CHAPTER 5
Question 1
1 out of 1 points
All of the following can serve as a work center except
Selected Answer:
A shipping dock
Answers:
A group of machines
A group of people responsible for completing operations
A production line
A work area
A shipping dock
Question 2
1 out of 1 points
Which one of the following best describes a work center?
Selected Answer:
A location where value-added work needed to produce a material is carried
out
Answers:
A location where materials are placed right before they are shipped
Another term used to describe an office building
A location where value-added work needed to produce a material is carried
out
A shipping dock
A storage shelf in a warehouse
Question 3
1 out of 1 points
After production has been completed, a goods receipt against the production order is used to pick the goods and ship them to the customer
Selected Answer:
Fals
e
Answers:
Tru
e
Fals
e
Question 4
1 out of 1 points
Which of the following identifies the list of materials needed to produce one or more units of a finished good?
Selected Answer:
Bill of materials
Answers:
Routing
Source materials
Component listing
Bill of components
Bill of materials
Question 5
1 out of 1 points
Material staging is the process in which component materials are moved from storage and prepared for use.
Selected Answer:
Tru
e
Answers:
Tru
e
Fals
e
Question 6
1 out of 1 points
In process industries like chemicals and beverages, the bill of materials is also known as a(n)
Selected Answer:
Formula
Answers:
Formula
List of chemicals
Bill of chemicals
Equation
Material lis
Question 7
1 out of 1 points
Component assignment is a technique that assigns components in a BOM either to a routing or to a specific operation within the routing.
Selected Answer:
Tru
e
Answers:
Tru
e
Fals
e
Question 8
1 out of 1 points
Typically a production order does not include any references to the BOM, routing, or work centers.
Selected Answer:
Fals
e
Answers:
Tru
e
Fals
e
Question 9
1 out of 1 points
The creation of a production order results in several outcomes including all of the following except
Selected Answer:
Confirmation
Answers:
Scheduling
Availability checks
Purchase requisitions
Preliminary costing
Confirmation
Question 10
1 out of 1 points
An active bill of materials can be used in the production of a material, but an inactive BOM cannot.
Selected Answer:
Tru
e
Answers:
Tru
e
Fals
e
Question 11
1 out of 1 points
A bill of materials identifies the finished goods that are to be shipped to a specific customer.
Selected Answer:
Fals
e
Answers:
Tru
e
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Fals
e
Question 12
1 out of 1 points
At what organizational level are material requirements planning (MRP) and work scheduling data defined in the material master?
Selected Answer:
Plant level
Answers:
Client level
Plant level
Company code level
Sales area level
Production level
Question 13
1 out of 1 points
What operation in the routing is sometimes necessary to prepare materials for use in production?
Selected Answer:
Material staging
Answers:
Backflushing
Confirmation
Material staging
Recall
Reservation
Question 14
1 out of 1 points
A work center is a location where materials are placed immediately before they are shipped.
Selected Answer:
Fals
e
Answers:
Tru
e
Fals
e
Question 15
1 out of 1 points
Variable time elements are independent of how many units of material are produced.
Selected Answer:
Fals
e
Answers:
Tru
e
Fals
e