AURAEA004 Day three Activity (Implement action plan 2a) Student s copy Page 1 of 4 2. Emergency response procedure Emergency response procedures for major environmental accidents are developed and documented, and staff are notified of location and documentation developed for recording accidents and spills Safety data sheets (SDS) are sourced and stored, and staff notified of their location S.no Type of spill? PPE to be use and reference to make? Who to inform? Spill kit type? Dealing with large spills 1. Waste Coolant 2. Waste Engine oil Dealing with toxic chemical leaks 1. Battery acid
AURAEA004 Day three Activity (Implement action plan 2a) Student s copy Page 2 of 4 2.1. Environmental internal/external complaint checklist Workplace procedures are put in place to address complaints regarding environmental issues S.no Complaints Internal External Root cause Corrective measures 1. Noisy air compressor 2. Tools spreading everywhere 3. Waste spreads everywhere around neighbour’s places 4. Having difficulties to breath in workplace 5. Oil and coolant spills into drain Root Cause explanation 1. 2.
AURAEA004 Day three Activity (Implement action plan 2a) Student s copy Page 3 of 4 3. 4. 5. Corrective Measures Explanation 1. 2. 3. 4. 5.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
AURAEA004 Day three Activity (Implement action plan 2a) Student s copy Page 4 of 4 2.2. Select the appropriate work below based on daily or weekly task: Checklists are developed to ensure procedures are followed Daily ( ) Weekly ( ) all stormwater drains have been checked and they are clear of oil, chemicals, and litter. All hazardous liquid containers are stored in a bunded and covered area and have been checked. Floor areas have been checked for spills and drips. Spills and drips are cleaned up immediately. all parts and engines are stored in a bund or spill tray. all chemical containers have been checked for leaks. all lids are properly sealed. Waste storage areas are not overfull. Wastes cannot be blown or washed away by rain. all bin lids are down. all bunds have been checked and any damage or anomalies reported to the manager. the spill kit/s have been checked and contain all necessary materials. Underground storage tanks and supply lines have been checked for leaks. the oil/water separator and collection pit alarm are functioning correctly. all compressors have been checked for leaks. a walk around of the outside of the premises has been done, during normal operating hours, to check for noise and odors. any noise or odors have been reported to the manager. liquid wastes are stored in separate containers and are correctly labelled. Daily checklists have all been completed. carried out by: Signed: Date: