prospect of
linking every requirement in their plan to a test. As a result, you
are asked what bene±t is gained by doing so. How should you
respond?
This will validate that a requirement is well-written
This can demonstrate compliance with industry
regulations
This is necessary to effectively use all of the project's tools
This will enable integration with the open-source tooling
←
→
6/21/23, 4:24 PM
IBM Engineering Lifecycle Management Level 2 Quiz: Attempt review
https://learn.ibm.com/mod/quiz/review.php?attempt=2436619&cmid=239029
8/14
Question 15
Correct
Points out of 1.00
Question 16
Correct
Points out of 1.00
A client is evaluating IBM Engineering Test Management (ETM)
and inquires if there are other bene±ts besides requirements
testing. How should you respond?
Yes, ETM allows you to gather and analyze data from
across the entire development environment, thus enabliing
better decision-making
Yes, ETM allows you to automate the generation of
document-style reports across both IBM and third-party
tools
Yes, ETM allows you to integrate with existing open-source
tools used within an enterprise
Yes, ETM also allows you to assess and monitor
potential risks, thus enabling risk management
What framework is used to implement Agile practices on large,
multi-disciplinary projects?
Scaled Agile Framework (SAFe)
Digital Engineering Framework
Global Con±guration Agile Management (GC
A
M)
Framework
Waterfall Framework
←
→
6/21/23, 4:24 PM
IBM Engineering Lifecycle Management Level 2 Quiz: Attempt review
https://learn.ibm.com/mod/quiz/review.php?attempt=2436619&cmid=239029
9/14
Question 17
Correct
Points out of 1.00
Question 18
Correct
Points out of 1.00
At what stage of a client's product engineering process is it
easiest for IBM or its competitors to introduce a best-of-breed
tool?
Testing
Requirements
Planning
Regulations
A new project manager at a defense contractor mentions that
they need to use a Uni±ed Pro±le (UPDM) modeling standard in
their design. What tool should you recommend?
Jazz Reporting Service
IBM Engineering Lifecycle Optimization (ELO)
Global Con±guration Management (GCM)
IBM Rhapsody
←
→
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
6/21/23, 4:24 PM
IBM Engineering Lifecycle Management Level 2 Quiz: Attempt review
https://learn.ibm.com/mod/quiz/review.php?attempt=2436619&cmid=239029
10/14
Question 19
Correct
Points out of 1.00
Bi-directional data in the digital thread helps provide
functional, software, mechanical, and electrical engineering
domains share a single source of truth. What is a term to
describe this?
Agile
Compliance
Traceability
Variation
←
→
6/21/23, 4:24 PM
IBM Engineering Lifecycle Management Level 2 Quiz: Attempt review
https://learn.ibm.com/mod/quiz/review.php?attempt=2436619&cmid=239029
11/14
Question 20
Correct
Points out of 1.00
The head of engineering at an account indicates that uniting
their different teams on the same tools is a challenge because
they have different work preferences. As an example, one
successful team is very fond of using the Waterfall
methodology, but others are more likely to use an Agile
approach. You are asked if IBM has a tool that will appeal to all
the teams. How should you respond?
Global Con±guration Management (GCM) enables clients to
reuse con±gurations in different versions or variants of
software and product lines
IBM Engineering Workflow Management (EWM) is
flexible and can support most project management
methodologies including Waterfall and Agile, enabling
you to manage dependencies across all projects
Using a digital strategy with model-based representations
assures the integrity of the data by respecting the trusted
sources and can ensure consistency through cross-
lifecycle digital information models
IBM Engineering Requirements DOORS Next provides a
scalable solution to optimize communication and
collaboration amongst both teams and stakeholders
←
→
6/21/23, 4:24 PM
IBM Engineering Lifecycle Management Level 2 Quiz: Attempt review
https://learn.ibm.com/mod/quiz/review.php?attempt=2436619&cmid=239029
12/14
Question 21
Correct
Points out of 1.00
Question 22
Incorrect
Points out of 1.00
What term refers to the application of knowledge to design,
build, and maintain a product or process that solves a problem
and ful±lls a need?
Compliance
Engineering
Systems Design
Traceability
What is NOT a good reason for a client to use a digital
engineering strategy for their complex projects?
In order to engage and plan projects virtually, and avoid
delays when shutdowns prohibit planned meetings
In order to better plan projects, thus saving money and
resources
In order to completely eliminate all physical prototyping
prior to the mass manufacturing phase
In order to respond to environmental changes and
remain competitive in a timely manner
←
→
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
6/21/23, 4:24 PM
IBM Engineering Lifecycle Management Level 2 Quiz: Attempt review
https://learn.ibm.com/mod/quiz/review.php?attempt=2436619&cmid=239029
13/14
Question 23
Correct
Points out of 1.00
Question 24
Correct
Points out of 1.00
A defense contractor is concerned about keeping their project
details restricted to a need-to-know basis. They would like to
understand how the tools withing the IBM Engineering Lifecycle
Management (ELM) platform are deployed. How should you
respond?
It can be deployed on-premises, as well as in a private
or public cloud
It can be deployed on Amazon Web Services (AWS), but not
within a private data center
It can be deployed on an appliance, but not on cloud
infrastructure
It can be deployed on IBM Cloud, but not within a private
data center
During the product engineering process, what is an issue that
can create costly rework afterward?
Information being discovered late in the process or
missed entirely
Employing the Scaled Agile Framework (SAFe)
methodology to manage the project
A client outlining their needs and requirements too early in
the lifecycle
Utilizing Open Services for Lifecycle Collaboration (OSLC)
to integrate the enterprise tools into the project
←
→
6/21/23, 4:24 PM
IBM Engineering Lifecycle Management Level 2 Quiz: Attempt review
https://learn.ibm.com/mod/quiz/review.php?attempt=2436619&cmid=239029
14/14
Question 25
Correct
Points out of 1.00
For their next project, a medical device manufacturer indicates
that they need a tool to assist them with capturing, tracing,
analyzing, and managing changes to requirements. While these
activities are in progress, it is essential for the client to maintain
compliance with regulations and standards. What IBM tool
should you recommend?
Infosphere Master Data Management
Jazz Reporting Service
IBM Rhapsody
IBM DOORS Next
←
→