Operations Management: Processes And Supply Chains (12th Global Edition) - Does Not Include Mylab Operations Management
12th Edition
ISBN: 9780134890357
Author: Lee J. Krajewski, Manoj K. Malhotra
Publisher: Pearson Global Edition
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter D, Problem 14P
A
Summary Introduction
Interpretation:the objective function and constraints for maximize the contribution to profits
Concept Introduction:Objective functions are the linear functions and the equalities or inequalities are the constraints. It is the condition of an optimization of problem.
B
Summary Introduction
Interpretation:using the computer package, the interpretation is to be solved.
Concept Introduction:Objective functions are the linear functions and the equalities or inequalities are the constraints. It is the condition of an optimization of problem.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A manufacturing plant produces a product 'A' that requires one unit of 'B' and ½ unit of 'C'. Each unit of 'B' is comprised of one unit of 'D', two units of 'E', and one unit of 'F'. Each unit of 'C' requires ½ unit of 'G' and three units of 'H'. The manufacturing lead times for the components are as follows: 'A' - two weeks, 'B' - one week, 'C' - two weeks, 'D' - two weeks, 'E' - three weeks, 'F' - one week, 'G' - two weeks, 'H' - one week. There are 20 units in stock for each of these components. 100 units of 'A' are needed for delivery in seven weeks: a) Develop the product structure and indexed bill of materials for the product. b) Create a gross and net requirements plan for the manufacturer of the product.
bama pie company's assembly line operations (the assembly line operates for six hundred minutes per day) comprise of eleven tasks, with the longest task time being 2.4 minutes and the shortest task time being 0.4 minutes; the sum of the task times is eighteen minutes. the firm is working on balancing its assembly line operations. the firm needs to produce 200 pies per day; to achieve this, the firm calculates the required cycle time as ---- minutes?
There is an upstream Picking department that feeds two downstream
Packing departments: Pack Singles and Pack Multis. Those Packing departments feed to a Shipping department that loads the outgoing trucks. 40% of your Pick volume goes to Pack Singles and has a packing rate of 104 units per labor hour (uph). 60% of the Pick volume goes to Pack Multis and has a pack rate of 215 units per labor hour. Your pickers pick both Single and Multi items throughout the day at an overall average rate of 114 units per labor hour. All units that are packed in both processes go through the Ship process at a rate of 570 units per hour. You have 102 people today for all 4 departments and you absolutely must pack 47,880 units in Pack Multis Items to meet a customer promise metric. How do you allocate labor to balance the flow in your department if you work a 10 hour shift? Do not assume breaks or lunches in your answer. Redirect 1: You now need to process all of the Pack Singles Volume in the first 5…
Chapter D Solutions
Operations Management: Processes And Supply Chains (12th Global Edition) - Does Not Include Mylab Operations Management
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- A machine tool company conducts a job-training programme at a ratio of one for everyten trainees. The training programme lasts for one month. From past experience it has been found thatout of 10 trainees hired, only seven complete the programme successfully. (The unsuccessful traineesare released). Trained machinists are also needed for machining. The company's requirement for thenext three months is as follows:January: 100 machinists, February: 150 machinists and March: 200 machinists.In addition, the company requires 250 trained machinists by April. There are 130 trained machinistsavailable at the beginning of the year. Pay roll cost per month is:Each trainee Rs. 400/- per month.Each trained machinist (machining or teaching): Rs. 700/- p.m.Each trained machinist who is idle: Rs.500/- p.m.(Labour union forbids ousting trained machinists). Build a l.p.p. for produce the minimum costhiring and training schedule and meet the company’s requirement.arrow_forwardPlearrow_forwardConsider a two-step process that handles three types of customers. Each resourceis staffed by one employee. Type 1 customers spend 5 minutes at resource 1 and 2 minutesat resource 2. Type 2 customers also spend 5 minutes at resource 1, but spend 10 minutes atresource 2. Finally, type 3 customers spend no time at resource 1 and 8 minutes at resource2. Each hour, the demand is 10 customers of type 1, 4 customers of type 2, and 2 customers oftype 3. Where in the process is the bottleneck? What is the flow rate for each customer type?arrow_forward
- The ore of a gold mine in the Mountain Province contains, on the average, 2 gram of gold perton. One method of processing cost ₱1,800.00 per ton and recovers 90% of the gold, whileanother method cost only ₱1,400.00 per ton and recovers 85% of the gold. If the gold can besold at ₱8,000.00 per gram, which method is better and by how much?arrow_forwardA serial process has 5 steps – A (4), B(5), C(2), D(6), and E(3) – that have to be performed in this order. The numbers in parentheses are the times (in minutes) needed to process a unit. For each unit produced by this process, the process has a total idle time of: Group of answer choices 1 min 10 mins 6 mins 3 minsarrow_forwardMr. Elf owns a show store. Currently, he has 10 pairs of shoes that require resoling and polishing. He has a machine that can resole one pair of shoes at a time, and the time required for the operation varies with the type and condition of the shoe and the type of sole that is used. Shoes are polished on a machine dedicated to this purpose as well, and polishing is always done after resoling. His assistant generally does the polishing while Mr. Elf does the resoling. The resoling and polishing times (in minutes) are: Shoes 1 Resoling Time 14 Polishing Time 3 2 28 1 3 12 2 4 6 5 5 10 10 6 14 6 7 4 12 8 25 8 9 10 15 10 5 5 Determine the sequence in which these shoes should be repaired to minimize the total makespan for these 10 jobs, and answer the following questions. Based on the optimal sequence: (Enter integer only) 1. The first job to be processed is Job 2. The third job to be processed is Job 3. The fourth job to be processed is Job 4. The fifth job to be processed is Job 5. The…arrow_forward
- please provide excel sheet calculationsarrow_forwardA factory has two stations, station X and station Y. There are two different types of units, flow units A, and flow units B. The table below includes details about how long each unit type spends at each station: Flow Unit A Flow Unit B Station X 6 min 5 min Station Y 15 min 4 min The demand rate: Flow units A: 10 units per hour. Flow units B: 15 units per hour There are 4 machines at station X and 2 machine at station Y. What is the flow rate for unit B?arrow_forwardA company produces motor cycle seats. The company has two production lines. The production rate for line one is 50 seats per hour and for line two it is 60 seats per hour. The company has entered into a contract to supply1200 seats daily to another company. Currently, the normal operation period for each line is 8 hours. The production manager 4 | P a g eof the company is trying to determine the best daily operation hours for the two lines. He sets the priorities to achieve his goals as given below:- P1: produce and deliver 1200 seats daily- P2: limit the daily overtime operation hours of line one to 3 hours- P3: Limit the daily overtime operation hours of line two to 4 hours Formulate the problem as a GP model and then solve it by using graphical methodarrow_forward
- A company plans to produce 25,000 units in a 3-month period. The months have 22, 21, and 20 working days, respectively. What should the average daily production be?arrow_forwardMack's guitar fabrication shop produces low cost, highly durable guitars for beginners. Typically, out of the 100 guitars that begin production each month, only 82 percent are considered good enough to sell. The other 18 percent are scrapped due to quality problems that are identified after they have completed the production process. Each guitar sells for $240. Because some of the production process is automated, each guitar only requires 10 labor hours. Each employee works an average of 160 hours per month. Labor is paid at $10 per hour, materials cost is $40 per guitar, and overhead is $3,800. Part 2 a. The labor productivity ratio for Mack's guitar fabrication shop isarrow_forwardJOHNSON’S RULE Five specialty jobs at a La Crosse, Wisconsin, tool and die shop must be processed through two workcenters (drill press and lathe). The time for processing each job follows:Work (processing) Time for Jobs (hours)JOBWORK CENTER 1(DRILL PRESS) WORK CENTER 2(LATHE)A5 2B3 6C8 4D 10 7E 7 12arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,