btw 250 nominalization
.pdf
keyboard_arrow_up
School
University of Illinois, Urbana Champaign *
*We aren’t endorsed by this school
Course
250
Subject
Civil Engineering
Date
Apr 3, 2024
Type
Pages
2
Uploaded by ProfessorCobraPerson1022
1. Our expectation was to establish new tolerance levels.
We expected to establish new tolerance levels.
2. Attempts were made on the part of the engineering staff in regard to an assessment of the
project.
Engineering staff attempted to assess the project.
3. There were expectations by the governing committee that their report submission would meet
the deadline.
The governing committee expected to submit their report on the deadline.
4. The appearance of the candidate before the board was on June 30.
The candidate appeared before the board on June 30.
5. The governor’s refusal of the request is a necessity.
The governor needs to refuse the request.
6. A presidential appeal was made to the American people for the conservation of gasoline.
The American people received a presidential appeal for the conservation of gasoline.
7. More accurate measurements of the thorium half-life were conducted at that time by
independent investigators.
Independent investigators conducted additional accurate measurements of the thorium half-life.
8. Discussions by the participants in the future of the program were conducted amicably.
The participants in the future of the program conducted the discussions amicably.
9. There was no independent business sector analysis of the cause of the trade deficit.
No independent business sector analyzed the cause of the trade deficit.
10. Agreement as to the need for revisions in the terms of the treaty was reached by both sides.
Both sides agreed they needed to revise the terms of the treaty.
11. There was uneasiness among management over the results of the survey.
Management was uneasy over the results of the survey.
12. There must be thorough preparation of the specimen sections by the laboratory personnel.
Laboratory personnel must thoroughly prepare the specimen sections.
13. The discrepancy in the data demands checking by the insurer.
The insurer needs to check the discrepancy in the data.
14. The rejection of the application by the dean was unexpected.
The dean rejecting the application was unexpected.
15. The performance by the police of an investigation into the affair occurred without delay.
The police performed an investigation into the affair without delay.
16. There should be no hesitation in regard to saying no.
Saying no should have no hesitation.
17. The same principles of bilateral symmetry received study after the last report.
After the last report, researchers studied the same principles of bilateral symmetry.
18. A solution to the UFO problem will never be found by the Air Force.
The Air Force will never find a solution to the UFO problem.
19. It is my belief that there should be consultation among the administrators with the student
body before changes in rules are made.
I believe the administrators should consult with the student body before making changes in rules.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
Q.4 (a) A new concrete bridge is to be constructed near the sea and its design has to incorporate features protecting it from exposure to marine environments. Among these, a new coating system is being proposed for concrete. You have been awarded a six-month contract to evaluate this system and materials involved. Describe the major parts of your programme, assuming that you also have access to a structure on which the coating has recently been used.
arrow_forward
Q.3 (a) A new concrete bridge is to be constructed near the sea and its design has
to incorporate features protecting it from exposure to marine environments.
Among these, a new coating system is being proposed for concrete. You have
been awarded a six-month contract to evaluate this system and materials
involved. Describe the major parts of your programme, assuming that you also
have access to a structure on which the coating has recently been used.
(b) Aggregate is one of the main materials used in the production of concrete
and its physical properties as well as the size distribution can affect the
properties of fresh and hardened concrete. Discuss the influence of absorption
and surface moisture conditions of mineral aggregate on fresh and hardened
concrete properties.
arrow_forward
Describe the type of test conducted during waste water treatment along with the procedure.
arrow_forward
What is the major difference between high-risk respirable fraction (HRPM) and respirable fraction (RPM)?
arrow_forward
Please answer clearly
arrow_forward
Q2 bHow can you determine chloride content in a waste water sample?
arrow_forward
sample of a work breakdown structure on construction of a single storey house.
arrow_forward
Discuss any test done on the five different materials of wastewater treatment plant
arrow_forward
The average compressive strength of concrete paving blocks produced at ABC Company is measured by testing three blocks from each batch of production. The test results for 15 consecutive samples are given below.
a) Develop ‘mean’ and ‘range’ charts for three-sigma quality control.
b) Comment about the status of the process.
arrow_forward
It is the regular inspection and review of the progress of the project
Profiling
Monitoring
Assessment
Evaluation
arrow_forward
A BOD analysis was begun on Monday. Fifteen ml of waste with a DO of zero was mixed with 270 mL of dilution water with a DO of 9 mg/L. The sample was then put in the incubator. Since the 5th day fell on a long weekend (Friday) and lab personnel do not work on Saturday, the final DO did not get measured until Monday, the eighth day. The final DO was measured at 2.8 mg/L. However, it was discovered that the incubator was mistakenly set at 32 ºC. Assume k is 0.15 day-1 at 20 ºC and θ= 1.05. Determine the 5-day 20 ºC BOD of the sample. Also, what is the ultimate CBOD at 32 ºC and 20 ºC; Will it vary?
arrow_forward
What are the procedures, apparatus, and calculations needed for shrinkage limit test?
arrow_forward
Case4: A consulting engineering company was awarded the
contract for
designing, preparing the specifications, and providing "field
inspection services" (monitoring the construction) of a sewage
treatment plant being built for a small municipality. The
construction proceeded routinely to completion. The consulting
company employed Engineer A, an environmental engineer
experienced in wastewater treatment, to assist in the field
inspection. During the final commissioning of the plant,
Engineer A observed that the biochemical oxygen demand
(BOD) of the effluent was frequently above the acceptable limit.
Engineer A contacted the design office at his engineering
company, and after reviewing the case with an environmental
consultant, he soon realized that the plant had been designed for
average flows, but several food-processing industries in the
municipality occasionally fed "slugs" of raw sewage to the
plant. The biochemical oxygen demand would increase rapidly
when one of these slugs…
arrow_forward
1). a detailed response how concrete cancer impacts the sustainability of buildings.
#please provide the Solution as per requirement, without plagiarism
arrow_forward
The probability that a certain kind of concrete cylinder sample will
survive a given shock test is %. Find the probability that exactly 2 of the next 4 samples tested survive?
At least 1 sample of the next 4 samples will survive?
arrow_forward
List three primary distress modes adopted in HMA performance testing
List four common HMA plant operations.
List two commonly used rollers to compact an HMA layer
Air voids in HMA affect durability, cohesion, and stability. Please, draw a figure illustrating this relation.
arrow_forward
1. What Item No. is "Aggregate Surface Course" in the DPWH Standard Specifications for Highways, Bridges and Airports?
2. What Item No. is "Aggregate Base Course" in the DPWH Standard Specifications for Highways, Bridges and Airports.
Choices
Item 102, 200, 201, 202
arrow_forward
A pipeline was constructed of a pipe with inside diameter 101 mm and outside diameter 114 mm. On examination it was found that the wall thickness had been reduced by corrosion to about half the original value in 3.25 years. i) Estimate the rate of corrosion in mm per year. A decision has to be made on what material to use to replace the pipe. Three suggestions have been made: ii) Replace with the same schedule carbon steel pipe and accept renewal at 3-year intervals. iii) Replace with a schedule 80 pipe, outside diameter 113 mm, inside diameter 97 mm. iv) Use stainless steel pipe, which will not corrode. The estimated cost of the pipes, per unit length is schedule 40 carbon steel $6, schedule 80 carbon steel $8, stainless steel (304) schedule 40 $26. Installation and fittings for all the materials adds $17.5 per unit length. The downtime required to replace the pipe does not result in a loss of production. If the expected future life of the plant is 8 years, recommend which pipe to…
arrow_forward
2. Given the sieve analysis results shown in the table, answer questions below.
Fine Sieve
Initial Wt.
563
Accum. Wt.
3/8"
#4
42.1
#8
169.6
#16
276.1
#30
350.1
#50
398.3
#100
429.6
#200
453.6
a) Calculate percent retained, cumulative percent retained, and percent passing of each sieve
size
b) Calculate Fineness Modulus, does it meet the typical range?
c) Does this aggregate meet ASTM C33 grading requirement for fine aggregate? Please
provide the grading limit you used. (
arrow_forward
Define and explain the following terms: (a) availability; (b) maintainability; (c) condition monitoring.
arrow_forward
Assess mechanisms of failure and deterioration in historic buildings
arrow_forward
With the standardized solution, what is the corrected established relationship?
27
10mL Na2S203 solution = 1.856 mg/L DO
O 10mL Na2S2O3 solution = 0.224 mg/L DO
10mL Na2S203 solution = 0.104 mg/L DO
10mL Na2S203 solution = 1.232 mg/L DO
arrow_forward
What difficulties arise in use of construction material which absorb water? How theyovercome
a) In the laboratory.b) And on construction site.
arrow_forward
Connect the different test plans with the corresponding development phases. 1、 Unit test plan 2、 Integration test plan 3、 System/validation test plan A、 Requirement analysis phase B、 Preliminary Design phase C、 Detail Design phase
arrow_forward
What are the two situations of groundwater contamination due to factors other than a reaction with waste materials and chemicals?
arrow_forward
Define Corrosion and Degradation
arrow_forward
There are many different types of ALM environments, but here are a few to get you started:
arrow_forward
Hand written, clean and detail solution please
arrow_forward
Which of the following is not for BIM use in CM?, select all apply.
Group of answer choices
Facilities Management
Cost Estimating and Quantity Takeoff
Design drawings
clash detection
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Construction Materials, Methods and Techniques (M...
Civil Engineering
ISBN:9781305086272
Author:William P. Spence, Eva Kultermann
Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
Related Questions
- Q.4 (a) A new concrete bridge is to be constructed near the sea and its design has to incorporate features protecting it from exposure to marine environments. Among these, a new coating system is being proposed for concrete. You have been awarded a six-month contract to evaluate this system and materials involved. Describe the major parts of your programme, assuming that you also have access to a structure on which the coating has recently been used.arrow_forwardQ.3 (a) A new concrete bridge is to be constructed near the sea and its design has to incorporate features protecting it from exposure to marine environments. Among these, a new coating system is being proposed for concrete. You have been awarded a six-month contract to evaluate this system and materials involved. Describe the major parts of your programme, assuming that you also have access to a structure on which the coating has recently been used. (b) Aggregate is one of the main materials used in the production of concrete and its physical properties as well as the size distribution can affect the properties of fresh and hardened concrete. Discuss the influence of absorption and surface moisture conditions of mineral aggregate on fresh and hardened concrete properties.arrow_forwardDescribe the type of test conducted during waste water treatment along with the procedure.arrow_forward
- sample of a work breakdown structure on construction of a single storey house.arrow_forwardDiscuss any test done on the five different materials of wastewater treatment plantarrow_forwardThe average compressive strength of concrete paving blocks produced at ABC Company is measured by testing three blocks from each batch of production. The test results for 15 consecutive samples are given below. a) Develop ‘mean’ and ‘range’ charts for three-sigma quality control. b) Comment about the status of the process.arrow_forward
- It is the regular inspection and review of the progress of the project Profiling Monitoring Assessment Evaluationarrow_forwardA BOD analysis was begun on Monday. Fifteen ml of waste with a DO of zero was mixed with 270 mL of dilution water with a DO of 9 mg/L. The sample was then put in the incubator. Since the 5th day fell on a long weekend (Friday) and lab personnel do not work on Saturday, the final DO did not get measured until Monday, the eighth day. The final DO was measured at 2.8 mg/L. However, it was discovered that the incubator was mistakenly set at 32 ºC. Assume k is 0.15 day-1 at 20 ºC and θ= 1.05. Determine the 5-day 20 ºC BOD of the sample. Also, what is the ultimate CBOD at 32 ºC and 20 ºC; Will it vary?arrow_forwardWhat are the procedures, apparatus, and calculations needed for shrinkage limit test?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Construction Materials, Methods and Techniques (M...Civil EngineeringISBN:9781305086272Author:William P. Spence, Eva KultermannPublisher:Cengage LearningTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Construction Materials, Methods and Techniques (M...
Civil Engineering
ISBN:9781305086272
Author:William P. Spence, Eva Kultermann
Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning